A Lean Six Sigma (LSS) team within a manufacturing quality testing laboratory environment identified gaps in rescue-and-response standard work for a Bolling mill machine. The Bolling mill is a type of calender (or smoothing) mill used to mechanically process uniform sheets of rubber. In the laboratory environment, the Bolling mill supports quality assurance testing of production and pilot recipes. But as so often can be the case with machinery, this machine poses a danger to its operators. Operators feed stock rubber for mixing and sheeting into exposed rollers. One careless moment can lead to an individual needing to be rescued from the rollers and pinch points. The rescue-and-response standard work refers to the procedure for performing such a rescue.

This facility’s Six Sigma coordinator was touching base with team members who had gone through Yellow Belt training but had yet to complete a certifying project. An uncertified Yellow Belt new to this lab environment identified the opportunity to improve the Bolling mill rescue-and-response standard work. The team member was partnered with a mentor LSS Black Belt located at the facility. Then, the project was chartered and a team was formed to improve the rescue-and-response time for the Bolling mill machine.

Defining and Measuring the Current State

The improvement team began to scope and define the problem, following an A3 project format. The Bolling mill machine supports multiple production tests and trials for the 24/7 production facility. The machine is intended to be operating, on average, three to four hours per 12-hour shift. The team went through instructions and breakdown during a current-state assessment of rescue standard work.

As a part of the current-state assessment, the team established a baseline performance to the standard work for rescue-and-response time by conducting a structured gemba activity. The gemba activity involved a role-play drill to the current standard work; the exercise was video recorded for data collection and subsequent review. While reviewing and performing this drill, the team observed deficiencies in the standard work to perform the rescue. The team defined a baseline rescue-and-response time (7.14-minutes) while noting that rescue tools and supplies were difficult to find during the training exercise (Figure 1).

Six Sigma Exam Prep, Six Sigma Learning, Six Sigma Guides, Six Sigma Career, Six Sigma Prep, Six Sigma Study Material
Figure 1: Current-State Mill Rescue Box

Analysis to Close the Gaps


The team mapped the current-state process flow (Figure 2) to see the process of rescue and response and to call out the obstacles and gaps within the process. An analysis of the Bolling mill machine operation standard work revealed several gaps between the needs identified in the gemba and the work standard. Data supporting the standard work analysis was available from the drill exercise video recording. The results were worrying.

◉ Clear instructions for extraction and rescue from the Bolling mill in an emergency situation were not included in the standard work.

◉ The roles and responsibilities for team members responding to an emergency situation were found in the standard work but were unclear.

◉ Finally, the rescue tools and supplies required by the standard work were could not be located in the work environment and therefore could not be put to use in a timely manner.

◉ Waste in the forms of waiting, extra processing, transportation and motion were also evidenced during the drill exercise.

Six Sigma Exam Prep, Six Sigma Learning, Six Sigma Guides, Six Sigma Career, Six Sigma Prep, Six Sigma Study Material
Figure 2: Current-State Process Map

Next, the team brainstormed and created an affinity diagram of the observations from the drill exercise. This led to the construction of a fishbone diagram. The team presented the affinity and fishbone diagrams to the laboratory team, collaborating to ensure best practices and tribal knowledge were not overlooked.

The working sessions between the improvement and laboratory teams validated the scope and problem statement for the project. The current-state assessment helped the team to understand and establish the baseline and also clarified which stakeholders would contribute, influence and enable the project.

The team moved the work forward by taking the collaborative fishbone diagram and identifying primary root causes using the 5 Whys. The root cause analysis was developed through interviews and working sessions and included several laboratory team members. A future-state process map was created, including proposed countermeasures. The team validated the countermeasures through gemba and analysis of the drill exercise video which supported prioritizing the improvement actions.

Improvement Actions Prepared


Priority countermeasures identified by the team were summarized as:

◉ Marked the mill machine with arrows indicating correct open direction

◉ Placed rescue tools and supplies (including sledgehammer, flashlight, nylon and steel wedges, wrenches, pry bars, PPE, utility knife, first aid supplies and a sealed bloodborne pathogen kit) in a cart on wheels (Figure 3)

◉ Floor markings designated a “no parking zone” reserved for the rescue response cart

◉ Job instruction posted at point of use

◉ Converted written standard work to video standard work

The team implemented the improvement actions in a phased approach. Prior to implementing countermeasures that required a commitment of resources, the team performed a pilot test. The future-state drill collected measurable results; the exercise was video recorded for data collection and analysis. The team measured a future-state rescue-and-response drill exercise time of 4.59 minutes – a 2.55-minute (35 percent) improvement.

Six Sigma Exam Prep, Six Sigma Learning, Six Sigma Guides, Six Sigma Career, Six Sigma Prep, Six Sigma Study Material
Figure 3: Rescue Cabinet, Tools and Supplies – Labeled and Visible

The team created a focused communication plan, inclusive of the stakeholders identified through the project. The communication plan detailed the changes and improvements that the project accomplished and determined a go-live date for the implementation of the standard work, training and countermeasures.

Sustaining the Improvements


The team created a control plan to sustain the countermeasures and improvements implemented by the project. An area of focus that reflected efficiency improvement and results was correlated to the location of rescue tools and supplies. The new cart would be audited on a weekly basis, performed using a barcode scan of the tools and supplies, and producing an audit accountability record with traceability. The audit would include taking actions if tools and supplies were missing.

The team determined through a barriers-and-aids analysis that drill frequency was inadequate; the frequency of Bolling mill machine rescue-and-response drills was increased from annually to quarterly. The standard was updated to perform functional safety checks every shift for the Bolling mill machine, ensuring the safety features and interlocks of the machine respond appropriately.

This functional safety check is performed through a hand-scanner application, producing an audit accountability record with traceability.

Conclusion


In a positive safety culture, existing safety processes are constantly improved. This project was proactive in its approach, openly communicated and employees were engaged to spark positive improvement. The project’s success is entirely due to involving the experience and tasks of the frontline team.

The benefits of increased drill frequency will allow for the laboratory team to gain more experience with the standard work-and-rescue process, being prepared should an actual event occur. Using the LSS problem-solving methodology the team identified process drivers to arrive at root causation, created effective countermeasures and avoided iterative cycles of fix and hope for improvement. (Figures 4 and 5 show the project’s results within the A3 format.) The project was selected to share with the company’s Voluntary Protection Program recertification team because it exhibited excellent employee-driven improvement.

Six Sigma Exam Prep, Six Sigma Learning, Six Sigma Guides, Six Sigma Career, Six Sigma Prep, Six Sigma Study Material
Figure 4: A3 Project Summary (Click to Enlarge)

Six Sigma Exam Prep, Six Sigma Learning, Six Sigma Guides, Six Sigma Career, Six Sigma Prep, Six Sigma Study Material
Figure 5: A3 Project Summary (Cont.) (Click to Enlarge)

Overall, this project resulted in:

◉ A team member completing their Yellow Belt project and earning their certification.

