6 Things PRINCE2 Certified Project Managers Should Do Every Day

Prince2 Tutorial and Materials, Prince2 Study Materials, Prince2 Certification, Prince2 Guides

Projects are often very complex endeavours, but PRINCE2 is a project management method proven to deliver them successfully. Projects can vary greatly in their nature. The activities carried out by the project manager at any one time can be quite diverse. They depend on the exact nature of the project and where it is in its lifecycle. However, there are certain common activities that a PRINCE2 Certified Project Manager will carry out almost every day. Below we’ve highlighted a few key daily activities, these have been drawn from the PRINCE2 2017 A3 Process Map, which is available for free download.

1. Business Case Maintenance – PRINCE2 Project Managers understand how critical a Project Business Case is throughout the entire project, and as such are business savvy. They understand where the project fits into the big-picture: that the project is designed to deliver outputs which will deliver new capabilities to the organisation, with benefits that contribute towards an organisation’s strategic objectives. They are aware that the Business Case is a delicate balance of cost vs benefit, and they keep a keen eye on that delicate balance throughout the project in case it changes.

2. Plan – Because PRINCE2 emphasises management by stages, PRINCE2 Project Managers understand that an entire project can’t be planned up-front in minute detail. Instead, they understand that planning is a continual activity, with plans subject to revision as the project changes. Stage Plans periodically plan the next phase of work in more detail, ensuring consistent updates and remaining a central and valuable artefact to the project. This is unlike some project plans, developed as a “fire-and-forget” artefact at the start of the project, soon ending up on a dusty shelf – or even in the bin.

3. Manage Risks – Unmanaged risks can derail the best laid plans. PRINCE2 Project Managers are acutely aware of this and are constantly working to manage these risks. They use the PRINCE2 5-step procedure of Identify-Assess-Plan-Implement-Communicate to ensure risks are identified and analysed, and that the optimal risk response plans are put in place.

4. Oversee Work Packages – PRINCE2 Project Managers practice management by exception: they empower subordinate team leaders to take ownership of work packages. The PRINCE2 Project Manager’s role is to authorise activity to deliver the work package, monitor progress via team Checkpoint reports, implement a Corrective Action if it goes off-track, then finally accept the completed Work Product.

5. Report – The Project Manager needs to keep the Project Board up to date on the status of the project. They do this via Highlight reports, and if something has gone off-plan, an exception report. The PRINCE2 Project Manager understands that effective reporting means that the Project Board doesn’t need to pester or distract the project manager day-to-day. They receive the information they need when they need it, so they can allow the project manager room to deliver the project.

6. Reflect & Improve – Continual improvement is essential for a project. Understanding what worked and what didn’t enables you to react accordingly. PRINCE2 Project Managers understand this. They achieve it by maintaining a Lessons Learned Log, and producing End Stage Reports following each phase of the project. This ensures that the good, the bad and the ugly are captured and examined honestly, to inform how the project needs to evolve in the future.

On many projects, day to day delivery can sometimes almost feel like controlled chaos. But PRINCE2 Project Managers are different, they are equipped with the techniques from a proven method to successfully deliver whatever project they are working on. The key activities identified above will often be a staple of their day-to-day activities – and they should be of yours. Do you think a best practice methodology like PRINCE2 could benefit your day-to-day performance as a project manager? Click here to start your journey towards PRINCE2 certification.

Tuesday, 4 December 2018

Seven Focus Areas to Drive Lean Six Sigma Results

Six Sigma Tutorial and Materials, Six Sigma Learning, Six Sigma Study Materials

A Lean Six Sigma program that incorporates technically knowledgeable and motivated people at all phases of the deployment, along with a solid project charter and proper incentives, will not only ensure successful teams and management buy-in, but will also deliver better business results in the long term. The following seven focus areas will help drive passion and results, and make any projects in a Lean Six Sigma program successful.

1. Start with a Top-level Sponsor


A participative leader attends meetings, encourages team members and gives them the resources, budget and tools to succeed. Without such a sponsor, a Lean Six Sigma program will never produce the value necessary for the company and the viability of the initiative. To ultimately motivate the sponsor, Lean Six Sigma projects must be driven by and align with the company’s highest-level objectives.

2. Select the Best Available Team


While the Black Belt is the Lean Six Sigma team leader, a solid, properly chosen team is the key to success. The team must be motivated, cohesive, dependable, participative and technically knowledgeable. But those technically-competent stars are usually in high demand. They are pulled as key software developers, project managers and testers. It is up to the management to allocate some of these people to Lean Six Sigma projects.

Pick project team members who are connected to the process and have something to gain from improved results. Where possible, the process owners are the best match. The team also should have a solid Black Belt, coupled with a project sponsor, who is a proven leader respected by the organization and the team members. Publicize and promote the accomplishments of each team member in their particular areas of expertise and in past projects, if applicable. Everyone wants to work with successful people, and everyone takes pride in being acknowledged. If team members believe in the team, they are much more likely to be motivated and ultimately generate optimum results.

