Friday, 20 August 2021

Best Tools and Techniques for Six Sigma

Six Sigma, Six Sigma Exam Prep, Six Sigma Tutorial and Material, Six Sigma Preparation, Six Sigma Career, Six Sigma Study Materials

Six Sigma is a business theory focused on improving the quality of goods or services an organization produces by reducing differences in the production cycle. Six Sigma managers realize that when a production process comes up short on the strength to make high quality reliably, it will keep delivering damaged products until somebody intercedes and improves the process. Decreasing variation requires steady measurement and estimation as frameworks will in general disintegrate if not held under tight restraints. Throughout the long term, Six Sigma professionals have built up a lot of tools and techniques that address control, and critical thinking and improvement to dispense with imperfections and waste. Here is a couple of the most fundamental. 

Best Tools and Techniques for Six Sigma

1. Standard Work 

Standard work is the documentation of the accepted procedures for any process or undertaking at that given second. It is made and refreshed by the people who accomplish the work. It shapes the benchmark for development and assures measure consistency. 

2. 5S Workplace Organization 

An organized and well-stocked working environment fundamental in the mission to eliminate variety. The procedure includes completing 5 things that all beginning with S in both English and Japanese. They comprise of seiri (sort), seiton (set), seiso (Shine), seiketsu (standardize), and shitsuke (Sustain). 

3. Control Charts 

A process control outline is a chart used to chase how a process carries on overtime. Data points are plotted in a chart with an upper line for the normal (once in a while a middle), an upper line for the upper control limit, and a lower line for the lower control limit. Process control diagrams assist leaders with abstaining from freezing over each up and downswing. They avoid issues made about by just seeing normal outcomes, rather than the varieties of results. 

4. Gemba Walks 

The Japanese word "Gemba" signifies the real place. During a Gemba walk, the manager goes to where work is done regarded for the employees, asks inquiries, and conceivably identify open doors for development.

5. Hoshin Kanri 

Hoshin Kanri (in any case called, Policy Deployment) is a key strategic planning to adjust the organization and guarantee that everybody is progressing in the same objectives. The methodology adjusts the need to accomplish day by day gradual improvement while advancing toward the organization's three to five-year advancement targets simultaneously. 

6. Kanban 

Kanban is a visualizing standard dependent on expanding the progression of goods and work without extra stock or transportation. While at first utilized with physical cards at Toyota, Kanban has now moved to the cloud, and numerous organizations utilize advanced Kanban sheets to follow the progression of work. 

7. Problem Solving and Improvement 

Despite amazing control, now and then issues will occur, or open doors for development will be recognized. All things considered, at least one of the accompanying Six Sigma instruments can be conveyed. 

8. A3 Problem Solving 

A3 is an organized critical thinking approach that gets its name from the size of paper that was utilized before digital tools opened up. An A3 report is the consequence of an improvement cycle like DAMIC or PDSA. 

9. Catchball 

The Six Sigma process of Catchball includes passing ideas starting with one person to others for input and action. The idea (ball) is gotten underway whenever somebody characterizes a test or opportunity. 

10. DMAIC 

DMAIC is a five-stage improvement cycle; define measure, analyze, improve, control. It carries structure to the improvement process and ensures that each change depends on cautious investigation and valuable data. It begins with the Standard Work and repeats whenever a new opportunity exists. 

11. PDSA 

PDSA is an optional improvement cycle that represents Plan, Do, Study, Act. It is an easy version of DMAIC that works best for improvement projects that are not heavy on statistics.

12. The 5 Whys 

The 5 Whys is a well straightforward strategy for getting to the root of the cause. By asking, "why?" the basis of an issue can usually be found in five iterations.

Six Sigma, Six Sigma Exam Prep, Six Sigma Tutorial and Material, Six Sigma Preparation, Six Sigma Career, Six Sigma Study Materials

13. Value Stream Mapping (VSM) 

Value Stream Mapping is a Six Sigma apparatus for characterizing and surveying the development of raw materials and work from the earliest starting point of the process to conveyance to the client. It is how the present status of a process is archived, and the reason for figuring out where waste can be dispensed with or esteem included. 

This outline doesn't cover each Six Sigma instrument, yet these are the necessities of the tool kit. You may find that you utilize every one of them, or just a couple, however some the combination will probably assist you with accomplishing less variation, and the ability to respond when challenges emerge.

Source: novelvista.com

Thursday, 19 August 2021

Benefits of PMP Certification

PMP Certification, PMP Exam Prep, PMP Learning, PMP Tutorial and Material, PMP Career, PMP

The benefits of PMP certification are immense. You will realize them once you become a PMP.    

I often receive emails from readers who want to know if applying for the PMP certification is worth it. They want to understand the advantages of the PMP certification and if it is a good investment of time and money.

They compare the PMP certification with others, such as PRINCE2, hoping to find the quickest and most cost-effective route to their career goals 

So, to layout the comparative benefits, I am writing this blog post. I hope this will give you a better understanding of the benefits of the PMP certification.

Let’s get started.

Benefits of PMP Certification

Before discussing the benefits of PMP certification, let’s discuss the PMP certification and how to achieve it. Afterward, we will look at the PMP benefits.

What is the PMP Certification?

PMP stands for Project Management Professional. This is a credential offered by PMI (USA), to professionals working in project management.