◉ The facility gaining more advocates for continuous improvement.

◉ The response time for a safety incident improving from 7.14 minutes (baseline) to 4.59 minutes, a reduction of 35 percent.

Saturday, 9 January 2021

Finding a Value-added Fit with Agile Development

The gains that Lean Six Sigma has brought in the areas of manufacturing, operations and physical product design speak for themselves. It is natural to want to replicate that success in software design. To do that most effectively, however, practitioners must meld Lean Six Sigma with Agile, a software development technique that is gaining traction in the industry.

Linking the two can be difficult. The fit involves some grounding in Agile methods and revisiting the core essences of DMAIC and DFSS (Design for Six Sigma). Practitioners must carefully consider the potential gains from using Lean Six Sigma in an Agile software development environment. But first they need to understand what sets software design apart from other product development.

What Makes Software Unique


With hardware design, a lot hangs on getting the design right the first time. There is big value, as well as big risk, in making decisions on such things as architecture, components, manufacturing equipment and tooling – elements that are difficult or expensive to change after the fact. Because of that, Lean Six Sigma in physical product design typically focuses on predicting capabilities, tolerance analysis and critical parameter management. The design process is usually controlled through sequenced phases with gates enforcing a review of requirements and decisions before actions are taken.

Software, whether standalone or embedded in a hardware product, is just as important to get right, of course. But instead of physical dimensions and tolerances, good software depends more on the ongoing flow of experimentation and understanding, which results in improved iterations. Designing software in the same way as hardware, with sequenced phases and locked-in decisions, can reduce the eventual value of the software and increase the risk of costly mistakes.

In software, the cost of creating new iterations is small when taking into account the learning derived; this learning pays dividends to a design. Iteration does not mean meandering aimlessly; instead, it is highly focused, closed-loop experimentation, where customers and developers can learn things they would not have known if forced to sign off on all aspects of requirements up front. Iteration can be value added if done well in the right settings. This theory is the basis for the Agile development method.

The Need for Agile


Managing software development with a gated, waterfall model taken from hardware product design can be costly. Oversimplifying for convenience, Figure 1 illustrates a value/risk pattern for developing with this method, which, as shown, can become a vicious circle.

Six Sigma Exam Prep, Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Prep, Six Sigma Learning
Figure 1: Causal Loop Diagram of Waterfall Software Development

The arrow in Figure 1 indicates a development pressure point, where work is commonly batched. Organizations may try to squeeze into play more features and requirements than developers know will fit, creating schedule compression and work in process (WIP). To compensate for these additions, haste and task-switching also increase. In a hurry, without enough time for thinking and communicating, developers constantly change gears from one thing to another, leading to gaps in communication, understanding and communication, and incurring risk of mistakes and omissions. That drives extra work and rework into the system and drains available time, increasing schedule pressure – and the cycle starts again.

Agile software development took shape as an antidote to that cycle. Mechanisms to reduce and control WIP, curtail task switching, and close gaps in communication and understanding are built into the foundation of most Agile processes. Agile software development is a combination of Scrum (a term borrowed from rugby, and referring to the team-based process used to push the project along) and Extreme Programming (XP) – referring to the technical practices, including coding, testing and feedback, used to support quality work.

Scrum in a Nutshell


Inspiration for Scrum came from Dr. Jeff Sutherland, a medical science researcher designing a novel diagnostic imaging system. Being responsible for such a complex system reliant on software, he saw the vicious circle up close. As he thought about how to break that cycle, his background in physics and as a pilot provided some insight about reducing turbulence and improving flow.

The process he came up with – Scrum – is fairly simple but the results are significant. It limits development work in process; removes gaps that in the past had separated customers, analysts, developers and testers; and matches and tracks the right work with the right people. The mechanics of Scrum are shown in Figure 2.

Six Sigma Exam Prep, Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Prep, Six Sigma Learning
Figure 2: Scrum Schematic

Product backlog – This is a list of potential software features or requirements for developers to work on, prioritized by value and risk. A product owner works with customers and developers to consider the next increments to deliver to increase functionality or performance of the software, or to reduce any significant risks.

Sprint – This is set time period (e.g., 30 days) in which the development team focuses on a set list of goals, or features. Before beginning a new sprint, the team assesses its current availability and past work habits using data and discipline connected with prior sprints to decide how much work they can pull from the product backlog into a list of features to be implemented during the current sprint (known as the sprint backlog). Central to this sprint planning is setting up conditions where team members can focus and work to their highest quality standards, without heroics, burnout, or risk of defects and waste. This is a WIP control mechanism, because it is used to pull work into the process at the sustainable rate at which it can be done well.

Daily stand-up – A daily stand-up meeting is held to bring to the surface issues and obstacles using three check-in questions:

1. What’s been done since the last meeting?
2. What are the team’s plans until the next meeting?
3. Are any obstacles anticipated before the next meeting?

The meeting is meant to be short and to the point. Because these open meetings are held so regularly, they provide a powerful transparency and foster learning and adaptation. With Scrum, risk and gaps connected with work completion or performance cannot hide. Whatever is going on, good or bad, will come into view in real time.

Features delivered – At the end of each sprint, the team delivers tested features, sometimes completing a customer project. In other cases the team delivers features that will increase the strength of an emerging product. Done well, Scrum provides insurance against losses if a project is canceled, as the increments delivered tend to stand on their own and may have value in other projects.

Benefits of Agile for All


Switching to the Agile model of development can be a monumental shift for some organizations. Despite the changes in process, however, the method has gained much support from the three factions involved in software development:

◉ Customers – Before Agile, they had to sign off on requirements for new product development at the outset, before they really knew enough to do that – paying dearly for any changes. They typically find Agile teams more responsive and flexible.

◉ Software managers and business leaders – They see the value stream moving more quickly, where the path from discovery to successful delivery is shortened and reduced in cost. They are also happy to see fewer resources spent on rework.

◉ Developers – As W. Edwards Deming said, people want to do a good job, and they enjoy getting the chance to actually do it. When developers get into the Agile workflow, they often take pride in high quality, customer-focused work. They show this by voting with their feet, leaving companies that do not become more Agile, and bringing their talents to the companies that do.

Potential Gains of Combining Agile with Lean Six Sigma


With this background in Agile, practitioners are better prepared to consider a value-added integration with Lean Six Sigma. DMAIC and DFSS thinking and tools have much to offer Agile users; however, the practitioners must do some tailoring to help the methodologies fit together.