3. Align the Project Charter With Business Initiatives


The project charter should contain all the key information and data needed to accept, drive and fully support the process improvement. This includes the project’s estimated return on investment, goals, resource requirements and team members. The most critical item in the charter is the scope. Many projects are initially set with a “boil the ocean” scope. Instead, the scope should be appropriate and realistic. Once a proper scope is in place, attainable goals must be set.

4. Look for Simple Lean Fixes First


It is usually possible to find issues of the Lean variety much quicker and easier than more subtle changes unearthed in Six Sigma. Bottlenecks, wasted time and excessive wait time between steps are often isolated early in project activities. Some of these can provide critical wins while the team works on the tougher issues using Six Sigma. For example, I was once involved in a project to reduce cycle time from 44 months to 20 months. Within days, we uncovered a 26-signature sign-off process. A few simple and logical reductions drove the process from 44 months to three months before we continued the Six Sigma process to find the tougher improvements.

5. Address ‘What’s In It for Me’


Normally, team members are working on Lean Six Sigma projects while continuing with their “real jobs.” The overall Lean Six Sigma initiative must understand this fact and address it early and often during a project to keep participants as motivated as possible. These actions can range from special lunches at team meetings surrounding key milestones to public acknowledgement of successes to financial benefits at the end of the project. Such actions require a miniscule percentage of project savings, but keep people motivated and ready to contribute to the next project.

6. Make Performance Part of Management-level Bonuses


To make real achievements, goals, expectations, bonuses and results must be part of all leaders’ annual performance plans. The sponsor cannot preach Lean Six Sigma and then reward leaders solely on the basis of results in the typical reward areas. If goals and expectations relating to Lean Six Sigma are not fully in place, a deployment is doomed to second-class status.

7. Share Positive and Negative Results


Sharing results will help establish management buy-in and will demonstrate that Lean Six Sigma really works. If people in the organization do not see the positive results, they will feel that their work is in vain – a very unmotivating position to be in. Publicizing solid benefits and results will show that they have made a difference. Why publicize negative results? People often learn more from mistakes, errors or bad decisions than from good results. Also, it adds credibility when team members talk of negative items in this light to demonstrate a fair view of reality.

Monday, 3 December 2018

What Do Project Managers Do?

If you work in construction, IT, manufacturing, architecture, chemicals or any other major industry, you’ve almost certainly come across people with the job title ‘project manager’. Unlike some other positions within your industry, say site foreman or quantity surveyor, the moniker ‘project manager’ doesn’t really indicate what this person does. Yet, the project manager, PM, might just be the most important person on any specific task.

Project Managers, Process Guides, Process Study Materials, Process Learning

That’s because project managers are responsible for the overall initiation, planning, design, monitoring and execution of any specific activity. The PM needs to apply knowledge, skills, tools and techniques to activities to ensure the outlined goals of any project are met and completed on time and to budget. As you can see, there is a lot of responsibility on the shoulders of any project manager.

What does it mean to be a project manager?


If you are leading a project as the PM, you must rely on a series of skills. You must have the ability to assess situations clearly and accurately, asking penetrating questions, detecting potential issues before they arise and resolving any conflicts before they threaten to derail the project.

One key attribute is risk management. This is the main factor that can jeopardise any project and the issue that many unskilled project managers, or projects that are manager-less face. Risks need to be both formally and informally managed on any project and at every stage until completion.

Risks generally come about through uncertainty, which means the project manager needs to be an expert in communication, listening to other stakeholders and workers to identify risks in every aspect of the project. They then need to make decisions, both big and small, to mitigate these risk factors.

Project Managers, Process Guides, Process Study Materials, Process Learning

PMs also need to be versed in using relevant software to help them and others keep the project on track. There are several major software packages available, most of which allow PMs to produce work charts and reports quickly and clearly.

Project manager responsibilities


The exact defined role of a project manager depends on the nature and scale of the project. However, it is very likely to include:

◈ Planning and defining the scope and reach of the project

◈ Planning the sequence of works required to achieve the objective

◈ Monitoring and planning resources

◈ Communicating work schedules

◈ Estimating time and costs

◈ Risk analysis

◈ Monitoring and reporting

◈ Quality control

These are just some of the main areas of responsibility, and you can imagine how difficult it would be to manage a project without a lead point person or manager in charge. To effectively manage all the above and more, you need to be able to trust the PM and place faith in their ability to get the job done. That’s why appointing a project manager is often the key factor in the success and failure of any project.

Saturday, 1 December 2018

Different Phases of Project Planning

Image 1: Project Management Phases

Project Planning, Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Live
Project Management activities are a finite set of activities dedicated to a particular outcome. The project management process consists of five main sequential activities which are adopted at the differing phases of project activities. This article aims to dissect the stages of project management, into manageable digestible concepts, to help clarify any misconceptions you may have pertaining to the subject. For the phase assessment, I’m going to utilize an organizational wellness program as the project example.

1. Project Initiation


Initiating a project represents the commencement of project management activities. As a background, let us assume that the medical department of your organization has identified that employee wellness programs are a good means via which your organization can improve its employee morale. Studies have revealed that healthier employees are happier employees, and one way of encouraging healthy employees, is to build into their work curriculum opportunities to exercise either before or after work. A rival company has successfully managed to incorporate a similar program, and their employee retention has gone up.

