Thursday, 22 November 2018

ITIL Certification Cost & Benefit Analysis

What is ITIL?


ITIL refers to a detailed set of practices for managing IT service management, commonly known as ITSM. These practices apply to any type or size of organization that wants to align IT with severally business strategy, while delivering value and maintaining a minimum competency level. ITIL practices include a range of processes and procedures, tasks, and checklists that aid in demonstrating compliance, measuring improvement, and avoiding common pitfalls – all to deliver the best quality services to the end user.

ITIL Certification, ITIL Tutorial and Material, ITIL Guides, ITIL Study Material

The preeminent ITSM and service delivery framework across the globe, ITIL is currently owned and maintained by AXELOS, a joint venture between Capita and the United Kingdom’s Cabinet Office. (Note that ITIL used to be shorthand for Information Technology Infrastructure Library, but today it’s known primarily and officially as ITIL.)

ITIL is used across the world and in a wide variety of industries, with internationally known companies like IBM, HBSC, and even NASA implementing ITSM strategies. For many companies, the biggest benefits of ITIL are its versatility and scalability: companies can take as little or as much as they’d like from ITIL, and they can also combine it with practices that follow other popular frameworks like Six Sigma, COBIT, and TOGAF.

Pursuing ITIL certifications


While you can certainly study up or apply ITIL principles and practices in your own company, you can also pursue official ITIL certifications, which indicate familiarity, knowledge, and even mastery of ITIL principles put into practice. Importantly, ITIL certifications are available only to individuals, not to an entire organization. For instance, if a company claims they are ITIL certified, they may in fact comply with a related, but different, standard of the ISO/IEC 20000, or they may simply be promoting any number of employees within the company do hold ITIL certifications.

Levels of ITIL certifications


So how does certification work? ITIL certification is divided into five levels of certifications. One person may only seek an entry- or medium-level certification, while a project manager or CIO may seek to obtain Expert or Master status in ITIL. Of five levels, the first four levels are based on number of credits and passing examinations. Reaching the Expert certification, the 4th-highest level, requires 22 combined credits. Achieving the ultimate Master level, however, does not rely on credits and instead has its own criteria.

Here are the five ITIL certification levels:

Foundation: the entry level. With no pre-requisites, anyone can sit for this exam.

Practitioner: this second level is the newest addition to ITIL certifications. Sitting for this exam requires passing the Foundation level. This level is not a pre-requisite for upper level certifications, but its 3 credits upon passing do count towards the overall credits needed for Expert certification.

Intermediate: this level is based on modules within two categories. Candidates can choose topics within both categories:

◈ Service Lifecycle, with modules focused on Service Strategy, Service Design, Service Transition, Service Operation, and Continual Service Improvement.
◈ Service Capability, with modules focused on Operational Support and Analysis; Planning, Protection, and Optimization; Release, Control, and Validation; and Service Offerings and Agreements.

Expert: pre-requisites include 17 credits from the previous 3 levels. Passing the Managing Across the Lifecycle (MALC) exam grants an additional 5 credits, making a student eligible for the Master-level certification with 22 credits.

Master: the ultimate ITIL certification, a candidate must demonstrate ITIL mastery by completing Expert certification (22 credits minimum), demonstrating minimum 5 years’ experience in a management or leadership role, submitting a proposal for ITIL service improvement, submitting a work package wherein the candidate successfully applied ITIL practices to a real-world business case, and completing an interview with an ITIL assessment panel.

Pricing of ITIL certifications


Current ITIL owner Axelos oversees and maintains the ITIL framework and accredits training and exam institutions. There are hundreds of ITIL accredited training organizations (ATOs) that deliver training and certification examinations, which are available on the Axelos website.

A candidate for ITIL certification may choose from certification providers who are accredited by AXELOS for providing the training and examinations. Non-accredited providers may cost less, but their content and results may not be as reliable or vouched for. Pricing varies depending on country you reside and whether you’re taking an in-person course, online option, or an in-house training within your company. Candidacy for the Master-level certification alone is $4,000.

Benefits of ITIL certifications


Digital services are the de facto product these days: more and more companies are buying into – and selling – digital services, instead of tangible, heavy, customized options. Digital services typically rely on ongoing project management that focus on the service’s objectives while also paying attention to inevitable issues in developing, delivering, and maintaining the service. A good IT service management approach is knowing exactly how to integrate all these ever-changing factors into your development process.

As ITIL strives to address this inherent potential and risk, common business advantages that result in an ITIL approach include:

◈ Decreasing time, money, and other resources spent on the entire service development lifecycle
◈ Improving the overall quality of the end product
◈ Boosting staff morale
◈ Increasing customer satisfaction.

Businesses may see explicit improvements, too, such as:

◈ A better, more tangible understanding of your customers, their needs, and their expectations
◈ Development of a guide that predicts and reacts to a service’s issues
◈ Increased productivity
◈ Improvement management of resourced
◈ Risk management that minimizes or prevents service disruption
◈ A stable development environment that isn’t rigid, allowing for flexibility
◈ Better alignment across IT and other business departments


Considerations for ITIL certification



Industry experts as well as those certified in ITIL often agree that certification behooves both the individual and the company.

◈ 76% of those surveyed said that intermediate and advanced certifications made them more marketable, and nearly 59% said that they were better able to compete with an intermediate-level ITIL certification.

◈ 70% reported developing new knowledge and expertise. (This is significant because a common complaint of ITIL certification maintains that new knowledge acquisition is rare.)