DMAIC Thinking and Tools


Because Agile teams thrive on spotting and removing problems, constraints and waste, they are well prepared for using DMAIC thinking and tools. While they may not conduct full DMAIC projects, they can use tools such as causal analysis, mistake proofing and ongoing process controls. Although Agile teams work in sprints, that does not mean they sacrifice attention to detail for speed. Agile teams like to measure, observe carefully, reflect and adapt – a progression that is a close cousin to the classic Plan-Do-Check-Act that was the early basis for DMAIC.

Essence of DFSS – Beyond the Waterfall


A linear DFSS roadmap such as DMADV (Define, Measure, Analyze, Design/Build, Verify) may remind Agile software developers of the sequential hardware design method. Therefore, the method must be re-mapped to avoid losing the attention of these developers. It is possible to use DFSS in a way that supports iterative development, as shown in Figure 3.

Six Sigma Exam Prep, Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Prep, Six Sigma Learning
Figure 3: DFSS Supporting Linear and Iterative Development

DFSS can be viewed as an array of capabilities and questions that are posed and answered, but not necessarily in sequence. Whether in sequence, or as needed and iteratively, these capabilities and questions are important in good design, and they are not covered in the foundation practices of Scrum and XP. By emphasizing the iterative DMADV roadmap, Lean Six Sigma practitioners can add value to software development. It may help to break down the influence by phase:

Define – Software teams care about the issues that must be addressed in a design, and one thrust of Agile is to get closer to customers to increase value discovery. However, practitioners must be ready to streamline the look and feel of customer visits or VOC data collection. Agile teams may favor quick conversations at a whiteboard to structured interviews and survey analysis. They will favor self-documenting user stories over rigorous, formal requirements documents. This should still allow them to gather good data and mine it for insights.

Measure – All developers look for information from customers to support their design and feature decisions. Agile teams will favor ongoing dialogue, fueled by regular customer demos that deliver working increments. For them, Measure might mean gathering the right numeric and language data during those incremental demos and tests.

Analyze – With solid information about what is important to address (determined in Define) and the dynamics informing design and feature choices (Measure), it is time to prioritize what will be delivered, when, and using what resources. This is the crux of the Scrum product backlog and planning for a sprint. The matching of those features or requirements with a sprint and an Agile team still calls for some estimation using past data regarding team capability (speed and accomplishments of recent sprints). Attention to measurements and learning from patterns in past sprints are very important to Agile teams.

Design/Build – Although gated, linear design and Agile, iterative design use different means, they work to achieve the same end – implementing a design that achieves the right things. Scrum seeks transparency and rapid, fact-based learning cycles to uncover and quickly resolve issues. Lean Six Sigma tools such as design FMEA and verifiable design performance models can be a perfect fit. It is all about closed-loop control and rapid flow of results, as evidenced in the daily stand-up meetings.

Verify – The XP aspects of Agile are built around test-driven development, which integrates aspects of testing with the software coding so that many risks and test bottlenecks never happen. When it comes to integration and system level testing, Agile teams seek to measure results in customer terms, using voice of the customer feedback. Their job is not done until real users actually derive value from the delivered product.

The Path Forward


In preparation for finding the right fit for Lean Six Sigma within Agile development, it helps to appreciate some ways that software is fundamentally different than hardware and survey the current state of Agile. With this perspective, it is possible to see how DMAIC and DFSS can provide tools and methodology that add value to Agile environments. By re-mapping their understanding of Lean Six Sigma’s classic paths, practitioners can work to successfully integrate the methodology with Agile development.

Friday, 8 January 2021

Need for Six Sigma in the Age of Information Technology

Since the start of the information technology age, software quality has been an ambiguous term, meaning different things to different people. It has been defined internally from the viewpoint of software developers; and it has been defined externally from the viewpoint of end users of the software. But either way, early in the history of software development it was obvious that software could not be developed in an ad hoc manner but needed to be subject to rules/methodologies to deliver a product or service that had attributes like robustness, correctness, adaptability, reusability and maintainability.

During the last couple of years numerous software development methodologies have been introduced to guide development teams in achieving these quality goals. Some methodologies involve a disciplined and detailed process with strong emphasis on planning. Examples of such methods include capability maturity model (CMM), software process improvement and capability determination model (SPICE), team software process (TSP), personal software process (PSP), etc. Then recently some Agile methods have been advocated as a new paradigm for high-speed, quick-to-market software development. Examples include extreme programming (XP), SCRUM, etc. The basic critique of the agile software development evangelists is that conventional software development processes are too rigid to achieve the end-results let alone the aimed quality factors for contemporary projects.

But one thing is sure: no matter which process/methodology is applied, the bottom line is that there is an impact of software processes on the software quality factors.

Software/IT Success-and Failure Rates

In what most consider a mature software/IT industry, the success/failure rate is not as good a one might expect. In fact, surveys by professional bodies like the Standish Group, Robbins-Gioia, KPMG, OASIG, etc. reveal a dismal picture. Some results from the 1995 Chaos report by the Standish Group found out the following:

◉ Some 31 percent software projects were cancelled before completed.

◉ About 52 percent projects cost almost double of original budget estimates.

◉ Only 9 percent of projects were on-time and within budget.

◉ On average, more than 50 percent of the effort of producing software went into testing.

◉ More than 50 percent of the costs associated with software development were incurred after delivery.

Even though the numbers tended to improve with the later reports, the top reasons found for project failures are still the same:

◉ Lack of user input

◉ Incomplete requirements and specifications

◉ Changing requirements

◉ Lack of executive support

All this leads to the conclusion that the business value of IT is still only vaguely perceived. And with the current watch on technology investments, there is even greater need for obtaining a good return on investment (ROI) on money spent on technology. A disciplined approach to software generation is quintessential if this goal is to be accomplished.

Quality Has to Reflect on the Bottom Line

When one looks at an industry structure, it becomes apparent that the focus of the players depends on the relative competitive positioning. In a monopoly or an oligopoly (few key players), the companies typically look at their cost and add a mark-up (to get the sought-after market volume) to get to a certain selling price. The equation looks like:

Cost + Profit = Selling Price

But as the industry structure moves towards greater competition with many players providing almost a commodity product/service, the perspective of the equation changes:

Selling Price – Cost = Profit

It is a different paradigm when the players have similarly priced products. The only way to gain competitive advantage is to focus on minimizing the costs that reduce the bottom line. Minimizing costs is exactly where the IT and application development industry is. The current critical nature of software and application development in a product or service offering has elevated the importance of the software process in ROI considerations. Especially for any new IT initiative, there is a lot of effort to insure a satisfactory return on investment.

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Career, Six Sigma Guides
Figure 1: Optimizing Project Costs

It can be a challenge to summarize the cost and benefit factors and values that contribute to estimating ROI in any project. This is where Six Sigma offers a set of tools for tracking and enabling success. The Six Sigma value proposition is directly tied to positive financial results, and hence the methodology often has the buy-in of top management. This focus on financial results ensures that executive buy-in remains through the execution and rollout phase of a project, the lack of which is a major reason of failure of IT projects. It also ensures business discipline in project selection and project tracking, with a focus on maximizing the benefits delivered to the bottom line. The Six Sigma philosophy is that satisfied customers come back for more and encourage their business associates, family and friends to do the same. It recognizes that the ultimate quality award is improved bottom-line profitability.