After a suitable presentation to the senior management of the organization, the project’s feasibility and profitability are carefully assessed. Organizations no longer only focus on the bottom line, so if there’s an improvement to a quality standard in their overall operations, the odds of acceptance will be high.

Project Planning, Six Sigma Tutorial and Material, Six Sigma Learning, Six Sigma Live

The medical administrator would present their case via a business case, which is a document that highlights the pros and profits to be gained from implementing the project. This would typically be in for form of metrics such as dollars saved, or employee absenteeism reduction. As long as there is a positive reaction to the project activities, and the managers feel that the savings to be gained from executing the activity are favorable, then the project will be approved and the next phase of activity – Planning is then incorporated.

2. Project Planning


Typically, a business case document is outlined as a problem solving A3 in Lean and Six Sigma thinking. The business case value would have been determined by assessing the current condition of particular metrics. In this case, since the project is focusing on employee wellness, the critical wellness parameter prior to implementing the program, and subsequent to implementing the program would be assessed and compared. Additionally, since there would be literature involved, the anticipated changes due to implementation would already be scientifically proven.

The case study’s methodology can then be transferred to the organization in question, and broken down into the critical process steps. Thought processes such as what tools will be needed to facilitate this transition? Will Fitbits help us, or can regular pedometers do the trick? How will we promote the campaign? All these questions…once answered, can be ordered into a format, a sequential and logical plan that can be executed in the next phase of the exercise.

3. Project Execution


There’s a saying that goes “A goal not written down is just a wish.” Adding to this…is that even if a goal is written down, if it’s not acted upon, it will still remain a wish. After the project execution plan has been laid out it is time to facilitate the appropriate execution of the project. This often involves ensuring that the appropriate project ambassadors are recruited, and their services are offered the right place and time across the project time line.

In the planning phase, the appropriate timelines for each activity would have been identified, so all that would be left for the accomplishment of the project is ensuring that the activities are facilitated. All resources would have been sourced, and the project value then created via synthesis of all these project activities to create the final outcome.

4. Project Monitoring and Control


What gets measured, gets managed in Lean and Six Sigma. When the project itself has been designed, and is being executed, it is important to ensure that accountability measures are in place to ensure an on-time delivery. If project activities are set for a particular due date, it is the responsibility of the project manager to ensure that the project management activities are being executed on time. If there is a delay, appropriate corrective measures are to be executed. If an activity is running ahead of schedule, that is always a good thing. Critical project key performance indicators, cost allocations, and time are critical parameters to monitor across the project execution process.

5. Project Closure


Projects are not intended to be ongoing activities. According to the project plan, certain activities are to be executed by a particular time. Once all critical project activities are executed, the project itself becomes complete. The project manager, as the project was being executed, would have been checking to ensure that all project time, cost, quality deliverables were being met. Once all deliverables are met, the project itself ends, and operational activities then take over.

As acknowledgement of the project’s closure, a communication to the critical project stakeholders can be held. This could be done in the form of a meeting highlighting the project activities, and also any testimonials or demonstrations of the final product in execution. Inclusion of the project operational activities such as monthly organizational publications is a good means via which the stakeholders will keep the project at the top of mind. Many activities tend to stagnate due to lack of attention, so keeping up with the activities is a critical way of ensuring that the project continues to deliver value.

Thursday, 29 November 2018

The 5 ITIL Processes And Their Definitions

Information Technology Infrastructure Library or ITIL for short has 5 stages in its lifecycle:

ITIL Processes, ITIL Study Materials, ITIL Learning, ITIL Certification

◈ Service Strategy
◈ Service Design
◈ Service Transition
◈ Service Operation
◈ Continual Service Improvement

These stages are linked with each other and cover the Free ITIL Foundation Overview course. They are necessary to form a perfect ITIL Service Management plan. Every stage covers a different part of the content. Basic ITSM training provides an overview of all these stages to the individual seeking to improve their skill in the following field. For the ITIL processes to work properly, it should have the accompanying content. If this is not done, the whole process and all the other stages will collapse.

IT service managers these days are required to be knowledgeable about all the ITIL processes and the service owner should be able to implement all these stages effectively because the owner will ultimately be taking the helm of the service and its lifecycle. Roles and responsibilities when handling ITIL service management are covered in ITIL foundation certification courses available to all IT service management personnel.

What Does ITIL Do For You?


A lot of organizations these days consider processes, capabilities, people and their technology to be not physical but strategic assets. These assets make the organization and give it the identity it is known by in the world. These capabilities, resources and products can help create an advantage in the market if the effective alignment is done.

This is where ITIL plays a majorly important role. The world has dubbed ITIL as the most widely accepted approach to IT service management. Individuals and organizations can conclude what types of changes are required by the organization to transform and grow into a better version of them.

The main goal that ITIL seeks to achieve is improvement in how IT delivers and supports various valued services from businesses. It’s not just about technology or process management, it also aims on improving people by improving their capabilities, processes and technology. ITIL improves the value of an organization, by improvement in resources, capabilities for employees and customers.

ITIL Process 1: Service Strategy


This is the core stage of the ITIL lifecycle, without the organization having a solid IT strategy to go along with the business strategies that an organization follows, the service is less likely to succeed. This process is the pillar on which the rest of the processes stand as it also provides the other stages with a direction to follow.