The PMP is the most popular certification for project professionals with global recognition.

You can apply to become a PMP no matter what industry you’re in.

The PMP Certification Process

Becoming a PMP is a straightforward but somewhat lengthy process. If you are eligible for the PMP exam and attend a 35 contact hours PMP training program, then you can apply.

Once you pass this exam, you are a certified PMP.

This is a difficult exam if you do not prepare well. You must commit time to study and understand the exam concepts and practice questions.

The PMP exam has 180 questions, and you have 230 minutes to take it. As soon as you submit the answers, you will know your result. The exam is closed book, meaning you cannot use any reference book, so adequate preparation and study are vital.

PMI designed the PMP certification process to familiarize you with the best industry practices.

This certification is respected among your peers. It also boosts your self-confidence and fills your knowledge gaps.

To date, there are more than half a million professionals who have earned this prestigious certification, and many more are in the process.

Next, let’s look at seven reasons why the PMP certification is worth it.

PMP Benefit I: You Will Learn Many New Skills

This is the most important benefit of PMP certification.

The PMP certification is designed to make you a better project manager. The certification process provides you with the required knowledge to complete projects with minimal obstruction and optimal success.

Passing the PMP exam is not an easy task. You must have project management experience and a bachelor’s degree or diploma. You also have to attend a 35 contact hours PMP training program. You can apply only if you fulfill these conditions.

While challenging, once you have gone through this rigorous process, studied, and passed the exam, you will have learned new tools and techniques to help further your career.

PMP Benefit II: You Will Stand Out from the Crowd

Getting a call back for a job interview is difficult, and human resource departments constantly have new resumes coming in. The job market is tough, and many candidates are fighting for a single position.

Having the PMP certification gives you a competitive edge. It shows that you have mastered the knowledge that others may not have.

If you go through any popular job portal and search for “Project Manager” or “Project Engineer,” you will notice that many postings require you to be a PMP. Many others highly recommend this certification.

In short, the PMP certification helps you get a good job.

I often receive emails from professionals who are jobless and applying for the PMP exam. They wonder if they will immediately land a job after getting the PMP certification. Please note that getting the PMP certification does not guarantee you a job, but it certainly helps.

PMP Benefit III: Your Knowledge Gaps Will be Filled

This is again a great benefit of the PMP certification. I felt it myself.

Your knowledge may have some gaps. Partially remembered techniques often cannot be recalled or applied with confidence.

You may even find yourself clueless about what your next step should be. No professional wants to be in that situation.

This won’t happen once you have passed the PMP exam because you will have gone through a process developed by industry experts. Your knowledge is aligned with standard international practices, and you won’t have gaps.

The PMP certification provides the best industry-standard know-how to manage the project. You know your next step. This lifts you above a non-credential holder.

PMP Benefit IV: You May Get a Pay Raise

Some surveys say that PMPs have higher salaries than non-PMPs with similar qualifications and experience. The difference is around 10% to 20%, a significant and desirable increase.

Please note that having the PMP certification does not guarantee a pay raise, but it gives you a competitive advantage. 

PMP Benefit V: It Establishes Your Credibility

PMP Certification, PMP Exam Prep, PMP Learning, PMP Tutorial and Material, PMP Career, PMP
You are PMP; this establishes that you have demonstrated your competency and skill. It shows you can work within guidelines to lead and direct a project to completion.

Your peers will respect you, and your opinion will have greater weight.

PMP Benefit VI: Global Recognition

These days, international certification is necessary for working in a multinational company. Complex projects may require you to work in a variety of places and even countries. Therefore, you should know the best global practices.

The PMP is an internationally recognized certification. Many large organizations have endorsed this certification throughout the world. No one will question your skills, and clients will trust in your ability to lead large projects.

PMP Benefit VII: Professional and Social Behavior

This final benefit is the gold-standard advantage.

PMP certification holders abide by an industry-accepted code of ethics and show their ability to conduct themselves professionally. Employers appreciate that you will not get involved in anything unethical. You will be known to work with integrity.

The PMP certification is a sign of your professional behavior and helps build your reputation as a capable and honest manager.

Is the PMP Certification Worth it?

To put it simply, yes.

Attaining the PMP certification is a costly process that requires a lot of effort and time.

Training, reference materials, and practice questions are time-taking processes.

The cost of the PMP exam is 555 USD, and the cost of the training, study materials, and simulators are separate. It is not a cheap process.

However, the benefits make this certification well worthwhile.

Do not attempt this exam if you are not serious and dedicated to learning new skills and filling your knowledge gaps.

Source: pmstudycircle.com

Wednesday, 18 August 2021

What to Focus on When Picking Six Sigma Software

Six Sigma Software, Six Sigma Exam Prep, Six Sigma Tutorial and Materials, Six Sigma Exam Preparation, Six Sigma Preparation, Six Sigma Guides, Six Sigma Career

Putting resources into the software to help your Six Sigma activities is a successful method to ensure that you capitalize on the approach. Setting up a structure for development makes it more straightforward for individuals all through the association to take an interest in, and viably manage ceaseless improvement endeavors. 

Read More: Certified Manager of Quality/Organizational Excellence (CMQ/OE)


Associations that influence Six Sigma software gather more open doors for development, actualize more arrangements, and see a higher ROI for Six Sigma. There are various arrangements available that were either evolved as Six Sigma the board instruments or repurposed accordingly, so we figured it may be useful to recognize the absolute most significant abilities that you should search for while assessing this sort of innovation.