Using a Holistic View of All Costs


As suggested in Juran’s Quality Handbook, analysis of many application development projects has consistently revealed two facts:

1. Almost half of the development resources are used for testing.
2. Almost 70 percent of total resources over the life of the software are used in maintenance.

Hence, cost savings can be realized only with methodologies that yield high quality initially and manage the change control process. This becomes even more relevant with the recent emphasis on a fundamental decision-support tool called “total cost of ownership.” This tool requires a holistic view of all costs across the organization that will be incurred throughout the life cycle of the project, including people, processes and technologies.

The typical cost drivers of a Six Sigma initiative for software process improvement that are essential inputs into the ROI estimating process, include:

◉ Training costs, labor hours and travel costs
◉ Project costs, activity costs and administration
◉ Costs of customizing processes
◉ Response conditioning costs
◉ Appraisal costs (those resulting from examining activities for execution errors)

Typical benefits of such an effort include:

◉ Better quality with fewer defects
◉ Less rework and lower maintenance costs
◉ Faster cycle times – quicker time-to-market for new products
◉ Higher productivity, leading to lower development and design costs
◉ Higher business value (typically more product value to customers)
◉ Higher customer satisfaction leading to higher revenues

So What Is Six Sigma for Software?


Six Sigma practitioners follow these tenets as a business philosophy:

◉ If something cannot be measured, we really do not know much about it.
◉ If we don’t know much about it, we cannot control it.
◉ If we cannot control it, we are at the mercy of chance.

And so Six Sigma, in general, measures deviations from an ideal. The measurable thing may be the process used to make a toothbrush, whose material specifications and costs are measured and compared to ideal material specifications and ideal cost. Or it may be the process of a stock brokerage, where quality of service and cost of service are measured against ideals of quality and service. When it is applied to IT, Six Sigma measures attributes like network speed, network reliability and relevant line of business processes.

Thus, measurements are made to gain an understanding of processes to see what works and what does not; to evaluate, predict and determine status with respect to plans; and to improve (rational use of quantitative information to identify problems and strategies to remove them).

Six Sigma started in the manufacturing industry with emphasis on management of efficient processes, efficient management of people, dedication to measurement systems, etc. But it became apparent that business success was more than the absence of negatives (defects, delays, cost overruns). Six Sigma then began to encompass positives like customer loyalty and delighters in new products. From operational excellence, Six Sigma has moved towards customer intimacy and product leadership value disciplines.

There are essentially two approaches to ensure software quality:

◉ Assurance of the process by which the product is developed.

◉ Evaluation of the quality of the end product.

There is always need to study both the quality of the software product and the life-cycle cost incurred in the development and maintenance of the products. The quality of software has been studied mainly from defect analysis and software maintenance perspectives. The effect of the process used in a software project on the outcome of the project in terms of cost to the software developer and quality of the product is key. And this is where Six Sigma for software comes in. It hold that the process of generating the product is more important than the product itself.

Application Development Not Like Manufactuing


But an IT person will immediately point out, application development is not like manufacturing since process variation can never be eliminated because:

◉ No two modules are alike and so performance includes an intrinsic degree of variability.
◉ There is great variation in human cognitive processes – differences in skills from one developer to another.
◉ Quality assurance processes work differently for manufactured goods than they work for software. This is because software products need testing only once before being called “acceptable,” and it is the same “acceptable” program that is distributed to customers. Thus, unlike a traditional factory where there are many different independently produced units that are each tested, a software factory produces one program.

Yet the software application development processes can be fully characterized by three simple measurements:

◉ Time: The time required to perform a task.
◉ Size: The size of the work product produced.
◉ Defects: The number and type of defects, and fixing time.

Six Sigma for software is not a software development process definition – instead it is a general methodology for improving processes and products. It provides a holistic quality objective in product development, combining a programmer’s desire for bug-free piece of software and a user’s desire for an easy-to-use application that fulfills a business need. Although a few elements of the Six Sigma toolkit are invoked within other methodologies like the Software Engineering Institute’s PSP/TSP framework (e.g., regression analysis for development of estimating models), there are many other tools available in the Six Sigma for generating good quality software products.

For instance, voice of the customer (VOC) and quality function deployment (QFD) are useful for developing detailed and prioritized customer requirements (both stated and unstated). More than just sending out survey forms, these tools involve creating meaningful customer feedback. VOC is captured in a variety of ways – direct interviews, surveys, focus groups, customer specifications, observations, etc. This understanding of the customer needs is then summarized in a matrix or QFD. These tools ensure that the following necessary steps are taken care of:

◉ Identifying customers in a given business scenario.
◉ Recognizing the benefits of clearly defining customers’ requirements.
◉ Creating a critical-to-quality needs tree in a given business scenario.
◉ Determining the appropriate Kano model category on which to focus customer improvement efforts.

Then there are numerous charting/calculation techniques that can be used to scrutinize cost, schedule and quality (project-level and personal-level) data as a project proceeds. For technical development, there are quantitative methods for risk analysis and concept/design selection.

Once management has driven the business strategy down to projects, one can work on them with the Six Sigma DMAIC approach – define, measure, analyze, improve, control. This starts with the assumption that all work is a process. And the goal is to improve the process in general. But Six Sigma applications in software also reach beyond the business goal of improving current processes/products and extend to design of new processes/products. Six Sigma incorporates the Design for Six Sigma (DFSS) approach to improving the feature/function/cost trade-off in definition and design of the software product. Tools such as KJ analysis, QFD, conjoint analysis, design of experiments (DOE) and many others have high leverage applications in the world of new product development in software.

Six Sigma and Other Methodologies


There are many models that have been used for disciplined application development and the key to understand is that the disparate quality models need to be evaluated in the context of business objectives. Project characteristics that determine the relevance of a particular methodology can be broadly based on following dimensions:

Project Size: This is not only the measure of lines of code or megabytes of data, but primarily the complexity of the system, the nature of its main components, interactions and – importantly – the size and composition of the development team.

Application Domain: This includes not only the domain of environmental management but also the characteristics in more technical terms – real-time, distributed (client/server architecture with both LAN and WAN elements), decision support objective, etc.

Criticality: Projects of high criticality like the ones doing forecasting for weather conditions, or decision-support systems in important domains like emergency healthcare need rigorous methodologies to ensure the quality.

Innovation: If a project is a research project, involving a number of new and partly not yet proven technologies, like 3D dynamic simulation, a fair amount of process customization can be done to eliminate need to follow rigid procedures.