The service strategy is the initial link that connects business strategies with IT strategies of an organization. This stage further includes return on investment, financial management, demand management process and service portfolio management.

ITIL Process 2: Service Design


The Service Design stage in the process is the stage where both planning and designing of IT strategies takes place. To introduce new services, they are planned and designed in this stage in order to build a greater vision for the organization. If an IT service is well designed, it should have no trouble transitioning into a love environment.

This stage mainly includes:

◈ Service level management
◈ Service Catalog Management
◈ Capacity Management
◈ Service continuity management
◈ Availability management
◈ Supplier management processes
◈ Information security management

It service manager of an organization must be familiar with all of these to facilitate the organization in different endeavors.

ITIL Process 3: Service Transition


This is the stage where previously designed strategies are built, tested, verified and implemented after which they are sent to operations. This stage includes:

◈ Planning and support
◈ Service assets and configuration management
◈ Change management
◈ Service validation
◈ Release and deployment management
◈ Testing evaluation
◈ Knowledge management processes

ITIL Process 4: Service Operation


This is the process where your designed services come to life as they are tested and implemented in live environments. This is the now or never phase for the service as customers start to use and the service and give feedback about it. This stage includes:

◈ Incident management
◈ Event management
◈ Problem management
◈ Request fulfillment
◈ Access incident management

ITIL Process 5: Continual Service Improvement


This is where all the previous stages come together. This process in turn acts as a protective layer for the ITIL process as this process is the sole analyzer of improvements that can be made to enhance customer experience and employee understanding of how the customer would prefer the service to work.

With so many things that an organization can take advantage of with ITIL, ITSM training for individuals seeking employment with them has become necessary. There are numerous portals allowing for individuals to learn ITSM and get ahead in the IT world.

Wednesday, 28 November 2018

Overview of ITIL Service Design

ITIL Service Design, ITIL Certification, ITIL Tutorial and Material, ITIL Study Materials

ITIL Service Design is more or less known as the blue print phase. Well as we know the ultimate end product of Service Strategy is business case and this will be the input to the Service Design. The main purpose of Service Design is to design IT services together with the governing IT processes, practices and policies to realize the service providers strategy and then to facilitate the introduction of these services into supportive environments ensuring customer satisfaction, quality service delivery and cost effective service provision.

In Service Design we come across eight processes which are:


1. Service Catalog Management
2. Service Level Management
3. Capacity Management
4. Availability Management
5. IT Service Continuity Management
6. Information Security Management
7. Supplier Management
8. Design Coordination

Out of these eight processes Design Coordination is the new process added to the new syllabus. The main objective of Design Coordination is to coordinate between different processes with the Service Design stage to produce a Service Design Package.

By adopting and implementing standard and consistent approaches for Service Design will – Reduce total cost of ownership, – Improve Consistency of service, – Improve quality of service, – Improve service alignment, – Ease the implementation of new or changed service and Improve service performance. In Service Design we also come across the four P’s which are:

1. People {Includes Employees, Stakeholders}
2. Processes
3. Products {Includes Technology, Service and tools}
4. Partners {Manufactures, Vendors and Suppliers}

ITIL Service Design, ITIL Certification, ITIL Tutorial and Material, ITIL Study Materials

In Service Design we come across terms like Service level requirement (SLR), Service level agreement (SLA), Operational level agreement (OLA), Contract and Underpinning contract (UP/UPC). At times people get confused between Operational level agreement (OLA) and Underpinning contract (UP/UPC), Please understand that it’s in the Underpinning contract (UP/UPC) where the third party would be involved. Say for example you buy a mobile from AT&T on a contract and you have an issue with the actual mobile itself you will not contact the mobile manufacturer regarding the issue you will still get in touch with AT&T because the contract is through AT&T.

We also will look at the different Supplier categories which are:


1. Strategic: Normally these relationships would be managed by the senior management level within the service provider organization
2. Tactical: These relation would be managed by the middle management level
3. Operational: These relation would be managed by the junior management level
4. Commodity: If not from this place from another place which could be easily available (Example- Stationary).

Tuesday, 27 November 2018

What Are ITIL Certifications & Are They Worth It?

What is ITIL


The Information Technology Infrastructure Library (ITIL®) is a set of best practices designed to describe common approaches that IT service management (ITSM) can take to align IT services with business needs and deliver value to the organization.

ITIL Certifications, ITIL Tutorial and Material, ITIL Guides, ITIL Study Materials

The current version of ITIL offers a series of professional certifications designed to validate an individual's level of competency in specific areas that ITIL covers, or to demonstrate an individual's level of competency in the overall set of ITIL best practices.

As with many professional certifications, determining the precise value of earning an IT credential is difficult to calculate. However, it is widely understood that a combination of tangible and intangible factors make certifications a worthwhile investment of time and money for both organizations and individuals.

This article discusses the value of ITIL certifications to both organizations and individuals within the context of these various tangible and intangible factors. Data in this article is based on survey results from respondents with various degrees of ITIL certification, who shared specific organizational improvements that were made possible due to the knowledge gained while earning their ITIL certifications. These specific organizational benefits are clear examples of the value of ITIL certifications.