◈ 55% felt they had improved their overall effectiveness on the job, and 47% reported that their employees improved efficiency in cost and time. (This indicates that an ITIL-certified employee may have a larger impact on colleagues and teams.)

◈ 23.5% felt that their knowledge helped employees improve their overall risk management. (This is surprisingly low, especially when many proponents of ITIL say that certification can help mitigate risk.)

Large, global companies can often more easily justify the cost of ITIL certifications for a number of employees. In such companies, it’s common for any IT professional, from sysadmins to project managers to CIOs, to obtain some level of ITIL certification. These same companies often also have dedicated ITIL coaches and mentors.

Small- and medium-sized businesses (SMBs), on the other hand, often have a hard time justifying the cost of fully certifying and implementing ITIL. But experts say these SMBs may want to consider the opposite: a failed IT project is often much more disastrous to your bottom line than the proactive approach of ITIL certification.

It may never be a complete guarantee that an ITIL certification is worth the investment, both for you and your company. With anything, you’ll often get out of the process exactly what you put into it. But, because ITIL builds on previous experience, you can try it out with entry-level certifications before fully committing to the long-term promise of ITIL Mastery.

Tuesday, 20 November 2018

Measuring Project Performance

It’s happened to nearly every project manager sometime in their career. They’re given the requirement to provide detailed performance reporting on a project and end up spending most of their time entering hours worked into work packages in Microsoft Project and estimating percent complete on these packages – on a daily basis. Whether the requirement for that level of reporting was real or perceived, the project manager finds that he’s unable to manage the day to day activities of his project because he’s too busy trying to measure the project’s performance.

Measuring Project Performance, Project Performance Study Materials

When a successful company invests time, money, and other resources in a project, its primary concern is always what it is getting in return for its investment. It is the responsibility of the project manager to ensure these projects stay on schedule and within their approved budget. Performance measurement provides the project manager with visibility to make sure he is operating within the approved time and cost constraints and that the project is performing according to plan. It also alerts management if a project begins to run over budget or behind schedule so actions can quickly be taken to get the project back on track.

As the Project Management Office (PMO) manager it is your responsibility to ensure that project performance is being captured and reported. It is also your responsibility to ensure that the level of reporting is achievable and doesn’t unnecessarily overburden or distract the project managers.

Your PMO should define the size of the work packages in your work breakdown structure (WBS). There are two typical standards; 4 to 40 hours and 8 to 80 hours. You should decide which size best fits your organization based on typical project size and level of management detail. I personally prefer the 4 to 40 as a work package cannot exceed the work of one person over a week.

Additionally your PMO should have a standard for applying credit for work performed. There are three common approaches to this. One rule is to apply a percent complete to work packages; however, this is somewhat subjective and leads to percent completes of 99.5, then 99.6, then 99.7 – we’ve all either been in this situation or seen it. A second rule is only giving credit when 100% of the work is completed on a work package, this is called the 0/100. The work package receives no credit even if it’s 3/4 complete. This solves the problem with the previous rule; however, it leads to less accuracy when performing earned value calculations. The third option is to give 50% credit when work on a work package is started and 100% when the work is completed. This is the rule I typically follow as it gives credit for earned value management and is easy to apply in the field.

Next, you should determine what earned value metrics you want to track and present to management. Although you can easily calculate most all earned value metrics (i.e. PV, EV, AC, SV, CV, SPI, CPI, EAC, ETC, etc) you don’t necessarily need to track all these values and you definitely don’t want to present them all to management. Management just needs a quick view of the project’s performance using only some of these values and would be overwhelmed if they had a complete list. For most projects I track the Schedule Variance (SV), Cost Variance (CV), Schedule Performance Index (SPI) and Cost Performance Index (CPI). These four values provide a reliable measurement of the project’s performance.

Schedule Variance (SV): If SV is zero, then the project is perfectly on schedule. If SV is greater than zero, the project is earning more value than planned thus it’s ahead of schedule. If SV is less than zero, the project is earning less value than planned thus it’s behind schedule.

Cost Variance (CV): If CV is zero, then the project is perfectly on budget. If CV is greater than zero, the project is earning more value than planned thus it’s under budget. If CV is less than zero, the project is earning less value than planned thus it’s over budget.

Schedule Performance Index (SPI): If SPI is one, then the project is perfectly on schedule. If SPI is less than 1 then the project is behind schedule. If SPI is greater than one then the project is ahead of schedule. A well performing project should have its SPI as close to one as possible.

Cost Performance Index (CPI): If CPI is one, then the project is perfectly on budget. If CPI is less than 1 then the project is over budget. If CPI is greater than one then the project is under budget. A well performing project should have its SPI as close to one as possible.

You should set thresholds for these values at which their status will change to an alert. For example, if the SPI falls below 0.9 then the project’s schedule should change to a yellow status. If the SPI falls further and dips below 0.8 then the project’s schedule should change to a red status. Additional earned value calculations can be performed if there is a problem with the project’s cost or schedule – this will give the project manager a better understanding of the problem and determining a path for correction.

Measuring project performance is an important part of project and program management. It allows the PMO and project manager to identify cost and schedule problems early and take steps for remediation quickly. It starts with setting the standards for the size of work packages, applying credit for work performed, and which earned value metrics to track, which should be included in the project’s Cost Management Plan. Measuring project performance provides the organization with a clear picture of the health of its projects and can instill confidence in the project teams. Additionally, these performance measures can help the PMO establish continuous improvement initiatives in areas where projects commonly perform at lower levels. The usefulness of measuring project performance is evident and as long as organizations do not become overwhelmed with them, these measures will remain important contributors to organizational success.