So, How to pick the right Six Sigma Software:


Capture Opportunities for Improvement


Any arrangement you consider should make it simple for each individual in the association to recognize and record open doors for development. This is vital to the Six Sigma approach and ought to be at the core of the arrangement you pick. 

Cloud-based software that is accessible 24 x 7 and on any gadget is the most legitimate arrangement choice. It will make it feasible for individuals to report what they discover from any place they happen to be and for chiefs to react to circumstances regardless of whether they don't occur to be in the workplace. 

The arrangement ought to permit clients to include any records or pictures that may be pertinent to the open door for development and it ought to make a review trail that will store the subtleties of what befalls every open door after some time.

Six Sigma Software, Six Sigma Exam Prep, Six Sigma Tutorial and Materials, Six Sigma Exam Preparation, Six Sigma Preparation, Six Sigma Guides, Six Sigma Career

Accelerate Improvement Workflow


When an open door for development is caught in the framework, there ought to be a characterized work process for what occurs straightaway. Who will assess and organize the chance? By what method will the individual who announced the open door realize what's going on with it? 

The best Six Sigma arrangements have savvy cautions and warnings with the goal that the individuals who will survey and support openings are advised promptly when another one is entered. They would then be able to appoint related assignments to the correct individuals and groups. 

When deal with an undertaking begins, extra cautions advise fitting faculty when assignments are finished, or due dates are missed. This quickens the movement of progress.

Six Sigma Software, Six Sigma Exam Prep, Six Sigma Tutorial and Materials, Six Sigma Exam Preparation, Six Sigma Preparation, Six Sigma Guides, Six Sigma Career

Measure Impact


Six Sigma brings a proof-based, logical way to deal with business management. Each cycle is just changed after a furrowed assessment and pre-characterized improvement cycle like PSDA or DMAIC. It just bodes well, in this way, to carry that equivalent accuracy to estimating the effect of the progressions that are actualized. 

Your Six Sigma software arrangement should assist you with detailing the effect of your improvement work regarding cost decrease, expanded income, improved consumer loyalty, diminished process duration, or whatever other measurements that are imperative to your business. This will help legitimize the interest in Six Sigma programs, keep representatives spurred, and drive chief commitment.

Six Sigma Software, Six Sigma Exam Prep, Six Sigma Tutorial and Materials, Six Sigma Exam Preparation, Six Sigma Preparation, Six Sigma Guides, Six Sigma Career

Visual Management


Numerous Six Sigma strategies include representation. Value stream planning, Kanban, A3, Kaizen sheets, and others all assistance individuals in a flash comprehend complex data in a moment. Search for Six Sigma software that takes visual management to the following level, enabling clients to set up dashboards and reports that rapidly mention to them what they have to know. 

Heads ought to have the option to effectively survey the strength of Six Sigma in the association. Project Managers should see the progression of work and perceive detours right away.

Six Sigma Software, Six Sigma Exam Prep, Six Sigma Tutorial and Materials, Six Sigma Exam Preparation, Six Sigma Preparation, Six Sigma Guides, Six Sigma Career

Improvement Broadcasting


Six Sigma requires a collaboration. The methodology takes care of most when it turns out to be important for the way of life and goes past a specific device or strategy to supply each representative with a solid sense that they are crucial to the achievement of the association and the steady improvement is a key duty of each and every person. Six Sigma software arrangements with worked in progress broadcasting capacities help strengthen the significance of Kaizen. This kind of acknowledgment is additionally intensely propelling and something that representatives reliably tell specialists they need more from businesses. 

Six Sigma can significantly change an association to improve things, however, it doesn't generally do as such. Achievement needs chief help, interest in important instruments and assets, and an ability to grasp steady change. Six Sigma software doesn't ensure results, however, it puts the association on the correct balance to quicken improvement, settle on shrewd choices, and gain from past understanding. Choosing one with solid abilities in every one of these territories will help guarantee that you get an answer and an accomplice that can smooth your way toward better business brings about terms of the measurements you care about most.

Source: novelvista.com

Monday, 16 August 2021

PMI Certifications: How Many Certification Courses Does the PMI Offer?

PMI, PMI Exam Prep, PMI Study Material, PMI Career, PMI Tutorial and Material, PMI Preparation, PMI Certification, PMI Guides, PMI Learning, PMI, capm, CAPM Certifications, PMP, PMP Certification, PMP Exam, PMP Prep, PMI PBA, PgMP Certification, PfMP Certification, PMI-ACP, PMI-ACP Certification, PMI-SP, PMI-RMP, PMI-RMP certification

Today we will talk about PMI certifications.

When I passed my PMP exam in 2010, PMI offered only a few other certifications: PMI-RMP, PMI-SP, and PgMP.

These days, that number has grown dramatically. The PMI offers seven certifications in addition to the PMP certification, and a few more are under the process of launching.

If you have passed the PMP exam, you might be thinking about expanding your skills and wondering what other certifications have to offer.

To give you an idea about these other opportunities, this blog post will cover additional PMI certifications found here.