What Are ITIL Certifications?


The official ITIL certification program currently consists of 12 certifications that attest to the holder's knowledge from a very basic level up to a level indicating significant overall mastery.

ITIL Foundation

The official ITIL certification training program currently consists of 12 certifications that demonstrate an individual’s knowledge from a very basic, introductory level up to an advanced level that indicates overall mastery.

Gain fundamental ITIL best practices knowledge to prepare for ITIL Foundation certification with our ITIL Foundation course

ITIL Intermediate Certifications

The ITIL Intermediate certifications are the next step after earning an ITIL Foundation certificate. The intermediate certifications are divided into two paths: Lifecycle and Capability.

Expand on the concepts learned in ITIL Foundation with our lifecycle and capability courses.

Intermediate Lifecycle Path


The ITIL Intermediate Lifecycle consists of the following five certification courses:

◈ Service Strategy
◈ Service Design
◈ Service Transition
◈ Service Operation
◈ Continual Service Improvement

Earning any of these certifications proves that the holder has demonstrated a solid understanding of that aspect of the ITIL best practices. To earn any of the ITIL intermediate lifecycle certifications, individuals must pass a challenging exam that asks how they would handle very realistic scenarios using ITIL best practices.

Generally, the ITIL Intermediate Lifecycle certifications are appropriate for management and decision makers in an organization, as the courses that support these certifications generally take a management-level approach to coverage of the ITIL best practices.

Intermediate Capability Path

The other side of the ITIL Intermediate certifications is known as the Intermediate Capability Path. The capability path consists of the following certification courses:

◈ Planning, Protection, and Optimization
◈ Release, Control, and Validation
◈ Operational Support and Analysis
◈ Service Offerings and Agreements

As with the lifecycle certifications, to earn any capability certification, individuals must pass an exam covering that specific topic.

The ITIL Intermediate Capability certifications are appropriate for those who regularly perform various hands-on IT activities, as the courses that support these certifications tend to take a more detailed look at ITIL best practices.

Advanced ITIL Certifications


ITIL Expert

Once a candidate has earned the ITIL Foundation certificate plus at least 17 ITIL v3 or newer credits from the available ITIL intermediate certifications, the individual is eligible to take a course called Managing Across the Lifecycle (MALC). MALC, like the intermediate certifications, requires that the individual pass a challenging exam. Once individuals pass the MALC exam and have the required number of credits, they are awarded the ITIL Expert certificate. The ITIL Expert credential indicates that the individual has a strong, high-level understanding of the ITIL best practices and how they're used to help organizations, as well as the skills to manage the planning and implementation of IT Service Management.

ITIL Master

ITIL Master is a specialized level of certification beyond ITIL Expert for individuals who have in-depth practical experience with implementing ITIL best practices. In order to achieve ITIL Master, an individual is required to describe and defend real-life projects they have completed using ITIL best practices.

View our full ITIL Training course catalog

Survey Details


In order to assess the value of ITIL certifications to individuals and organizations, a survey was created and targeted to individuals who have earned various ITIL certifications. The purpose of the survey was to assess both the tangible and intangible value of these certifications, and it focused on various ITIL Intermediate certifications and ITIL Expert. The value of ITIL Foundation was not assessed because that is a basic, common, entry-level certification. The value of ITIL Master was not assessed because it is a new certification that was relatively unknown in the market at the time of this survey. The survey consisted of five questions.

The survey was sent to 117 people known to have earned at least one ITIL intermediate certification. Many of the respondents have earned multiple ITIL certifications, including ITIL Expert.

Overall, the survey was designed to be simple, easily completed within a few minutes, and aimed towards identifying whether or not there was some benefit of ITIL certifications to individuals and organizations.

Analysis - The Value of ITIL Certifications to Individuals


Responses to the survey showed clearly that earning intermediate and advanced ITIL certifications is valuable to individuals.

Of the 117 participants, 76.5 percent indicated that earning ITIL intermediate and advanced certifications made them more marketable compared to others in the job market. This is significant because recent economic conditions have made it crucial for applicants to prove that they have significantly better credentials and experience than those they're competing against for limited jobs.

Of the respondents, 58.8 percent indicated that the ITIL intermediate credentials resulted in an improved ability to compete with others in the job market. This question was intended to assess whether the pursuit of ITIL intermediate and advanced certifications resulted in a new skill set that made respondents more competitive than others. Clearly, there is an effect here, given that over 50 percent of the respondents indicated that, due to pursuit of ITIL intermediate and advanced certifications, they were better able to compete with others in the job market.

Individuals occasionally pursue ITIL certifications as a means to qualify them for specific roles in an organization. The survey indicated that over 50 percent of the respondents qualified themselves for a specific role by earning advanced and intermediate ITIL certifications. This represents significant value and speaks to the extent to which organizations value the knowledge and experience gained when an individual earns advanced ITIL certifications. Clearly, employers respect these certifications if they are willing to assign key roles to people based on their ability to earn these certifications.

A regular criticism of ITIL certifications is that they fail to generate new knowledge in individuals. The survey results showed the opposite of this belief: 70.6 percent of respondents indicated that they developed specific beneficial knowledge and expertise, which is a clear indication of value to individuals in terms of learning new and useful information.