Saturday, 17 November 2018

How Much Training Is Needed to Create Good Black Belts?

One would think that with the levels of standardization and process efficiency we drive in Lean Six Sigma that there would be consensus on how much training a certified Black Belt should receive. Nothing could be further from the truth. In fact, despite the herculean efforts by the American Society of Quality (ASQ) and the International Society of Six Sigma Professionals (ISSSP), there is not even a consensus on what constitutes the “true” body of knowledge of Six Sigma; many consulting companies and corporations simply teach their versions. This leads to a huge divergence in what Black Belt certification means. Most hiring managers are left to look at the applicant’s pedigree to assess qualifications.

Six Sigma Study Materials, Six Sigma Certification, Six Sigma Black Belts, Six Sigma Live

Part of this confusion is historical. When companies in the United States were first adopting Lean and Six Sigma in the early 1980s, the standards for certification were incredibly high. At Texas Instruments in 1992, for example, candidates were expected to attend approximately 1,000 hours of training and complete more than 30 projects before they were eligible to sit for certification (patterned after a thesis defense). Later, as Six Sigma became more mainstream, the requirements became less stringent. At GE in 1997, for example, training was a standard four weeks (160 hours) and candidates were expected to complete two projects, which were vetted by their businesses. This trend has continued and, today, many programs are one or two part-time weeks and candidates then take an exam. In the early days, significant effort was made to differentiate Lean and Six Sigma from the status quo approaches to quality and the programs were technically rigorous. Today the emphasis is more on balance and accessibility. Unfortunately, this means that all Black Belts are not equally qualified for all roles.

Another reason for the diversity is the demands of the industries we have extended Lean Six Sigma to cover. In engineering-intensive product-focused industries (e.g., aerospace and automotive), the focus of Lean and Six Sigma was focused principally on the analytical and reliability side of Six Sigma. The teams generally had solid engineering and scientific backgrounds so demanding that Black Belts master experimental design and reliability statistics was not a challenge. But today, Lean and Six Sigma are found in nearly all industries and the quality needs of these industries are broader than the products they create. In the service industries, by contrast, the focus tends to be on people skills and descriptive statistics. In these industries the solution to problems is not nearly as difficult as is the defining of these problems clearly so that there is an urgency for creating solutions. Even in companies were a blended approach is favored (e.g., GE), the Six Sigma body of knowledge still remains specific to the industry and application.

Still another reason for the apparent diversity is the leadership of the various deployments. Everyone has his or her own intrinsic biases and these color how we choose to manage our deployments. Maybe it was what you were taught, the business’ needs as you see them or even a sense of unrealistic expectation (“I had to learn to compute ANOVA results by hand so everyone else should, too!”). No matter the source, these biases influence what we choose to emphasize and downplay, and this drives choices about which tools are important and in what order tollgate deliverables are to be completed.

The diversity in Black Belt knowledge is far from accidental. This means that basing your training content off of that used at another company or in another industry is very likely to fail. There aren’t universal standards because each company’s program must serve its customers, deliver its products or must participate in its unique regulatory environment. Lean and Six Sigma are not academic disciplines, they are pragmatic business approaches and as such must be unique to the businesses they serve. Success demands a balance of technical tools and applications with practical hands on application of these tools in real world scenarios. This is, after all, why we call them Black Belts and not process engineers. If you shortchange either the level of rigor or the level of practical application, your Black Belts will struggle. If, on the other hand, you over-emphasize either of these, your Black Belts will also struggle. The key is balance.

Balance is achieved by knowing your company and its needs so start with the strategy. Who are your customers? How do your customers make money and how does the product or service you provide help them achieve that goal? What are your long-term and short-term improvement goals and aspirations? If you discover that your customers want only cost and cycle time improvements, teaching modeling, DFSS and maybe even elements of DMAIC are a waste. If on the other hand, your customers expect innovation and extreme reliability, you cannot skip these topics. It’s all a matter of where you are in the quality journey and what is critical today. (Remember, it’s a journey not a destination.)

Once you have a plan, then consider who you will train. Six Sigma requires a certain level of mathematical sophistication and while everyone can master the concepts, some are better prepared than others. Those whose education has focused on the more concrete applications of mathematics (e.g., accounting or engineering) will require more time to master modeling than those whose education was more theory-based (e.g., physical science or economics). And those whose education did not demand mastery of higher mathematics (e.g., liberal arts and business) will require still more time. It’s not a matter of if your candidates can become good Black Belts but rather how much you must invest to get them there.

Many people make the mistake of “dumbing down” quality principles to match the current capabilities of their audience; this is a recipe for failure. Teams applying Lean and Six Sigma in transactional, non-engineering-intense disciplines need more training and coaching – not less. You can assume fewer things about their preparation but the problems they will encounter as they apply their art are no simpler so don’t handicap them with Lean Six Sigma “light.” It is also important to understand the personality profiles of your candidates. Certain people are more comfortable with inquiry whereas others must be coached not to jump to solutions. Everyone can learn Six Sigma but not in the same amount of time or in the same manner.

Finally, remember that the moniker “Black Belt” was purposefully chosen to distinguish practitioners of Six Sigma from quality engineers or industrial engineers. Someone can become an engineer through rigorous study and mastery of a body of knowledge without ever actually applying this learning to real-world problems. Not so with a Black Belt. To become a Black Belt, one must demonstrate a practical mastery of the art. In fact, most experts in Lean and Six Sigma consider the practical application more important than mastery of the body of knowledge. Lean Six Sigma is not an academic discipline and delivering results always trumps expert knowledge.