Figure 2 provides a matrix that suggests a way of selecting a model for a certain project.

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Career, Six Sigma Guides
Figure 2: Matrix for Selection Model for Project

Heuristically, it has been found in the application development industry that Six Sigma for software begins to be cost-effective once the organization has reached CMM Levels of 4 or 5. As an organization matures to those levels, it begins to truly leverage established measurement practices, and that is when accomplishment of true Six Sigma performance becomes a relevant goal. And at that point, Six Sigma and approaches such as CMM/CMMI, PSP and TSP become complementary and mutually supportive. From a corporate strategy viewpoint, Six Sigma is an enabler to launch CMM, CMMI, PSP, etc. with similar tools, methods and concepts of continuous improvement. And yet it differs from CMM/CMMI in that:

◉ Six Sigma speaks the language of business, addressing costs, profitability and ROI.

◉ Six Sigma projects are drawn from a portfolio of problems that are identified through business strategy while CMM linkage to strategy is weak.

◉ Six Sigma teams consist of highly trained employees from many departments of the company, not just quality assurance. (called Boundary-less collaboration).

◉ Six Sigma is typically applied to selected projects, while CMM/I/PSP/TSP are intended for all projects across the organization.

◉ Six Sigma makes it impossible, like with practices such as CMM, to fall into the trap of laying a veneer of process over the same old activities.

◉ Six Sigma may be applied to the improvement of many other business practices other than the primary goals of CMMI/PSP/TSP (software product cost, cycle time and delivered quality). Such practices include improved customer service after delivery of the software, improved customer satisfaction and value realization from the software product feature set delivered. Six Sigma applies to the software process, the software product and to balancing the voice of the customer and the voice of the business (the stated and unstated needs of the businesses/shareholders) to maximize overall business value resulting from processes.

The most fundamental tenet of Six Sigma is that the business must be “managed manage by fact.” This view is consistent with that of TSP/PSP, but it has not yet been established that PSP/TSP is the best alternative in every context, only that it is better than some alternatives. Six Sigma can help organizations find the solutions that are truly optimal for each unique circumstance.

Wednesday, 6 January 2021

The Five Essentials for Software Testing

Six Sigma Tutorial and Material, Six Sigma Exam Prep, Six Sigma Certification, Six Sigma Career

The following advice should help clarify your thinking about software testing and help you improve the effectiveness and efficiency of your testing. It is helpful to think about software testing in terms of five essential elements:

1. A test strategy that tells you what types of testing and the amount of testing you think will work best at finding the defects that are lurking in the software

2. A testing plan of the actual testing tasks you will need to execute to carry out that strategy

3. Test cases that have been prepared in advance in the form of detailed examples you will use to check that the software will actually meet its requirements

4. Test data consisting of both input test data and database test data to use while you are executing your test cases, and

5. A test environment which you will use to carry out your testing.

If any one of these five elements is missing or inadequate, your test effort will most likely fall far short of what you could otherwise achieve.

Test Strategy


Six Sigma Tutorial and Material, Six Sigma Exam Prep, Six Sigma Certification, Six Sigma Career
The purpose of testing is to find defects, not to pass easy tests. A test strategy basically tells you which types of testing seem best to do, the order in which to perform them, the proposed sequence of execution, and the optimum amount of effort to put into each test objective to make your testing most effective. A test strategy is based on the prioritized requirements and any other available information about what is important to the customers. Because you will always face time and resource constraints, a test strategy faces up to this reality and tells you how to make the best use of whatever resources you do have to locate most of the worst defects. Without a test strategy, you are apt to waste your time on less fruitful testing and miss using some of your most powerful testing options. You should create the test strategy at about the middle of the design phase as soon as the requirements have settled down.

Testing Plan


A testing plan is simply that part of your project plan that deals with the testing tasks. It details who will do which tasks, starting when, ending when, taking how much effort, and depending on which other tasks. It provides a complete list of all the things that need to be done for testing, including all the preparation work during all of the phases before testing. It shows the dependencies among the tasks to clearly create a critical path without surprises. You will be able to start filling in the details of your testing plan as soon as your test strategy is completed. Both your test strategy and testing plan are subject to change as the project evolves. Modify your strategy first, if you need to, and then your testing plan.

Test Cases


Your test cases (and automated test scripts if called for by your strategy) are prepared based on the strategy which tells you how much of each type of testing to do. Test cases are developed based on prioritized requirements and acceptance criteria for the software, keeping in mind the customer’s emphasis on quality dimensions and the project’s latest risk assessment of what could go wrong. Except for a small amount of ad hoc testing, all of your test cases should be prepared in advance of the start of testing. There are many different approaches to developing test cases. Test case development is an activity performed in parallel with software development. It is just as difficult to do a good job of coming up with test cases as it is to program the system itself. In addition to figuring out what steps to take to test the system, you need to know the requirements and business rules well enough to predict exactly what the expected results should be. Without expected results to compare to actual results, you will not be able to say whether a test will pass or fail. A good test case checks to make sure requirements are being met and has a good chance of uncovering defects.

Test Data


In addition to the steps to perform to execute your test cases, you also need to systematically come up with test data to use. This often equals sets of names, addresses, product orders, or whatever other information the system uses. Since you are probably going to test query functions, change functions and delete functions, you will most likely need a starting database of data in addition to the examples to input. Consider how many times you might need to go back to the starting point of the database to restart the testing and how many new customer names you will need for all the testing in your plan. Test data development is usually done simultaneously with test case development.

Test Environment


You will need a place to do the testing and the right equipment to use. Unless the software is very simple, one PC will not suffice. You will need all of the components of the system as close as possible to what it will eventually be. Test environments may be scaled-down versions of the real thing, but all the parts need to be there for the system to actually run. Building a test environment usually involves setting aside separate regions on mainframe computers and/or servers, networks and PCs that can be dedicated to the test effort and that can be reset to restart testing as often as needed. Sometimes lab rooms of equipment are set aside, especially for performance or usability testing. A wish list of components that will be needed is part of the test strategy, which then needs to be reality checked as part of the test planning process. Steps to set up the environment are part of the testing plan and need to be completed before testing begins.

Monday, 4 January 2021

Usage-based Models Improve Odds in Software Testing

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Guides

The need to test products of all kinds, software and physical products, often runs into challenges connected with:

◉ What to test?
◉ How to test?
◉ How long, how many tests to run?
◉ How to document the risk remaining after test?

Software is particularly challenging because the properties worth exercising and assessing in tests are hard to see and measure, and sometimes even hard to define. While there are no silver bullets, there are some approaches to testing that improve the odds of finding the most important software operational and performance weaknesses with reasonable investments of time and resources. One such test approach, often called usage-based, has statistical roots and some connections that Lean Six Sigma Black Belts could effectively support and perhaps evolve.