Respondents also overwhelmingly indicated that earning advanced and intermediate ITIL certifications resulted in direct application to work activities and projects. Of the respondents, 76.5 percent showed that these certifications held value for them in the form of being able to directly apply knowledge learned in pursuit of the certification to specific work activities.

Another key aspect of the responses to this question is that all respondents indicated that at least one aspect of individual value was present for them. In other words, none of the respondents indicated that the ITIL advanced and intermediate certifications lacked value.

Analysis - The Value of ITIL Certifications to Organizations


There is much debate in the IT world about the value of certifications to organizations, and this debate often includes the value of ITIL certifications. Value has intangible aspects, and it's often difficult to adequately assess value. This survey assessed several aspects of the value of ITIL certifications to organizations by asking respondents how earning these certifications helped their employers.

Forty-seven percent of respondents indicated that their employers experienced improved efficiency in terms of cost and time, while 55 percent indicated improvements in overall effectiveness. Efficiency is a matter of an organization conducting its activities while minimizing waste. Effectiveness is a matter of conducting the right activities to support business activities. Clearly, organizations found value in terms of efficiency and effectiveness since they encourage employees to earn intermediate and advanced ITIL certifications.

◈ Finding: Organizations found value in terms of efficiency and effectiveness, since they encourage employees to earn intermediate and advanced ITIL certifications.

The next two statements also assessed efficiency and effectiveness, but in different ways. First, improved overall organizational quality is primarily an assessment of efficiency, and 41 percent of the respondents indicated value to their employers in this area. Improved alignment within the business is an indicator of effectiveness, or doing the right things, and 52 percent indicated that overall business alignment improved as a result of their pursuit of intermediate and advanced ITIL certifications. This is significant because IT organizations regularly struggle with efficiently using limited resources and budgets, and often suffer from regular conduct of activities that the business does not find valuable.

◈ Finding: Individuals earning advanced and intermediate ITIL certifications helped their employers in the areas of efficiency and effectiveness and, therefore, have value to organizations.

The next statement asked respondents if earning advanced and intermediate ITIL certifications improved the perception of IT within the business. Thirty-five percent of respondents indicated that it did. Of course, this issue is not as important as overall efficiency and effectiveness, but it was important enough that over one-third of respondents indicated improvement in this area. Some IT organizations suffer from a negative perception by the business, which can limit overall IT effectiveness.

◈ Finding: The knowledge gained by earning ITIL certifications can help organizations overcome negative perceptions of IT.

Often, businesses must compete with other businesses for work, and demonstrating a measure of knowledge and expertise with ITIL best practices can result in one organization winning work over less experienced organizations. Thirty-five percent of respondents indicated that their earning the advanced and intermediate ITIL certifications resulted in a business ability to pursue new work or contracts.

◈ Finding: The clear value statement is that when an organization's employees develop knowledge of ITIL best practices through earning intermediate and advanced ITIL certifications, it can have a direct impact on an organization's revenue.

Only 23.5 percent of respondents felt that the knowledge they gained provided their employers with an overall form of risk management. A generally held belief in the IT industry is that employees earning certifications is one form of risk management available to organizations.

◈ Participants in this survey did not see as strong an effect in the area of risk management as in other areas assessed in this survey.

Finally, 47 percent of respondents indicated that the knowledge they gained allowed them to directly address one or more specific issues, projects, or activities. The benefit for employers here is clear: their employees learned something when they earned these certifications that they could apply directly to activities at work.

◈ Finding: Certification is often held to be theoretical; however, this survey indicates true value to employers in the form of developing in their employees the ability to accomplish important and significant things for the organizations.

Additionally, 100 percent of the respondents indicated that the costs, in terms of time and money, to earn intermediate and advanced ITIL certification were worthwhile.

Analysis - Specific Organizational Improvements


Respondents to the survey were given the ability to enter free-form responses detailing specific organizational improvements that have occurred due to the knowledge gained in the pursuit of intermediate and advanced ITIL certifications. There were numerous specific improvements noted by the respondents. Some of the responses to this question included:

◈ Massive process implementation and improvements.
◈ We have used ITIL for process development and documentation supporting ISO 27001.
◈ The knowledge I gained from the ITIL certifications helped me in standardizing and putting together processes across our IT organization in order to improve our effectiveness in serving our customer base.
◈ Improved overall organization health and ability to work within IT budgets that were not increasing for several years.
◈ Due to the new rare skill set available to the business unit with my certification, the officers responsible are able to pursue organizational changes in alignment with ITIL framework, for better efficiencies and effectiveness. Personally, I am also able to convince others of the process changes needed to bring efficiencies in the responsibilities that I own with more conviction.
◈ Re-organization of our IT department to better facilitate service management in the business - New Project proposal and filtering processes 
- Additional testing and validation improvements - Additional business support and change/release buy in