PMI Certifications

PMI, PMI Exam Prep, PMI Study Material, PMI Career, PMI Tutorial and Material, PMI Preparation, PMI Certification, PMI Guides, PMI Learning, PMI, capm, CAPM Certifications, PMP, PMP Certification, PMP Exam, PMP Prep, PMI PBA, PgMP Certification, PfMP Certification, PMI-ACP, PMI-ACP Certification, PMI-SP, PMI-RMP, PMI-RMP certification
PMI offers eight certification courses:

1. CAPM

2. PMP

3. PgMP

4. PfMP

5. PMI-ACP

6. PMI-PBA

7. PMI-RMP

8. PMI-SP

Besides these certifications, PMI is launching new Agile certifications; you can find more details by clicking here.

CAPM (Certified Associate of Project Management)

This PMI certification is for entry-level professionals. It has lenient eligibility requirements, and you can apply for it even if you don’t have project management experience.

The CAPM certification is valid for three years and requires 15 PDUs to renew it for a further three years.

PMP (Project Management Professional)

This is the most sought-after certification for project professionals. If you are in project management, you should definitely go for this certification. This credential will help you take your career to the next level and requires the following prerequisites:

If you have a secondary degree (high school diploma, associate degree, or the global equivalent), a minimum of five years or 60 months of unique non-overlapping professional project management experience is required.

If you have a four-year degree or equivalent, a minimum of three years or 36 months of unique non-overlapping professional project management experience is required.

If you have a bachelor’s or post-graduate degree from a GAC-accredited program or global equivalent, you should have a minimum of two years or 24 months of unique non-overlapping professional project management experience.

This certification is valid for three years. You can renew it by earning 60 PDUs in three years and notifying the PMI. This is known as the Continuing Certification Requirements (CCR) cycle.

PgMP (Program Management Professional)

You can apply for this certification if you are managing similar projects.

To apply for this certification, you should have a diploma or a bachelor’s degree. Diploma holders need 6,000 hours of project management experience and 10,500 hours of program management experience.

If you have a 4-year degree, you will need 6,000 hours of project management experience and 6,000 hours of experience in program management.

This certification is valid for three years. You can renew it for another three years after completing the CCR program.

PfMP (Portfolio Management Professional)

You should go for this certification if you are managing diverse projects or programs.

To apply for this certification, you should either hold a diploma or a bachelor’s degree.

The portfolio management experience requirement for diploma holders is 10,500 hours and 96 months of professional business experience.

If you have a 4-year degree, you will need 6,000 hours of portfolio management experience and have 96 months of professional business experience.

If you have a 4-year degree, you will need 6,000 hours of project management experience and 6,000 hours of experience in program management.

This certification is valid for three years. You can renew it for another three years after completing the CCR program.

PMI-ACP (PMI–Agile Certified Practitioner)

This certification is for Agile professionals and is the second most popular PMI certification after the PMP.

To apply, you should hold a secondary degree and have 1,500 Agile project management experience hours. Additionally, you should have 2,000 hours of experience in project management. 

This certification is valid for three years. You must earn 30 PDUs in Agile practice to renew for a further three years.

PMI-PBA (PMI Professional in Business Analysis)

This certification is for business analysts.

If you have a secondary degree, you should have 7,500 hours of experience in business analysis. For a bachelor’s degree holder, the requirement is 4,500 hours.

The necessary project management experience is 2,000 hours, and you also have to attend a 35 contact hours training program in business analysis.

This certificate is valid for three years. You can renew it for a further three years after earning 60 PDUs in business analysis topics.

PMI-RMP (PMI Risk Management Professional)

You should go for this certification if you want to take your career to the next level in risk management.

Diploma or degree holders can apply for this certification. If you have a diploma, you should have 4,500 hours of experience in risk management. If you are a degree holder, the requirement is 3,500 hours. 

The training program is 40 hours long for diploma holders and only 30 hours for those with 4-year degrees.

This certification is valid for three years. You can renew it for a further three after completing the CCR program, which includes earning 30 PDUs in risk management.

PMI-SP (PMI Scheduling Professional)

This certification is for professionals working in project planning and scheduling.

You will need a diploma with 5,000 hours of experience in project scheduling. Afterward, you must attend 40 contact hours of training in scheduling management. Then you will be eligible for this certification.

If you have a 4-year degree, you should have 3,500 hours of experience in project scheduling. Then you should attend a 30 contact hours training program in scheduling management.

This certificate is valid for three years. To renew it for another three, you will have to earn 30 PDUs in scheduling management.

Source: pmstudycircle.com

Friday, 13 August 2021

8 Types of Organizational Structure

PMBOK Guide, PMP Exam Prep, PMP Tutorial and Material, PMP Certification, PMP Guides, PMP Learning, PMP Career

Today, we will discuss the types of organizational structures.

Every company has an organizational structure built around its goals and business objectives. If the work is short-term, the structure should allow for temporary hires and seasonal employment.

However, if the company relies mainly on repeat business and regular tasks, the structure should support activities that help maintain its operation.

Read More: PMI Certifications

Organizational structure is a system that determines employee hierarchy, functions, and workflow, and also provides a transparent and fair reporting system. It is an enterprise environmental factor guiding how an organization runs its operations.

As organizations grow, their requirements change, and the structure must adapt to support its objectives.

Now you might wonder about the relative significance of the organizational structure, the invisible yet vital scaffolding supporting business activity. 

The market is competitive; therefore, organizations must rapidly adapt to market demand and be responsive to shifting business objectives.