Maxwell Gladwell argues in his book Outliers that to truly master a subject, one must devote more than 10,000 hours to the field. This is probably true for Lean Masters and Six Sigma Master Black Belts. For ordinary project managers and Black Belts, I have found that less time is required to become practically competent, but the study and application should still be significant. Reasonable training on the Lean Six Sigma body of knowledge for the average candidate requires 100-160 hours plus an additional 40-100 hours of hands on coaching in the practical application of these tools and concepts. Add to that the independent application of Lean Six Sigma in two or more projects (~250 man each) and 1,000 hours (six months of full-time employment) is not unreasonable. When we short change our Black Belt candidates on training, mentoring (especially mentoring) or practical experience we should not be surprised when they struggle.

Most companies rush the process, perhaps with the aid and advice of well-meaning consultants who assume any shortcomings in training will be made up in mentoring. And then the companies expect miracles. To get the full effect of continuous improvement you must be in the game for the long-haul. Invest time in developing your team and great things will come.

Keeping Up with Change: A Three Dimensional View

Change happens every day. In today’s business world, it is the only thing that is consistent. But why change? And why are some people better at it than others? And in an environment where everything is changing, why is it so difficult for some companies to change?

Six Sigma Certification, Six Sigma Guides, Six Sigma Tutorial and Materials

To answer these questions, it is important to consider several factors that are necessary in order to successfully implement change within an organization. These factors fall under three dimensions:

1. The reason or cause of change
2. The effects of change
3. The business and organizational environments for implementing change.

By considering all three dimensions, practitioners more effectively can understand the scope of change in its entirety.

Why Change?


In the 1950s and ’60s, large companies developed business plans for the next one, three, five and, in some cases, 10 years. Today, most companies do not or cannot plan beyond 12 months. Advancements in technology have made an increasing number of resources available to all companies, large and small, and they have in turn opened up new markets around the globe. Because change is so prevalent, long-term plans may become outdated and possibly obsolete within months. Business plans must be reviewed, updated and revised quarterly.

Factors of Change


Change involves many components. Some, such as customers or competitors, initiate or are the cause of change. In other cases there are things that affect the implementation of change, such as processes and motivation. In still other cases, the environment contains elements that can promote or inhibit the success of change. The factors that follow will be discussed in terms of the three dimensions of change: reason or cause; effects or influences; and the environment.

1st Dimension: Reasons for Change


While there can be any number of reasons for change, there are three common causes: industry, customers and competition.

Industry — From time to time, every industry initiates change for any number of reasons, including standardization, new technology, quality or availability. For example, some industries have a governing board that sets forth standards that all competing companies within that industry must adhere to. In other cases, governments can regulate quality or availability of products or services. Industries also set the boundaries in which a company is trying to excel. Each industry has its own character in terms of business execution style, rate of change, application of technology and growth. This affects how a company implements change by guiding or favoring certain types of change.

Customers — The end customer is often a cause of change. Customer demands are monitored by a company’s customer service and business development department. If demands are widely held, the company may be forced to make changes to accommodate those demands, whether they are changes to the existing product or developing something new. Often the customer has a need, but may not know what will satisfy this need.

The business and social culture of the customer also influences change. Different customers may have different values or priorities, which can vary the level of formality, rapid response, quality, price and reliability they expect.

Competitors — Competition is a major instigator of change. If a competing company introduces a new product or adds new technology to an existing product and customers decide that there is value to the change, often all companies in the industry will be affected by the introduction. It might cause new development of a competing product or integration of the new technology. In either case, the primary reason for changing is to keep up with the competition.

2nd Dimension: Influences of Change


The second dimension looks at the organization where change will take place. Characteristics of the organization such as attitudes, work ethic and processes have a direct influence on the successful implementation of change.

Organization — Within an organization, the chemistry of the collective unit reflects an attitude toward change. In some cases it might be open to change. In other cases the attitude might be one of antagonism, denial, reluctant acceptance, skepticism or hopeful acceptance. This attitude can be the result of many influences, including age, industry and prior history.

Attitude also can be guided by perception within the organization. If the change is viewed as positive, the attitude can be quite favorable. But if the change is perceived to be negative, the attitude of the organization may become a significant obstacle during implementation. One example of the influence of attitude might occur if management proposes a change that appears inconsistent with the company’s strategic vision. The perceived conflict in objectives may bias the initial attitude. If an explanation or rationale is not given showing how the change relates to corporate strategy, the negative attitude may continue and grow into opposition.

In addition to the chemistry and attitude of an organization, work ethic can have a significant impact on change. If the work ethic is proactive, change will be embraced and incorporated almost immediately. If the work ethic is more reactive, there is less of a chance that change will be fully implemented. Typically a reactive environment is one where an organization is fighting fires. Only if someone with authority steps up and makes a difficult priority call will effort to incorporate change take precedence over daily efforts.

Process — One of the most important factors influencing the implementation of a change within an organization is process. What are the current behaviors of the organization? Management’s behavior in terms of priorities, decision making styles and responsiveness can influence the organization undergoing change as well as those that interact with that organization. Most changes in the organization are initiated by management. Those in the organization that are impacted by change look to see if:

◈ The change to be implemented is consistent with stated priorities.
◈ Decisions by management reflect those priorities.
◈ Management is responsive to questions that arise during the implementation of the change.

If at any time daily operations or a crisis takes precedence over the change, the organization’s perception of the change may turn more negative as a result.