Approaches to Software Test


One way to sort out test strategies is by the way each one looks at and plans to exercise the unit, component or system of interest. Such sorts might be:

◉ Internal, Path and Logic View: Looks at software from the perspective of its executable image in a target system. Testing in this view, involves covering the logical pathways through that image (branches, loops, etc.) and tracing the implications of that image on the target system (memory allocation and release, timing, etc.) Classic tools like McCabe’s complexity analysis and an evolving set of new tools are able to inform and focus test planning and analysis from this gutsy inside view of the software in action.

◉ Combinatoric View: Views software and related systems in terms of the combinations of components and infrastructure that may find themselves having to work together. For example, a software product may have to run in combination with various peripherals, browsers, operating systems, network protocols, etc. Testing, from this perspective often involves finding an efficient subset of all possible combinations (which might be overwhelmingly hard or time-consuming to do). The Six Sigma eye for fractional experimental designs sometimes sees this as an opportunity – but not without risk that should be understood.
.
◉ Usage-based Models: Look at a system, at a useful level of granularity, from the perspective of the states, transitions, events and actions that can describe its behavior at that level. As testing may involve simulating events and documenting the actions that ensue, such a model will scope out what complete coverage would look like (the exhaustive array of potential tests) – but, more usefully, it can help identify a statistically efficient subset of those tests that might be worth running first.

A Stochastic Network, or Markov Chain


A states-and-transitions view of any system, where the future behavior only depends on the current state (i.e., it is memory-less) may be modeled as a stochastic network or, more commonly, a Markov Chain (for the mathematician Andrey Markov).

In software, a state machine may often have this property – as the way a state machine will respond to a next event depends only on its current state (not how it got there or what happened prior).

Here is a simple example to walk through the steps involved in building and using a software system Markov Chain. In doing so, some key ways that the model can help inform test planning and assessment can be explored.

Creating and Using a Usage-based Model


1. Understand the scope of users, requirements and system behavior detail to be modeled. Usage-based implies a sense of the scope and nature of actor-triggered events that may be encountered. Sometimes this depends on the class of users (e.g., experts, new users, special-purpose users).

Once clear about what is meant by users, then, which range of requirements and specifications will be in the scope of the model? While it may be tempting to set out to model all aspects of a broad system – common sense and other reality often dictates some divide-and-conquer thinking that carves out parts of the system for test in any one endeavor.

Given the user and requirements scope, the related question to answer is: What level of detail? Is it at the highest level, looking at end-user interface events and actions, or at a finer granularity, looking at components and messages triggering actions in side the system? Figure 1 illustrates the range of granularity that a usage-based approach might span. At the high level, a user with keyboard and mouse are often the interface of interest. Transitions and new states mean things like webpage or screen changes

A lower level may depict the interfaces of objects and components, where transitions involve the messages sent and methods invoked. There is a branch of usage-based test at this component level that makes use of things like Unified Modeling Language (UML) state diagrams to build usage-based views. As a simple introduction, it is best to follow the higher-level view. Once understood, many of the same notions apply in the finer granularity views.

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Guides
Figure 1: Usage Model Level of Granularity

2. Identify the states and transitions that describe behavior of interest. This is not always as easy as it sounds – but it can actually be an added value part of this approach. The process of thinking through “what are the states and transitions?” may help designers, developers and test people uncover things they were not mutually clear about and to reach a better shared understanding of the system they are working on together. Doing this before design and coding are done is most beneficial, as that shared understanding can prevent defects from being inserted in the first place – the best impact of testing one could hope for.

Figure 1A is a simple view of a high-level states and transitions map. Each state is in a bubble and each transition shown with a directed arc indicating the change from the one state to the other. Note that a state may loop back on itself (e.g., on the home page and clicking home page).

3. Estimate transition probabilities or long-range likelihood. Figure 2 illustrates a simple case with probability (the formal Markov terminology) or long-range frequency (the equivalent-enough practical meaning) labeled on each arc to show how often that transition would be expected to happen. Transitions can be thought of as one of two ways:

◉ Event-triggered: A mouse click or keyboard input, for example. The frequency depicts what proportion of the events will trigger this transition?

◉ Time-slice-triggered: Where the frequency depicts in the next time-slice (e.g., 10 seconds, 1 minute) with what frequency will one expect to find the system in which related state?

In this case, the article will proceed with an event-driven view.

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Guides
Figure 2: States, Transitions and Probabilities (Long-range Frequencies)

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Guides
Figure 3: A Completed States and Transitions Diagram

4. Use the Model to Inform Test Case Sampling Plans. Once the states and transitions model is built it can be used in a few ways.

Review of Stationary Distribution


An interesting property of Markov Chains is the review of stationary distribution. In simple terms, this means: “What is the long-range frequency with which we’d expect to see each of the states happening?”

Figure 4A shows a simple Markov Chain depicted as a matrix. Using that form, the statuary distribution can be directly computed (using some matrix algebra). Figure 4B shows the stationary distribution for the simple states and transitions diagram. The interpretation of that is the system will spend about 59 percent of its time in State 2. That might be a first indication of how to allocate some test time and resource. (Obviously, this is more useful in a more complex case than this introductory example.)

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Guides
Figure 4: Matrix View of States and Transitions/Can Yield Stationary Distribution

Test Case Sequences


While the stationary distribution gives some general guidance, more concrete test planning help can come from the extraction of test case sequences from the usage model. In simple terms that involve:

◉ Identifying a starting state (often a home page or startup screen for usage models at this high level).

◉ Using the transition probabilities to answer the question: “Which transition would we want to test next?” That usually means following untested transitions with high probabilities of being invoked. But in some test regimes, there may be reliability or cost information that is used in concert with the transition probabilities to guide planning for the next test case.

The table to the right illustrates the first few test cases for this simple example. Note that the first case follows path with highest probabilities, then the next case follows untested paths with the next highest probabilities, etc.

Test Cases

Test No. Usage Sequence 
1 1-2-3-Exit 
2  1-3-2-Exit 
3...  Etc… 

5. Assess test results.

What Lean Six Sigma Brings to the Equation


Like a lot of things in the Lean Six Sigma world, the science of usage-based testing originated and evolves outside of Six Sigma – but the practitioner’s toolkit, and potentially that science, can be advanced by bringing the practice onto the Six Sigma radar. Black Belts and project team members can bring their Six Sigma skills to bear in a number of ways that could strengthen usage-based testing, while deriving some benefits as they tailor it to their software test process:

◉ Understanding of the statistics and heuristics involved in Markov Chains and computational intelligence search and sampling methods. Black Belts benefit by understanding stochastic models, and Markov Chains may show up in projects as diverse as software test and Lean systems operations.

◉ Providing guidance in measurement system and sample size. When it comes to the sampling questions about how many test cases to run, and how to measure performance for particular test cases, Black Belts may be quite helpful.