Companies with poor organizational structures will not survive.

A well-defined organizational structure helps businesses realize their potential and support their objectives.

For example:

Let us say your company is producing a good. Your customers are satisfied and not very demanding, so what kind of organizational structure would you select?

The functional organizational structure serves this company best because it supports production operations.

Let’s consider another case.

Suppose your organization has ten employees and deals with small projects. As soon as you complete a project, you start looking for the next one.

In this case, what kind of structure would you select?

You would opt for the projectized organizational structure since your company mainly works with temporary projects.

Now, the final case.

Your organization is enormous. The work environment is dynamic and diverse. Customer requirements and market demands frequently change.

What kind of structure would you select?

The functional structure won’t work because it does not allow for quick changes to its operations and isn’t as responsive to market nuance.

You also cannot select the projectized structure. Although it supports a dynamic nature, this isn’t adequate for a large organization. Your company is big, and you need permanent departments to keep your organization functioning smoothly. This is not possible with the classic projectized structure.

Hence, you will select a matrix organizational structure. It combines the qualities of both functional and projectized organizational structures and will support your operations and help achieve your business objectives.

Types of Organizational Structure

An organizational structure guides how activities in your company are carried out to achieve its goals. It determines how information flows within the organization and between departments. It defines the chain of command and job responsibilities.

The organizational structure depends on many factors, such as governing style, leadership style, workflow, hierarchy, and many more.

The PMBOK Guide defines eight types of organizational structures:

1. Organic or Simple Organization

2. Functional or Centralized Organization

3. Multi-divisional Organization

4. Matrix Organization

5. Project-oriented (Composite or Hybrid) Organization

6. Virtual Organization (Network Structure)

7. Hybrid Organization

8. PMO (Project Management Office)

Wikipedia lists six types of organizational structures:

1. Pre-bureaucratic Structure

2. Bureaucratic Structure

3. Post-bureaucratic Structure

4. Functional Structure

5. Divisional Structure

6 Matrix Structure

Some other sources divide them into the following categories:

◉ Simple Organization

◉ Functional Organization

◉ Divisional Organization

◉ Matrix Organization

◉ Team-based Organization

◉ Network-based Organization

◉ Modular Organization

On the Internet, you will find many different types of organizational structures. However, the classifications above are the most popular.

Since this blog follows PMI’s guidelines, we will focus on the PMBOK Guide’s classification and explain the other organizational structures briefly.

Organic or Simple Organizational Structure

Here, you work alone or side by side with another employee.

You may be the only employee in your company.

Instances of this type are a solopreneur, OPC (One Person Company), or a freelancer.

Functional (Centralized) Organizational Structure

Functional organizational structure is the most commonly used organizational structure. Here, the organization comprises various departments; each department has workers with similar skills: sales, marketing, finance, to name a few.

This helps organizations maximize the efficiency of each functional group.

Multi-Divisional Organizational Structure

Here, you may have many functional divisions with a little centralization. Generally, these divisions are independent. Although they will guide a part-time staff, project managers do not have much authority.

Under a multi-divisional structure, the organization is divided into various divisions. Employees with diverse skills are kept together in groups based on a similar product, service, or geographic location. Each division has the resources required to function and can work independently.

Matrix Organizational Structure

Matrix organizational structure is a hybrid of a functional and projectized organizational structure. Here you have two command structures: vertical and horizontal. An employee may belong to a functional group and work on a project, so this structure combines the best of both worlds.

A matrix organizational structure can be of three types:

1. Strong Matrix Structure

2. Balanced Matrix Structure

3. Weak Matrix Structure

Strong Matrix Structure

Strong matrix organizations are closer to a projectized organization. The project managers have the highest authority, control over the budget, and a full-time team reporting to them.

Balanced Matrix Structure

A balanced matrix has properties of both functional and projectized structures. Here, project managers have a low-to-moderate authority and a part-time team. Both the project manager and the functional manager manage the budget.

Weak Matrix Structure

A weak matrix is closer to a functional structure. With a weak matrix, project managers have low authority and no control over the budget; they will have a part-time team.

Project-Oriented (Composite or Hybrid) Organizational Structure

As its name suggests, projectized organization deals with projects. Project managers have a full-time role and comprehensive authority to complete the project successfully. They control the budget and have a full-time team report to them.

A team-based structure is another name for a projectized organizational structure.

Virtual Organization or Network Structure

Many experts call this a virtual corporation. The central organization is connected to outside firms via the internet. The outside firm can be a vendor, client, or associate. This structure helps businesses achieve corporate growth and a greater profit. In a network structure, the organization keeps its core business to itself while adjunct processes are outsourced. 

This structure is also known as a hollow corporation, hollow organization, or network structure.

In a virtual organization, the project manager has a low-to-moderate authority, mixed control over the budget, and they may or may not have a full-time team reporting them.

Hybrid Organizational Structure

True to its name, this structure may use any combination of the organizational structures.

Suppose yours is a functional organization whose typical needs are easily met by conventional departments In some cases, however, your organization will create a separate project team to complete unique tasks.

Hybrid Organization is a mixed structure that serves organizations with diverse needs. Responsibility, authority, and other factors are also mixed depending on the structure.

PMO (Project Management Office)

PMO is also a mixed organizational structure. Here, project managers have the highest authority. They control the budget and have a full team reporting to them.