For organizations that develop or manufacture products, any existing development processes that have been introduced as a result of Six Sigma, Lean, CMMI or other internal processes may impact the implementation of change. Most development processes are designed for repeatability and standardization. By definition, change is inconsistent with these. That does not mean that change is necessarily in conflict with process, but care must be taken so that any change introduced is in a structured, documented and repeatable manner. On the other hand, the change must not be bogged down in existing processes or debates. Any delay in implementing change as a result of process can result in a negative perception of the intended change, the process or both.

3rd Dimension: Environment


The environment where change is targeted will have a huge impact on its acceptance or rejection. The motivation for change within the environment and the culture in which the change will take place both play a role.

Motivation — Why is the organization or management interested in making the change? The goal of all change is to strengthen the organization. But the reason for change could be the result of some previous failure. It could also be to improve an area that is currently performing only at an “adequate” level. Or the change could be part of an area that is new to the organization. How is the motivation for change perceived by the organization in each of these cases?

There often are two distinct motivations associated with a proposed change. One is the primary motivation being marketed (internally or externally) with the change. A second motivation is the perceived rationale for the change. This motivation may not be explicitly stated or marketed. It may start at the grassroots worker level, and can be positive or negative. The point is that it may coexist with the stated motivation and in some cases, run contrary to the stated motivation.

Culture — Culture in a work environment relates to the socio-environmental influences. These influences reflect how the organization executes its daily tasks, everything from communication to social networks to management style. Culture is multifaceted and complex. Some examples follow:

◈ Management styles: The style of management used in an organization can have a huge impact on change. A supervisor who is a leader will be more successful than one who is a manager. Leaders know and understand the importance of implementing change and their role in making it happen. But leaders are rare in most organizations; managers make up the overwhelming majority of supervisors. While autocratic managers can be just as successful as participatory manager, it is the latter that will have significantly more buy-in from the employees. The manager who is more “hands-on” will be successful implementing change.

◈ Team, clique or individual work relationships: Today, the team approach is widely used. However, while some organizations profess a team approach, actual implementation may not reflect that approach. In some instances cliques form; these may be divided into groups of “doers” and “non-doers” or “watchers.” Or, the team may be nothing more than a collection of individuals, each member of the team working independently for the greater cause of the team.

◈ Open or closed environments: An open work environment describes a situation where there usually is high turnover among employees. But it might also describe an environment where there is continual growth and learning. A closed environment has minimal competition (usually contract or sole-source business) and is stable. The business may involve little change or is moderately slow to change.

There are many factors that contribute to the culture of an organization. Some are derived from the industry, service, product and size of the organization. The three examples here are representative of some of the aspects that should be taken into account when considering the environment intended for change.

Evaluate the Situation Before Making Change


While change can be difficult, it represents an integral part of today’s business cycle. Businesses are required to change at an incredible rate in order to compete and grow. Unfortunately, in many cases, organizations propose and implement change solely as an action to get from Point A to Point B.

To ensure successful implementation, any change should be evaluated and adapted to address the unique business environment of the organization. The change agents must consider the three dimensions of change, the reason, its influences and the environment.

Thursday, 15 November 2018

Back to Basics – ITIL Change Management Process

ITIL Tutorial and Material, ITIL Guides, ITIL Study Material, ITIL Certification

Digital transformation is a high priority activity for most IT leaders now. Businesses undergo similar transitions on a regular basis that differ in risk and impact. Seamless operation is a gift for any business to improve efficiency. Therefore, it is important to streamline this process to ensure minimal disruption or downtime. The ITIL change management process is a precursor to release management and this includes detailed assessment & planning before the change is actually released.

Objectives


◈ Reduce risk and impact
◈ Retain current working state
◈ Streamline communication and approvals
◈ Effective change planning
◈ Reduce incidents due to change execution

Examples – Windows patch, new software installation, changes to network infrastructure components, changes to ERP application

Change Management process flow


ITIL Change management process follows different stages that include every change detail. Following is the change management process flow

Request for Change


The first step is to request for a change with valid justifications. A Change record is created in one of the following scenarios

◈ Incident causes a new change
◈ A known problem leads to a change
◈ End user requests a new change
◈ Change manager creates a change as result of an ongoing maintenance

Request for Change (RFC) proposal contains following information along with necessary details

ITIL Tutorial and Material, ITIL Guides, ITIL Study Material, ITIL Certification

Change evaluation and planning


Change assessment committee evaluates submitted RFC and suggests necessary changes. This is followed by Change planning that follows a standard procedure such as

◈ Prioritizing a change – Prioritize change request and determine change type depending on risk and impact
◈ Scheduling a change – Schedule the change based on release window. Decide on the planned start date and end date
◈ Roll out plan – Implementation activities and approach
◈ Back out plan – Back out activities in case of any failure

Change approvals


Effective communication is the key to managing approvals on time. Automate approval process to reduce manual effort and save time. For example, major change requires CAB approval as well as management’s whereas standard changes are pre-approved and do not require any approval.

Change implementation & review


Release management takes care of the actual deployment. It includes build plan, test plan and batching. Change review happens post implementation to determine whether it’s a success. Review of completed changes helps in revisiting and modifying existing change management process if necessary.

Types of changes


Let us look at different types of changes and some of the common examples for each change type.

Major change 


Major changes are high impact and high risk items that might affect production systems. This requires CAB approval as well as management approval. This has a huge impact on ongoing business operations and also has financial implications. Therefore, RFC contains a detailed proposal on cost-benefit, risk-impact analysis.

Examples – migration from one datacenter to another; replacing an existing enterprise solution, ERP.