◉ Assessing results. Here is another chance to separate signal from noise using good Six Sigma principles. In some cases, the model may assess costs and reliability-modeled performance in certain states. The Six Sigma infrastructure can help a test organization get a handle on the right mathematical and logical ways to assess raw test results.

◉ Reporting of results in convincing technical and business terms. As it works out in many other aspects of Six Sigma work, sometimes a critical link in the chain of planning and learning that accompany an analysis is the way the implications to the business and technology are understood and reported. Black Belts can help this testing science be better understood by the business and technologists outside of the test talk arena.

Saturday, 2 January 2021

The Many Sides of a Gemba Walk

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Prep

With so many tools available to a continuous improvement professional, it is easy to get overwhelmed and consequently focus on a narrow grouping of tools. Experience expands the practitioner’s toolbox, but sometimes it is just as important to return to the foundations to further the path to mastery.

What Is a Gemba Walk?

A gemba (and sometimes genba) walk is the term used to describe personal observation of work – where the work is happening. The original Japanese term comes from gembutsu, which means “real thing.” It also sometimes refers to the “real place.” This concept stresses:

◉ Observation: In-person observation, the core principle of the tool

◉ Value-add location: Observing where the work is being done (as opposed to discussing a warehouse problem in a conference room)

◉ Teaming: Interacting with the people and process in a spirit of Kaizen (“change for the better”)

This last point is sometimes a bit misunderstood. In the United States, Kaizen and Kaizen events are usually thought of as a one-week push for a change, usually a step change in performance. Gemba walks can help achieve a step change but can also be used for frequent, incremental improvements – which was the original concept of Kaizen.

What Is a Gemba Walk Not?

A gemba walk is not an opportunity to find fault in others while they are being observed. It is also not a time to enforce policy adherence (except possibly for safety problems or gross violations). If a gemba walk is used punitively, employees will shut down and resistance to change will rise rapidly. A gemba walk needs to be approached from a place of mutual respect and interest in making things faster, safer, easier and just plain better.

A gemba walk is also not the time to solve problems and make changes. This is a time of observation, input and reflection. That does not mean it is the time to ignore operator ideas for improvements or stifle brainstorming, but rather to be open and observe the “real thing” – see what is really happening. If ideas or complaints arise, note them and make sure they are followed up on after the walk. Be mindful not to focus on the details too quickly without seeing the whole.

Solving Problems on the Shop Floor

A sensei routinely encourages their students to get out of the habit of conference room analysis and design, and go to the shop floor to work directly with the operators. With this approach, the need to work through problems or to understand issues at a distance diminishes. The focus shifts from problem solving after the fact, to solving problems live, and eventually to coaching operators directly on how they can solve problems themselves – without the use of a week-long Kaizen event.

The more observation and problem solving that happen with operators on a gemba walk, the more successful and enduring the changes will be. There is no rule that says a practitioner cannot take a gemba walk at any point in a process change. In fact, reviewing ideas, piloting changes and tweaking implementation issues are all great uses of the gemba walk. This is similar to the management by walking around (MBWA) strategy coined by Hewlett Packard. As a practitioner’s confidence builds in solving problems with many tools, the more problems you will solve directly on the shop floor and then be able to coach others to recognize their abilities within themselves to solve the challenges they face.

Gemba Walk Compared to Other Data Collection

A frequent objection to a gemba walk is that it cannot be as accurate as an established data acquisition system using statistical process control (SPC) to monitor and improve processes. This argument against a gemba walk is likely to come when trying to solve problems in a strict methodology, more often with individuals who are newer to continuous improvement. But there does not need to be conflict in using all available data.

The key difference between gemba walks and, say, run chart data, is that there are no restrictions or filters on the input data. The only restrictions or filters are a practitioner’s mental models (e.g., preconceived notions) that can cause observational biases based on assumptions gathered from past experience. Mental models can both help and hinder process observation.

Let’s explore this a bit further. In the case of run chart data, the interaction of two parameters is seen with snapshots over time. A run chart displays a lot of information: how any time period compares to any other time period, historical averages, and prescribed or derived control limits. Hidden in there, however, is a big assumption – that what is being measured is the key variable influencing the output of interest. Said in the more traditional fashion, the assumption is that the run chart measures the vital X driving the big Y.

The social momentum created from a run chart is a blessing and a curse. The blessing, shown in the figure below, is that it helps maintain the status quo as far as this X and Y relationship goes. A run chart also leads to the psychological effects of authority and consistency; these two social norms are powerful in regard to directing human behavior to rally around a common, central tendency. Because the patterns shown in a run chart are compelling, it can leave practitioners open to false security and, at times, incorrect decisions. What if the whole problem is wrong? What if the process dependency of the big Y on vital X changed such that X is no longer vital or is, at the least, diminished? What if Y is no longer relevant?

Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Exam Prep, Six Sigma Prep
Example of Control Chart with Control Limits

In contrast to the streamlined information from a run chart, which provides process feedback at a glance, observing a process opens an individual up to a flood of visual data. The amount of data the human eye takes in is estimated at approximately that of an Ethernet connection, or from 10 million to 100 million bits of data per second. That flood of data from observation can be especially overwhelming when encountering a process unfamiliar to you. This is where mental models  make life easier, in a sense, because they filter the incoming data, synthesize it into accessible bits of information and deliver conclusions. Although this constantly happens without any effort – and dramatically speeds an individual’s ability to react to situations – it is not helpful on a gemba walk.

Consider supervisors providing work direction to the floor personnel; an individual’s eye tends to look at how well supervisory instruction is executed. The mental model is narrowed to how well people follow orders. The supervisory instructions, however, may be inadequate. By relaxing the mental model that restricted perceptions to only one area to illuminate problems, it is possible to be more open to finding solutions. Although this can require only a subtle shift in awareness and perception, the observed waste and subsequent conclusions may be completely different.

Being aware of mental models  is the first step in allowing more data to stream into conscious observations of processes. This is one reason an outsider is a valuable team member – they tend to have fewer preconceived ideas about how the current process or system works  and can facilitate team learning. With experience and presence of mind, anyone’s observation skills can improve. Those improved skills help an individual to ask better questions and to focus on mentoring operators in solving their own problems.

Friday, 1 January 2021

Managing the Executives for Lean Six Sigma Success

Six Sigma Tutorial and Material, Six Sigma Certification, Six Sigma Career, Six Sigma Exam Prep, Six Sigma Guides

Being at the focal point in the cultural migration of executing change using Lean Six Sigma, deployment leaders/deployment Champions have many obstacles and opportunities to deal with. Strange as it might seem, the people who may be pushing the hardest for the results inherent in Lean Six Sigma deployments are the same ones who can wind up becoming the biggest obstacle to success – executive managers in a company. They are the ones who define the end game, but rarely are able to define the detailed steps to get there. Or, at minimum, they think they understand what it takes, but do not have the time or the inclination to understand Lean Six Sigma enough to know how to support it and how they will actually need to change habits for it to be successful.