This concludes the summary of organizational structures.

Next, we will discuss those organizational structures not mentioned in the PMBOK Guide. Note that I am describing these organizational structures for your information only. You will not see any questions in your PMP exam about these types of structures. 

The Simple Structure

This organizational structure is suitable for small organizations in their early stages. They have just started and are still in the development phase. In these companies, authority rests in a single person. These structures have few rules, and work is relatively straightforward.

Some scholars call this a pre-bureaucratic structure.

The Modular Structure

In this structure, the organization outsources some parts of a product.

Note that in the network structure the company outsources the processes, while in a modular structure outsources only a few parts of the product.

Pre-Bureaucratic Structure

Pre-bureaucratic organizations do not have standard procedures and policies. Small-scale and young companies use this structure. This organizational structure has a few employees who handle simple tasks. It has a central command with one decision-maker in the top position.

Communication takes place on a one-on-one basis, and it usually is informal.

Bureaucratic Structure

This organizational structure is suitable for huge organizations with complex operations that need smooth administration. They have standard procedures and processes.

An example of this organizational structure is the food and beverage industry, with strict rules and regulations that govern processes.

Post-Bureaucratic Structure

Post-bureaucratic organizations are quite developed and have complex standards and procedures. These organizations have a central command comprising several board members; decisions are made through a democratic process. 

PMBOK Guide, PMP Exam Prep, PMP Tutorial and Material, PMP Certification, PMP Guides, PMP Learning, PMP Career

This encourages employee participation, trust, responsibility, and respectful interpersonal relationships.

Key Elements of Organizational Structure

The followings are five key elements of an organizational structure:

1. Job Description

2. Division of Department

3. Chain of Command

4. Span of Control

5. Formalization

Job Description

A job description defines the task managed by each employee of the organization. 

It is the most important element of organizational structure as it distinguishes one role from another and separates and defines the responsibilities.

Division of Department

An organizational structure can have many departments, such as finance, human resources, and quality control.

Each department has a unique set of activities and a department head. Sometimes, departments are known as sections and led by the section head.

Chain of Command

This shows the line of command from top to bottom.

For example, quality control supervisors report to quality control engineers, and quality control engineers report to the quality control head.

However, the head of quality control and human resource are equal and report to the organization’s CEO. 

Span of Control

This shows how many departments the organization has; moreover, it defines how many employees a manager or department head can control.

The span of control determines the chain of command and provides shape to the organizational structure.

Formalization

Formalization defines how employees should behave and communicate through the chain of command. 

Formalization standardizes the workflow in organizations.

The Impact of Growth on Organizational Structure

The structure of an organization cannot be fixed, especially when the business is growing. 

When the company is small or starting up, it will have a simple structure.

As it grows bigger, but still handles a single project at a time, it can function well with a pure projectized organization. 

If the company is creating products and growing, it may shift to a functional organizational structure.

But as the business continues to grow, it cannot rely on a pure project or functional structure. It will require elements of both structures to support its needs. In such cases, the business can have a strong matrix or weak matrix structure.

As the company expands, it will need to have a hybrid structure to support its business objective.

The Advantages of an Organizational Structure

An organizational structure has a well-defined reporting structure, reducing friction among employees by clarifying roles and responsibilities.

Having a proper organizational structure can bring immense benefits to any organization. A well-chosen structure

◉ Allows an organization to grow.

◉ Focuses attention on your strategic goals, instead of each department focusing on its agenda.

◉ Unites a group of people and points them towards a common goal.

◉ Encourages employees to enhance their skills.

◉ Makes the decision-making process efficient, smoother, and faster.

◉ Facilitates the specialization of employees.

◉ Empowers better control and use of resources.

◉ Establishes a proper reporting system.

◉ Enables easier and effective communication, which helps reduce conflicts.

◉ Allows employees to perform better.

◉ Equips employees to grow their careers and streamlines new employee onboarding.

◉ Identifies clear roles and responsibilities.

Source: pmstudycircle.com

Monday, 9 August 2021

Types of Risks: Different Types of Risks in Risk Management

Risk Management, Risk Management Tutorial and Material, Risk Management Exam Prep, Risk Management Career, Risk Management Learning, Risk Management Guides

If you are in project management, you’ve probably heard about most types of risks. But, do you know all of them? Are you sure? Let’s find out with this post about the types of risks that can come up in risk management.

The term “risk” makes us wary; we think about the potential for harm; however, this is not the full story. Sometimes, risks can be positive. In modern project management, all types of risks are taken into consideration when planning.

Let us get started.

Types of Risks

◉ Risks

◉ Positive Risks

◉ Negative Risks

◉ Issues

◉ Known Risks

◉ Unknown Risks

◉ Residual Risks

◉ Secondary Risks

◉ Risk Tolerances

◉ Risk Thresholds

Risks

A project risk is an uncertain event that will positively or negatively affect one or more objectives if it occurs.

Risk is acknowledging that uncertain events may happen, allowing the project manager can equip themselves and their team to manage risks better. 

A risk can be of two types: positive or negative. The former is also known as an opportunity and the latter is called a threat.

Negative Risk

A negative risk is an unfavorable condition or situation that will negatively impact one or more of your project objectives.

Because they harm your project objective; therefore, you must mitigate their impact. Your strategy will be to either avert the negative risk or minimize its chance of happening.