◈ IT department transparency. The IT department is now more of a partner with the business. The business knows what IT is doing.
◈ Implementation of change management and improvement in alignment with business.
◈ We centralized 11 regionally dispersed service desks into one and increased the coverage to 24/7 resulting in reduced costs to provide commonly expected service desk functions.
◈ I don't use ITIL to help my employer, but I do consult with our customers in helping them with their organizational improvements in all process areas.
◈ Have formed a new IT Service Management team that I am leading. Have onboarded remaining IT support teams onto common Incident Management process. Working on Problem and Change Management. Have stood up CMDB.
◈ My company has recently established an internal 'center of excellence' for ITIL. I am a member of its steering committee.
◈ Transition a very siloed model into a service desk (depot) model. Currently integrating incident management with problem management, and designs have been set in place for access management to transition into the service desk.
◈ The organization was able to generate additional revenue and reduce information technology expenses through following ITIL best practices.
◈ My department was better able to get control of requests of the IT department. This made our customers happier and ended up with fewer requests that weren't being handled. This reduced delays experienced by the business and saved them money.
◈ We were able to align several initiatives that were not going well by implementing aspects of governanceasgovernance as described by ITIL.
◈ The organization is responsible for various services. We were able to more effectively manage diverse services including everything from desktop support, to mainframe systems, to cloud computing in a consistent manner that resulted in predictable costs and quality for the business.

This survey collected numerous responses that indicated specific and real actions that had value to organizations that were directly related to an employee's experience earning intermediate and advanced ITIL certifications.

What Does This Mean?

Simply put, this survey demonstrated that ITIL certifications hold significant value for both individuals and employers. That value can be demonstrated by clear benefits to individuals as well as clear, documentable benefits to organizations. In addition, these benefits are scalable across individuals, industries, and environments.

The Future

We intend to conduct this survey periodically in the future and continually improve it. Ideally, we'll expand this to a broader audience and will further tailor the survey questions to elicit responses that allow a continued determination of whether ITIL certifications generate value for both individuals and employers.

How to Turn Resistance into Support for Lean Six Sigma

One phrase in Lean Six Sigma that may be heard more than any other is “culture change.” Most organizations today are undergoing some form of culture change, and 75 percent of all major or cultural changes fail to achieve their goals. Experience shows when strength and culture collide, culture has a higher probability of winning.

Change takes time and commitment. While some resistance to change is inevitable, there are ways to accelerate change through best practices using tactical tools to gain acceptance, change old habits and greatly increase the bottom line.

A Plan for Change


“For new technology to be embraced, people have to believe that it has 10 times the advantages of what people were previously doing,” according to Peter Drucker. Drucker, considered a management guru, has written numerous books on management issues and practices, including Megatrends. What are the implications of his statement?

◈ Management must really sell its ideas/solutions.
◈ People must see the benefit of the solution and that benefit must far outweigh the status quo.
◈ People get ingrained into a way of doing things that is hard to break.

Lean Six Sigma tools provide a technical solution, but what provides organizational acceptance? Successful changes require dual strategies.

The ‘Change Equation’


“Stakeholder” is a word frequently used in continuous improvement programs. However, Lean Six Sigma project teams must keep in mind there are two groups of stakeholders – those who are impacted by the change and those – typically leaders – who can speed or impede progress. Influencing stakeholders can be understood through the change equation:

DxVxP > R

This model implies that to overcome inevitable resistance to most change (R), there must be some level of dissatisfaction with the status quo (D), a clear behavior-based vision of where to go (V) – or the desired state, and a clear path (process or plan) to get there (P). Practically stated, teams will need to answer these questions:

1. Why change?
2. What will change?
3. How will it change?

Need for Change and Dissatisfaction with Status Quo


A comprehensive change acceleration plan includes articulating the need for a particular change. Within DMAIC, project teams identify reasons for the target process in the Define stage – essentially building a business case for the project. As more feedback and process data become available in the Measure and Analyze phases, teams can re-address the dissatisfied component of the change equation, ultimately refining these arguments when solutions become clear (Improve). For example, a stakeholder might support working on a clearly broken process (Define, Measure, Analyze) but may not support the specific proposed change (Improve).

Teams must provide evidence the status quo is not good enough through addressing whether the current process or service is truly broken and articulating the benefits of change. An effective tool to use is a threats and opportunities matrix (Figure 1). Similar to a force field analysis, this version has four columns.


Figure 1: Threats and Opportunities Matrix

The threats and opportunities matrix helps develop a compelling argument by identifying ramifications of not making the change – or all of the bad things that would happen without changing. It also identifies benefits and opportunities of making the change. Many times the opportunities will be the antithesis of the threats; however, teams should go beyond the obvious. Sometimes viewing the issue from a different perspective can lead to additional reasons for making the change.

As a team makes a case for change, it should pay close attention to the matrix headings. If threats for making the change are identified, essentially a case is being made for not changing. With that in mind, a team should be as specific as possible. The more reasons for change the better, as different arguments will compel different stakeholders. The right argument will eventually match with the right stakeholder.

Identifying arguments against change will help the team understand potential pockets of resistance. The key is to externally communicate arguments for making the change and utilize their assessment of arguments against the change to develop rebuttals or enhance the solution.