Standard change 


Standard changes are usually pre-approved changes and have low impact & low risk. These changes occur in a regular interval and follow the standard template. CAB approval is not required as these changes are evaluated and approved initially.

Examples – OS upgrade, deploying patch, setting up an user account etc.

Minor change


Minor changes are generally normal changes that do not have a major impact and are less risky to execute. These are non-trivial changes that undergo every stage of change lifecycle including CAB approval. Eventually, minor changes are converted to standard changes in future.

Examples – application performance improvement, website changes.

Emergency change


Emergency changes are unexpected interruptions that need to be fixed as quick as possible. This does not follow the conventional workflow whereas retrospective RFC is created post implementation. Emergency CAB (ECAB) is responsible to manage approvals. Review is completed later to avoid potential infrastructure risks in future and detailed documentation is done post implementation.

Examples – security fix, server outage.

Tuesday, 13 November 2018

5 Advantages of Using ITSM Software

ITSM Guides, ITIL Guides, ITIL Tutorial and Material, ITIL Study Materials

You know that using IT service management has been a huge advantage for your business, but have you given your IT department the proper tools to support the framework? There are plenty of advantages to using ITSM software—here are 5 of the most important.

5. Standardization and Integration


You know that ITSM in general is supposed to help you standardize your IT procedures across departments and divisions. In a lot of ways, using software specifically designed to support those functions is a logical extension of an ITSM framework. It’s always easier to do a job when you have the right tools at your fingertips—and ITSM tools like workflow management software help your IT staff do their jobs. Not only that, but these software solutions can also work across an organization so the benefits, like streamlining processes, can be realized in other parts of your company too.

4. Improved ROI


You’ve invested a lot in an IT service management framework so it really needs to pay off. ITSM can improve a business’s ROI—that’s no secret. But one of the best ways to ensure the return on your investment in ITSM is to employ software specifically designed for the job. IT professionals know what they need to do, but they also need the right tools to get it done. As an added bonus, software solutions will be implemented in every department of a business to ensure everything is consistent, standardized, and integrated. That means that when you employ an ITSM framework along with a software solution, it won’t just be the IT department that benefits—and that translates into a better ROI. In addition to that, many ITSM software solutions are suites of programs, which means that you’re getting not just one tool, but a whole set of them. Each tool can help your company with a different task, and these tools are designed to work together seamlessly.

3. Higher Efficiency


IT professionals are good at what they do, but ask any of them and they’ll say that the right tools make their lives easier. Why make the job harder by not offering them software that can help them better manage workflows, search through data and reports in short order, and keep track of incidents? Program capabilities also allow teams to look at their workflow processes in more detail, which in turn can point to the places where procedures could be simplified. Workflow management software may even allow you to automate some steps of a procedure—which means less time and effort, and a smaller margin of error.

2. Visualization


ITSM Guides, ITIL Guides, ITIL Tutorial and Material, ITIL Study Materials
If you want to know what your workflow process looks like, you don’t need to scribble it all out on paper; ITSM software can do that for you. By allowing you and your employees to visualize workflows quickly and easily, these programs can make it very obvious where a process can be simplified—by moving steps around, by eliminating unnecessary ones, or even by automating them. ITSM software can also help you run cost-benefit analyses quickly and easily, which means you spend less time guessing if the changes to procedures will save you time and money.

1. Reduced Costs


Perhaps most importantly, ITSM software can help your business reduce costs. The efficient delivery of services helps your employees save time and money, and the ability to visually review your workflow and determine what changes make sense allows you to make adjustments to processes and procedures that will save money. ITSM software might seem like a big investment upfront, but the benefits far outweigh the costs.

Saturday, 10 November 2018

Catalyzing Change: A Turnaround Success

Working conditions and poor safety records are usually coupled with weak performance in other areas. In this case; not only did the company have poor employee morale, but they also had performance in the bottom quartile relative to similar organizations with respect to:

Six Sigma Tutorial and Materials, Six Sigma Guides, Six Sigma Study Materials

◈ Production cost
◈ Quality
◈ Environmental compliance
◈ Worker injuries

Add to this the fact that many customers of this enterprise were automotive Tier 1 suppliers and they had already been short-shipped numerous times. There were many hungry competitors that could fill the void; especially as excess capacity existed in the market and price-cutting abounded.

A wholesale change was desperately required and a new senior manager was appointed. Not wanting a “band-aid” approach, he knew that he needed to enlist the brains….and more importantly, the hearts of his new team. Although occupational health and safety laws were clearly violated, this disruptive event was the catalyst to address other underlying problems such as communication, alignment, teamwork, productivity, customer focus, training and competitiveness. The manager also wanted to induce change in a way that meant there was a new way of working…..motivated employees that came in to work each day with a mindset to improve their processes, gain new skills and share their knowledge.

The first course of action was for “management” to purge out its old ways (and some senior managers) and simplify the expectations for all employees as an immutable foundation for the tough path forward. To keep it simple, meant it was easy to remember and articulate. All employees were expected to “Live the Values & Deliver Results.” The respect for both personal dignity and safety were two of the fundamental values that were non-negotiable. Managers took every opportunity to repeat this message; one-on-one with employees, midnight shift meetings or larger sessions.

The following table shows the key processes used. Brief descriptions of some of the systems and the associated metrics are presented later in the article.