For example, let us say that there is a possibility that a piece of equipment may break due to overuse; this will hurt your project.

Positive Risk

Positive risk is a condition or situation that will have a good impact on any of your project objectives.

Since these risks are favorable, you should try to encourage them. The response strategy is to increase the likelihood of the event happening or increase the impact.

For example, let us say that if you complete your project a few days before the scheduled date, you will get another gig.

Negative and positive are the two main types of risks.

Issues

This is a hot topic or a disputed matter. When project stakeholders have a disagreement, it is known as an issue. As a project manager, it is your responsibility to manage and note issues in an issue log with their resolution.

Known Risks

These risks have been identified.

For example, you know that there is a chance that one of your team members may go on leave during the peak of your project. This is a known risk; to manage it, you make a plan to bring in an identified employee.

You will use the contingency reserve to manage known risks.

Unknown Risks

These are unidentified risks; they are unknown until they happen. Since you cannot create a response plan, you cannot proactively manage these risks.

Unknown risks are managed through workarounds. Use the management reserve for these types of risks.

Risk Tolerance

This is the sensitivity of stakeholders or organizations towards risks.

High tolerance means people are willing to take risks, while low tolerance is an unwillingness unless the benefit outweighs the fear.

Tolerance is shown in limits.

For example, a 5% cost overrun is acceptable for an organization but anything above is not.

Risk Threshold

Risk Management, Risk Management Tutorial and Material, Risk Management Exam Prep, Risk Management Career, Risk Management Learning, Risk Management Guides
This is the amount of risk that an organization or individual is willing to accept.

The risk threshold is usually a definitive figure.

For example, your organization allows you a cost overrun of 10,000 USD. Anything more than that is not acceptable.

The risk threshold is a further step in risk tolerance. You could say that it quantifies the risk tolerance with a more precise figure.

Residual Risks

These are risks that are expected after implementing the planned risk response.

For example, let us say you are constructing in an earthquake-prone area. You design the building with the assumption that the largest magnitude possible is a 6 on the Richter Scale. 

What if an earthquake of a greater magnitude occurs?

This is an example of residual risk.

Secondary Risks

These arise as a direct outcome of implementing response to an identified risk.

For instance, assume you are constructing a building and, for security reasons, you installed electrical wire along the boundary wall. What will happen if someone accidentally touches the wire or if the wall is soaked during a storm?

Someone might get an electric shock.

This is an example of secondary risk.

Risk Triggers

Triggers indicate that risk is about to occur. They are sometimes called warning signs or risk symptoms.

For example, dark clouds can be a risk trigger for rainfall.

Source: pmstudycircle.com

Friday, 6 August 2021

Stakeholders in Project Management

Stakeholders in Project Management, Process Exam Prep, Project Management Tutorial and Material, Project Management Preparation, Project Management Career

Your project’s success depends on the satisfaction of your project stakeholders. Sometimes, you have completed the project; the client has accepted all deliverables. However, the project is not successful because some of your stakeholders are not happy.

Stakeholder satisfaction is a sign of successful project completion.

Now, you might be wondering who the project stakeholders are and whom you have to satisfy for the successful completion of your project.

I am writing this blog post to answer these queries, and I hope to clear up any doubts you may have about project stakeholders

Stakeholders

According to the PMBOK Guide, “A stakeholder is an individual, group, or organization who may affect, be affected by or perceive itself to be affected by a decision, activity, or outcome of a project.”

Put more simply, a stakeholder is a person, a group of people, or an organization that has an interest in your project or is affected by its outcome, directly or indirectly. It may include project team members, project sponsors, organization members, and people outside of your organization.

If the project is small, you will have a few stakeholders. For a larger project, you may have a huge number of stakeholders, which may include communities or the public. In this case, managing stakeholders will be challenging.

For example, if you are going to construct a dam, the number of stakeholders will be large. They will include governments, local authorities, the population that is going to be displaced, the population living near the dam, environmentalists, the project management team, higher management, etc.

Not all stakeholders are equal. Everyone has different requirements and expectations. You should treat them according to their requirements and expectations. Failing to do so can jeopardize your project’s success.

If you understand stakeholders’ needs, expectations, and requirements, your chances of success increase. Overlooking any important stakeholder can make the situation more difficult for you at later stages of the project. It may cause a delay in the project, cost overrun, and in the most severe cases, abrupt project termination.

Types of Project Stakeholders

Project stakeholders can be grouped into two categories:

1. Internal Stakeholders

2. External Stakeholders

Internal Stakeholders

Internal stakeholders are within the organization. For example:

◉ A sponsor

◉ An internal customer or client (if the project is for an internal need of an organization)

◉ A project team

◉ A program manager

◉ A portfolio manager

◉ Management

◉ Another group’s manager (e.g., functional manager, operational manager, admin manager, etc.).

These stakeholders generally have the highest interest in the project’s success.

External Stakeholders

External stakeholders are outside the organization. For example:

◉ An external customer or client (if the project is a result of a contract)

◉ An end user of the project’s outcome

◉ A supplier

◉ Subcontractors

◉ The government

◉ Local authorities

◉ Local communities

◉ The media

As you can see, external stakeholders include clients, governments, and local authorities, and these are very powerful entities. Therefore, you have to manage them carefully.

Positive Stakeholders and Negative Stakeholders

Stakeholders can be positive or negative.