Deployment leaders, who are responsible for the day-to-day management of Lean Six Sigma throughout the entire organization, report directly to a senior executive, maybe even the CEO. At a minimum, they report to the director of quality, or an executive steering committee. They can be between a rock and a hard place – between the politics of the organization and the projects required to make the dramatic process improvement only Lean Six Sigma can deliver. And, politics and projects just do not always mix.

In theory, deployment leaders use data to choose projects and create an objective decision-making process in a world in which executives generally have been rewarded for putting out fires rather than systematically improving processes.

An executive with a little knowledge of Lean Six Sigma can be more dangerous than an executive who admits knowing nothing about the methodology. A deployment leader may hear, “Hey, I want my project done using Lean Six Sigma; let’s skip the calculator thing.” Or, “Why waste time building an infrastructure and collecting data. Let’s just do one of those Kaizen things. It’s faster.” If an executive sponsor is not managed properly, he or she – without knowing it – can destroy many weeks of good work at the very first tollgate meeting. Another example is when a key Black Belt project is torpedoed after many weeks of collecting statistically sound voice of the customer data. The executive sponsor can kill the initiative with these simple words, “I know the customer better than the data does…and that’s not what the customer is telling us!”

Of course, these examples may fall on the far side of the spectrum; but nevertheless, if executive sponsors are not managed properly during the roll-out of a new Lean Six Sigma program, the results can be most difficult to overcome. On the other hand, well-managed, properly educated and enthusiastic sponsors are a key to Six Sigma success. So how do deployment leaders make the executive sponsors catalysts of success and not impediments to it. Here are a few steps to consider:

Provide Executive Sponsors with Reading Materials on Lean Six Sigma


Giving executive sponsors a 300-page book on all the statistics and tools involved in the DMAIC toolkit is probably not a good idea. But, there are several good books that are geared specifically to the executive sponsor which can be read in a couple of hours. These books go over the high-level aspects of DMAIC, Lean and Six Sigma and the role of the executive sponsor.

Survey Executives on Their Basic Knowledge of Lean and Six Sigma


A simple survey to give to executive sponsors to ascertain the level of their Six Sigma knowledge can be put together quickly, and the information collected can be invaluable. Ultimately, it is critical that deployment leaders are aware of each executive sponsor’s understanding of Lean Six Sigma. Here are 10 multiple-choice questions designed to use for surveying executive sponsors:

1. What is Six Sigma?

a. a technique to develop business strategy
b. a management style
c. a process improvement methodology

2. What does sigma stand for?

a. speed
b. variety
c. variation

3. Six Sigma originally addressed which business environment?

a. management
b. product development
c. finance
d. sales and marketing
e. production

4. What is the difference between Six Sigma and Lean Six Sigma?

a. Lean Six Sigma is less complicated/rigorous version of Six Sigma
b. Lean Six Sigma means fewer people involved in the program
c. Lean Six Sigma focuses on customer requirements and removes process waste

6. What is the primary focus of Lean Six Sigma?

a. profit improvement by improving quality
b. profit improvement by improving process speed
c. profit improvement by improving quality and process speed

7. What do Six Sigma terms like Black Belt and Green Belt describe?

a. a Six Sigma area of specialization by a consultant
b. the management level that must be involved in a project
c. roles within a Six Sigma deployment

8. Is Six Sigma Total Quality Management (TQM) under a different name?

a. yes, it is an early version of Six Sigma
b. no, it is not the same as TQM
c. it depends on what country you are in

9. What is a Kaizen event?

a. an activity that causes an incidental problem
b. an activity that causes a recurrent problem
c. an activity that enables continuous improvement

10. What does the acronym DMAIC stand for?

a. Diagnose Manage Authorize Isolate Consolidate
b. Digitize Manage Apply Inform Consolidate
c. Define Measure Analyze Improve Control

Know Executives and Their Business Via Informal Interview


The way to get executive sponsors most engaged is to demonstrate knowledge of Lean Six Sigma and of the executive sponsors’ business and personal history. Read any available information on executive sponsors such as company biographies. Understand the performance goals of the sponsors to get them on board. Do this in preparation for an informal interview that may include the following kinds of questions:

◉ How many services does your business unit offer?
◉ Who is your customer?
◉ Have you participated in a quality program in the past?
◉ What is your business model and customer strategy?
◉ Do you do customer surveys?
◉ Do you use service level agreements?
◉ What are the key measurements of success for your business unit?
◉ Why do you think Lean Six Sigma works for you? Why not?

Get Executive Sponsors to Understand Their Roles in Lean Six Sigma


It is critical that executive sponsors understand their role in a Lean Six Sigma deployment. They are responsible for creating the vision for the Lean Six Sigma initiative – a vision that is maintained within the context of establishing business targets and strategic goals and measures. Ultimately they create the environment within the organization that promotes the use of Lean Six Sigma tools and methods. One of the best ways to do this is to have executive sponsors participate in a one- or two-day workshop to introduce them, as a team, to more detail about Six Sigma and their roles. An effective workshop might include a high-level overview of DMAIC, Lean and Six Sigma followed by facilitated discussions around deliverables and concerns idiosyncratic to the company’s culture. Many workshops also include interactive simulations that expose executives to Lean Six Sigma concepts in a realistic fashion.

Create a Communication Plan and Leverage Executives’ Strengths


Developing a holistic communication plan around Six Sigma is critical to the overall success of any deployment. Specifically, design a plan that leverages the executive sponsors so they are key elements of the communications. Design a one-minute description of what Lean Six Sigma means to the company – what some call an “elevator speech” – and provide it to the executives. This description can be used by executives when an associate or executive from another company asks them about Six Sigma. Executives also could be asked to talk about the deployment at key employee awareness meetings.

Document the Commitment and Understanding of Executive Sponsors


In the long run, a key to the success of a deployment leader is dependent on “real” sponsorship by executives and not just “perceptual” sponsorship. This means that the executive sponsors are really on board and supportive and not just saying the right things and going through the motions. Plot each executive on a commitment curve which graphically represents his or her knowledge and commitment. Understanding “hot buttons” and the true feelings of the executive sponsors about the program is critical to successfully dealing with each sponsor as an individual contributor or an impediment.

Six Sigma Tutorial and Material, Six Sigma Certification, Six Sigma Career, Six Sigma Exam Prep, Six Sigma Guides
In the end, the successful deployment is the one in which executive sponsors play their role with knowledge and passion. While politics always play some part in any deployment, negatives can be mitigated and the positives maximized. Deployment leaders must not only manage Green Belts, Black Belts and projects, they have to manage the executives – while allowing the executives to think that they are the ones doing the managing.