Figure 1: Major Reinvention Programs

Six Sigma Tutorial and Materials, Six Sigma Guides, Six Sigma Study Materials

The Approach


Given the dire situation, a change management process was clearly required. A haphazard attack on the many issues would have probably exacerbated the problem. John P. Kotter’s Eight-Stage Process of Creating Changewas used as the guide to induce the re-invention of the team. The first stage of establishing a sense of urgency was already in place due to the threat of closure. The stages are:

1. Establishing a sense of urgency
2. Creating the guiding coalition
3. Developing a strategy and vision
4. Communicating the change vision
5. Empowering broad-based action
6. Generating short-term wins
7. Consolidating gains and producing more change
8. Anchoring new approaches in the culture

In addition to the change management process, an investment in critical thinking skills was absolutely required to give the team uniform tools to make efficient use of information; especially in the area of root cause analysis and rational decision making. Previous investigations, if done; were often shallow and dealt with “fire-fighting” tactics as opposed to true root cause analysis based on scientific process with validated findings. Therefore, all managers, supervisors and quality control staff were enrolled in a systematic course on problem solving and decision making given by Kepner-Tregoe.

With the above change process as the overall guide and enlightened critical thinking skills entrenched, listed below are the other key components to the successful real-world transformation that saved the company.

Safety Excellence: The organization had strong safety specialists that were already in the company – but who were greatly underutilized. They very quickly took charge of the legislated safety requirements and became true internal consultants who provided training and health and safety knowledge for the production team. The commitment of the whole leadership team to safety became abundantly clear as safety excellence was discussed at every business meeting and during everyone’s performance appraisal.

A process based of systematically observing work behaviors, charting the data gathered, involving employees in collecting the data and problem solving and providing feedback was the foundation for the behavior-based Job Safety Analysis. Thorough safety procedures were developed by the production operators with the strong support of the safety specialists. One of the first comprehensive processes was to complete a formal Risk Analysis of the unit operations based on the HAZOP process. HAZOP is a systematic and powerful process engineering tool used to identify hazardous deviations from an original or existing intent. Participants in these exercises typically included a seasoned production employee, a safety specialist, a professional engineer and an employee at an arm’s length to ensure objectivity. Further risk analyses were conducted whenever a significant change occurred – such as new equipment, equipment modification or new chemical agent.

Figure 2: Lost Time Accidents

Six Sigma Tutorial and Materials, Six Sigma Guides, Six Sigma Study Materials

As a result of these and other efforts listed below, lost time accidents dropped dramatically and reached two million man-hours without a lost time event. In other terms, there were no accidents for over 7 years (see Figure 2). Awards and citations were received from all levels of government. Most rewarding was the request from the government to act as a mentor to poorer performing companies; a huge change for a company that had received 21 orders and one of the worst accident ratings in its peer group.

Cost Reduction: The production cost of the site was one of the highest in the peer group of similar global units. Obviously, there were inefficiencies in every area: high labor input, bloated inventories, slow changeovers, unacceptable off-spec production, excessive overhead and long lead times. The new manager did not want to shoot from the hip on bits and pieces of the operation in Kaizen shot-gun frenzy. Rather, he wanted to create a sustainable and agile operation and thus chose to follow the principles of Lean manufacturing. Here are some of the highlights:

1. Structure: The organizational structure was flattened and all employees were given the authority to make decisions at anytime provided they consulted with their immediate co-workers and stayed within three boundaries. These boundaries (or risk guidelines) pertained to personal injury, environmental impact and financial impact of the decision. Decisions with sizable impact were subjected to the more thorough decision making process based on the Kepner-Tregoe technique.

2. Knowledge Sharing: Systems were put in place which allowed the sharing of information regarding defects, tests, investigations, equipment malfunctions, customer feedback and other essential experiences. A key measure to improve the efficiency of a 4 crew rotation was this open and efficient transfer of knowledge. This was done in a variety of methods which included concise learning from accident investigations, quality issues, equipment troubleshooting, new product introduction, etc. Most of the newly gained knowledge was stored electronically in a shared file and reviewed by all team members. This incremental approach to knowledge sharing became a powerful tool as it formed the basis for future training, new product development and improved equipment reliability. Over the course of the first year of the journey, the production unit went from fighting fires to obtaining the know-how of why things happened. But the real power came at the next stage, from the scientifically based “know-why”! Once a team knows why things work, the potential of what can be achieved is spectacular.

3. Customer Focus: The needs of the customer and the relevancy to future progress were addressed by training operators on how the products were used by different customers. Supporting this were customer events that put the manufacturing team in direct contact with customers. These customer interactions were carefully planned during quality audits, new product introductions, customer complaints or client visits. Members of the sales staff were also encouraged to visit the production area at any time and explain the needs of the customers in a direct communicative style.

4. Operating Capability: Strength in problem solving, hypothesis development and testing were all encouraged. For example, changeovers between products meant shutdowns of between 6 and 48 hours. Within a year, changeover times were cut by 70%. In year one, there were only six products but after four years, there were more than 40 products, and there was less absolute changeover time in a given year than there was originally. This amazing improvement was achieved by production operators working with quality control technicians and maintenance staff who questioned old paradigms and attacked the former lack of agility with fervor. They created smart tools such as custom rigs, tool boards and on-line QC to permit efficient turnarounds.