Stakeholders in Project Management, Process Exam Prep, Project Management Tutorial and Material, Project Management Preparation, Project Management Career
A positive stakeholder sees the project’s positive side and benefits from its success. These stakeholders help the project management team to complete the project successfully.

On the other hand, a negative stakeholder sees the outcome and may be negatively impacted by the project or its outcome. This type of stakeholder is less likely to contribute to the success of the project.

Many professionals think that competitors are also negative stakeholders as your project affects them as well. Please note that competitors are not negative stakeholders because you have to manage your stakeholders proactively to complete your project successfully, but you do not manage or fulfill your competitors’ requirements.

The public can be a stakeholder, as we have seen in the earlier example. In this case, it would be impractical to manage the whole population, so you will consult their public figures or leaders to understand their requirements and expectations. 

Some examples of this type of project are related to mining, the environment, roads, railways, dam building, etc.

Some stakeholders will have low interest or influence on your project. However, you have to manage them as well, because they could become influential stakeholders.

Source: pmstudycircle.com

Thursday, 5 August 2021

What is a Projectized Organization Structure?

Projectized Organization Structure, Process Exam Prep, Process Preparation, Process Career, Project Management Learning, Project Management Study Material

Today we will discuss projectized organization structure.

Organizations are having to adapt to stay profitable in this tough market, they must be results-oriented while improving their operations and working conditions.

Organizations must adapt to a suitable structure to achieve their business goals, whether that be a functional, projectized, matrix, or other types of structure.

Now we will discuss projectized organizations.

Please note that project and projectized are different terms. Projectized is a classification for an organization that deals with projects; many experts call projectized organizations, project-oriented, or project-based organizations.

Projectized Organizational Structure

In projectized organizations, all activities are managed through the projects.

Here, organizations encourage employees to share their lessons learned. At the same time, they allow others to learn and benefit from a shared corporate knowledge base.

Project managers are in charge and they have complete authority over resources. All team members report to them.

Projectized organizations have no functional manager; if they do, their role will be minimal. Moreover, they won’t have any authority. The projectized structure is the opposite of the functional structure.

In projectized organizations, resources are utilized by the project work. These organizations are only interested in external project work. Usually, they have a few small, functional departments that support activities. Examples include admin, accounting, human resources, etc.

A projectized organization has to be dynamic for its survival. They always have to compete with other organizations to win bids. If their quote is high or technically inferior, they will lose the contract.

The project manager has all the authority. This does not mean they have the absolute power to do anything they desire.

For example, let us say that your project is a part of a portfolio. Some idle equipment is needed by another project under the same portfolio. In this case, the portfolio manager will assign this equipment to the other project. You may or you may not agree with this decision, but you have to follow the order.

Project managers have enough authority they need to complete the project and they can accept the responsibility and its outcome.

Characteristics of a Projectized Organizational Structure

The following are a few characteristics of a projectized organizational structure:

◉ Projectized organizations are dynamic and adaptive.

◉ Project managers have full authority over project resources. They control the budget and work assignments.

◉ Project managers have full-time team members under their control.

◉ Team members are often collocated for better performance until the project ends.

◉ When the project is completed, the team is disbanded, and resources are released.

Advantages of a Projectized Organizational Structure

These are a few advantages of a projectized organizational structure:

◉ Team members are loyal to the project goal.

◉ Team members report directly to project managers; the line of authority is clear. This reduces conflict and decision making is faster and more flexible.

◉ A single reporting system helps shorten communication lines, creating effective communication within the team.

◉ Communication is fast because of a single authority. This helps solve stakeholders’ concerns quickly. 

◉ Being the only authority, project managers can make quick decisions and complete the project faster.

◉ Communication and cooperation tend to be better because there is a sense of urgency when completing milestones. Hence, new members learn fast.

◉ Team members become more versatile and flexible due to working on different projects.

◉ Projectized culture is adaptive. Team members are encouraged to learn from others’ experiences and share their own.

Disadvantages of a Projectized Organizational Structure

These are a few disadvantages of a projectized organizational structure:

◉ Absolute authority can make project manager arrogant. Lack of power is an issue in a functional organizational structure, while absolute authority can be an issue in a projectized organization.

◉ Projects always have deadlines and tight schedules, which can make the work environment stressful.

◉ Poor communication can cause resource duplication if there are multiple projects.

◉ There is a sense of insecurity among the team members. They know they may lose their jobs once the project is finished. They tend to be less loyal to the organization.

◉ The cost of employees and equipment can be higher because they are being hired for a shorter period. Moreover, this cost can become much higher if the project is delayed.

◉ The employees may not be highly skilled in a particular area because they work on so many different projects. This may affect the quality of the deliverable.

Examples of Projectized Organizational Structure

Projectized Organization Structure, Process Exam Prep, Process Preparation, Process Career, Project Management Learning, Project Management Study Material
I often receive emails asking for examples of a projectized organizational structure. It is impossible to get a well-known example. Even if an organization is only dealing with projects, they need supporting departments to take care of routine tasks like admin, finance, human resources, etc.

Initially, when the organization is small, it is easier to be a projectized organization; a freelancer taking on a project or hiring temporary staff to complete a task.

However, as organizations grow and become bigger, they need to adapt and take on characteristics of a strong matrix organization.

Source: pmstudycircle.com