People Are Influenced in Different Ways


Most studies indicate that influence approaches can be categorized into three strategies – data, sensory or incentive/de-incentive. Stakeholders influenced by data will probably respond well to a detailed, positive cost/benefit analysis. Sensory stakeholders may benefit from a simulation of the new process or a benchmarking visit to an organization that successfully implemented a similar change. Finally, stakeholders most influenced by incentives will most likely respond to an incentive plan rewarding behavioral changes, or the resulting de-incentive for lack of change or support. Leveraging multiple approaches in influencing stakeholders will have a higher probability of success.

Using the completed threats and opportunities matrix, a team can identify possible strategies to influence resistant stakeholders. For each threat or opportunity, identify one data element and one sensory element that would validate the threat or opportunity. Then, identify an incentive/de-incentive approach that might push stakeholders to make the change.

Creating a Behavior-Based Vision


Teams start shaping the vision for the desired state in the early stages DMAIC, but they will not be able to make that vision behavior-based until solutions are clearly defined in the Improve phase. An effective vision statement will inform stakeholders about what will actually be different in the desired state, and what they will be doing in the new environment. Using a mission/results/actions (MRA) aatrix such as the table below will help craft that vision.

Mission/Results/Actions (MRA) Matrix
Mission Results Actions (Behaviors) 

A solid vision should include a higher level, strategic mission or objective for the change/solution. This statement should be concise and agreed on by the team.

The vision should not stop there, however. Teams should identify and communicate organizational and individual performance expectations or results. These should be specific, measurable descriptions of what is to come, and should include both organizational goals (e.g., cycle time will be reduced by 50 percent) and individual goals.

Finally, teams should give the stakeholder a line of sight to the desired state by articulating what each stakeholder will be doing differently – their actions or behaviors – in the new environment.

Once the objective or mission of the change is agreed upon, teams should use a T-diagram to compare results and behaviors for both the current and future environments.


Figure 2: Methods for Communicating the Vision

Creating the vision is important, communicating it is more important. Teams should take advantage of a variety of communication vehicles to “paint their picture” of the desired state. Sensory approaches are most effective. These communications tools include process mapping, simulations, models and training.

Communicating the Path to the Desired State


How does anyone move from the current state to the desired state? The path component of the change equation comes into play as solutions take form during the Improve phase. Some stakeholders will be concerned about the ability to get to the desired state or potential roadblocks and disruptions along the way. Incorporating a clear path into the communication plan is essential.

There are a number of familiar project planning, management and communication tools, such as Gantt charts, work breakdown structures, and multi-generational planning, as well as clearly documented roles and responsibilities. These same tools should be leveraged to communicate the change plan to key stakeholders. That leveraging can take the form of asking questions – an excellent way to easily communicate the plan to make the desired state a reality.

Taking Pulses of Levels of Support and Resistance


People resist change for a variety of reasons, including technical, political and cultural reasons.

◈ Technical: They do not know how to do the new stuff; they would have to invest time, money, effort or equipment to make the desired change; they feel they cannot do it; they truly feel the new solution is not as good as the status quo.

◈ Political: Real or perceived fear of losing autonomy, authority, respect, power, etc.

◈ Cultural: The change just does not feel right; stakeholders are used to or comfortable with the status quo; peer pressure, fear of standing out.

Like an iceberg, where only a small portion can been seen above water, most of the resistance that teams actually see is just the tip of the problem. Usually a great amount of resistance remains an undercurrent. Specifically, stakeholders tend to surface their technical reasons for resisting change – “it’ll cost too much” or “we’ll have to spend a lot of time in training.” What they often do not surface are their political and cultural reasons for resisting. Teams can use good, old fashioned interviews and feedback mechanisms to uncover technical reasons for resistance. They will need to use observation and other insights to identify political and cultural reasons for resistance.

Here are a few techniques to assess the level of support (or resistance) for their specific change effort and to identify possible reasons for that support or resistance.

Consider the following important questions:

◈ Who are the key stakeholders?
◈ What is their current level of support for this change?
◈ What level of support is needed from them to ensure success?
◈ Why are they supportive or resistant?
◈ What is the source of their resistance?

The most appropriate tool for this is the stakeholder analysis. This tool takes many forms; however, they all should accomplish the same goal use guidelines similar to the following:

1. Identify key stakeholders
2. Determine their current level of support for the project (on a 1-5 scale)
3. Determine the level of support needed for the project to be successful (on a 1-5 scale)
4. Identify reasons for resistance or any concerns

A typical 1-5 scale would show 1 as strongly resistant, 3 as neutral and 5 as strongly supportive. It is important to gain agreement on what each of these levels means, and keep the assessment behavioral-based. This scale can easily be adapted for more advanced analysis. For example, prioritizing stakeholders in terms of their potential impact on the success of the change effort is often helpful.

Bringing It Together in an Influential Plan


To accelerate change, teams need to focus both on coming up with a solid solution and a plan to gain acceptance. Teams need to answer the why, what and how questions for key stakeholders. In addition, teams need to assess levels of support and/resistance to their proposed change in order to effectively match influence strategies with specific stakeholders.

The goal in developing an acceptance strategy for a proposed change is to turn resistance into support. Teams must develop a detailed communication plan. It comes down to assessing the levels of support or resistance to change, answering critical stakeholder questions and building a solid acceptance strategy.