5. Evolutionary Operation (EVOP): All production plants have three outputs: saleable product, off-spec product and information. This plant stored its daily log sheet of operating settings in a filing cabinet and nothing was really done with the data except for investigating customer complaints. Since the process had at least 10 adjustable parameters, how was one to know if the process was running anywhere near optimal? Through the use of a statistical approach known as EVOP (Evolutionary Operation), data was entered into a process which had a powerful statistical base coupled with EVOP know-how from a consultant and the process knowledge from senior operators. The net effect was to make tiny incremental daily changes to the parameters in a controlled fashion that ensured quality did not suffer while seeking the optimal process conditions. With this powerful tool, the line speed of the largest volume product increased by more than 15 percent. Using this tool repetitively, as raw materials changed or for new products, the overall productivity of the plant continued to increase year over year. Not only did this improve unit cost in the early years but it gave the plant an extra 25 percent capacity, saving a substantial capital investment for expansion in later years.

Figure 3: Unit Production Costs

Six Sigma Tutorial and Materials, Six Sigma Guides, Six Sigma Study Materials

With the combined effect of cost containment and a continuous zeal for improvement, unit production costs dropped 43 percent over the course of five years! It is vitally important to note that from a compensation perspective, the cost reduction was not done by slashing hourly rates, but rather by paying for performance which meant above average raises for hourly rates and handsome annual bonuses.

Communication: The Achilles heel to most companies is the ability to take strategy from a well articulated document to the real world of action. To ensure that all the programs were bundled together with synchronicity, the vehicle chosen was a carefully structured balanced scorecard.

Traditional “lagging” targets such as cost and volume were measured, but so were “leading” indicators such as training completion and other personal development actions. The Scorecard was updated monthly and posted throughout the building – and every employee could understand how their individual input was affecting the corporate results. Every three months, all employees were able to attend meetings where current scorecard results where reviewed, what obstacles laid ahead and what needed to be done to achieve the business strategy.

Two-way communication was encouraged at any time without the typical hierarchical barriers. All managers had frequent, attentive, concerned and truthful (FACT) discussions in any forum they saw fit for the circumstance. Consistency in purpose and personal accountability were essential for credibility.

Figure 4: First Pass Quality

Six Sigma Tutorial and Materials, Six Sigma Guides, Six Sigma Study Materials

Quality: At first, the notion of implementing Six Sigma was construed as a means to improve quality beyond the ISO 9000 standard. But it was soon learned that it is a system of management to build top performance, put the customer first and achieve sustainable business leadership. By concentrating on the fundamentals of Define, Measure, Analyze, Improve, Control (DMAIC), on-spec quality rates went from 88 percent to 99.5 percent. For those familiar with Six Sigma, this translates from 2.7 sigma to above 4 sigma. The same principles used for root-cause analysis for personal accidents were also applied to whenever unacceptable product was produced. One variation to the approach to project selection/ prioritization was the use economic value added rather then the traditional net present value. This was done to ensure the net worth of the organization was increasing rather than just the project return.

Figure 5: Environmental Performance

Six Sigma Tutorial and Materials, Six Sigma Guides, Six Sigma Study Materials

Environmental Performance: The principles of ISO14001 were adopted once the first six months of turmoil had settled. It was introduced in a stepwise fashion to ensure the organization was not overwhelmed. Evidence of progress was seen in the hazardous waste (RCRA) output. We were able to drop to a quarter of the original amount which meant a corresponding improvement in production yields. An example of change in perspective was the identification of each waste stream with its own SKU number and tracking all movement within the ERP system. This simple action gave a whole new meaning to waste – handling it like a raw material or finished product.

Raw materials transformed into useful product rather than waste is certainly a simple formula for success – benefiting both the planet and the bottom-line.

Tuesday, 6 November 2018

Differences between Six Sigma & PMP (Six Sigma Vs PMP)

Six Sigma Certifications, PMP Certifications, PMP Guides, PMP Learning, Six Sigma Study Material

SIX SIGMA


Six Sigma is a quality management methodology aimed at performance improvement by reducing the no of defect to 3.4 or few defects per million items produced and a subsequent increase in profits and decrease in costs. It mainly targets to remove the obstacles in a process which are resulting in defects.

PMP


Project Management Professional (PMP) is the one of the most significant Certification for project managers. It is an International Designation offered by Project Management Institute (PMI). PMP certified project managers are employed by organisations all over the world as they seek to improve the success rate of projects in all areas, by applying a standardized and evolving set of project management principles as contained in PMI's PMBOK Guide.

It contains over 42 processes which can be adopted for successful completion and implementation of the projects.

Where the difference lies?


The main difference between Project Management Professional (PMP) and Six Sigma lies in the Methodology.

PMP uses various project management principles and processes to improve the success rate of the projects. On the other hand, Six Sigma leverages statistics to identify the defects and remove those defects for improvement in quality of the process.

LEARNING

Under Six Sigma Certification, the learning is imparted with the main focus of reducing defects as much as possible in order to reduce time and improve quality as per the standards set by the Company whereas in PMP Certification, learning is imparted to the practitioners with the main focus on how to properly plan and execute projects in order to ensure a high success rate for the projects.

DESIRE
The desire for PMP certification generally arises in an individual himself in order to develop his competencies in the challenging world whereas the need and criteria for Six Sigma Certification is specified by the company to makes its employees more efficient and capable of performing in the organisation.
NATURE
Project Management Professional is broad in nature as compared to Six Sigma which is much more specific and conceptually broad in nature.
WORK-CYCLE
Most of the Black Belts after the certification have to work for minimum 12-24 months in full time employment but there is no such obligation for the Project Management Professionals. However PMP have to complete 60 PDU’s in next 3 years to maintain certification.
COST ESTIMATION
Average Cost Incurred in completion of Six sigma black belt is quite high as it ranges between 25000-50000 US $ whereas the estimated costs in certification of PMP is significantly low at just 1500-3000 US $.