What is PMBOK in Project Management?

Project Management, Project Management Study Material, Project Management Guides

Project Management has always been practiced informally, but began to emerge as a distinct profession in the mid-20th century. PMI published a manual entitled "A Guide to the Project Management Body of Knowledge (PMBOK® Guide)" to identify the recurring elements for project management process. The complete Project Management Body of Knowledge includes proven traditional practices that are widely applied, as well as innovative emerging practices for the profession with widespread consensus as to their value and usefulness.

History of PMBOK


◈ The first credential for PMI was the Project Management Professional (PMP), and the first certifications were awarded in 1984.

◈ 1969 - Birth of PMI - First Meeting is held in Atlanta, GA.

◈ 1984 - First PMP Exams are administered

◈ 1987 - March - "Project Management Body of Knowledge" is released - not hardcopy - sections A through H, 5-6 pages in each section.

◈ 1994 - August - New exposure draft of the "PMBOK Guide" is released - 64 pages. There are eight Knowledge Areas. (Integration Management is not included until the 1996 First edition.) Test is a six hour exam of 320 questions! (There are 40 questions for each of the eight Knowledge Areas. Each question has five multiple-choice answers.)

◈ 1996 - PMBOK Guide, First Edition is released - 176 Pages. Nine Knowledge Areas and 37 processes.

◈ 2000 - PMBOK Guide, 2000 Edition is released. (Second Edition) - 211 Pages, Nine Knowledge Areas and 39 processes.

◈ December 2004, - PMBOK Guide, Third Edition is released. 390 pages; 44 Processes; 592 ITTO. August 2005 - Test changes to be based on Third Edition, and test becomes much more difficult! (PMI lowers the passing score to 61% to accommodate the increased difficulty of the exam.)

◈ 2007 - PMBOK Guide earns the ANSI/ISO/IEC

◈ December 2008, - PMBOK Guide, Fourth Edition is released. 467 pages; 42 Processes; 517 ITTO. August 2009 - Test changes to be based on Fourth Edition.

◈ August 31, 2011 - 30% of the questions are changed to conform to the latest 2011 RDS (Role Delineation Study)

◈ December 2012, - PMBOK Guide, Fifth Edition is released. 589 pages; 47 Processes; 619 ITTO! August 2013 - Test changes to be based on Fifth Edition.

◈ January 11, 2016 - Test changes to conform to the latest 2015 RDS (Role Delineation Study)

What is a Project?


In project management, a project is a temporary endeavor undertaken to create a unique product, service or result.

A project is temporary in that it has a defined beginning and end in time, and therefore defined scope and resources. And a project is unique in that it is not a routine operation, but a specific set of operations designed to accomplish a singular goal. So a project team often includes people who don't usually work together - sometimes from different organizations and across multiple geographies.

The development of software for an improved business process, the construction of a building or bridge, the relief effort after a natural disaster, the expansion of sales into a new geographic market - all are projects. And all must be expertly managed to deliver the on-time, on-budget results, learning and integration that organizations need.

What is Project Management?


Project management is the discipline of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria. It is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements.

A project is a unique and transient endeavor undertaken to achieve planned objectives, which could be defined in terms of outputs, outcomes or benefits. A project is usually deemed to be a success if it achieves the objectives according to their acceptance criteria, within an agreed timescale and budget.

Management vs Project Management


A key factor that distinguishes project management from just 'management' is that it has this final deliverable and a finite timespan, unlike management which is an ongoing process. Because of this a project professional needs a wide range of skills; often technical skills, and certainly people management skills and good business awareness.

Why PMBOK?


PMBOK has been used as the standard by which PMP Certification is obtained. PMP Certification is based upon a survey of many companies' best practices. The advantages of using PMP Certified Project Managers and Team members is that resources have already been trained. PMBOK is valuable for both companies and employees. PMBOK is valuable for many reasons. Here are three:

◈ The first reason PMBOK is valuable is that it allows companies to standardize practices across departments. This means that the people in development manage projects in the same manner as those in distribution.

◈ Second, PMBOK can help project managers to work with a standardized system across companies. Someone working for company x who then moves onto company y can use the same practices.

◈ Third, PMBOK discusses what works. The methods documented within the project management community can assist those who are uncertain of how to undertake risk management. PMBOK also discusses what doesn't work. This prevents failure of projects.

Finally, project managers who are familiar with PMBOK standards can custom tailor their project management process to best fit their company's needs. There's an old saying, "To break the rules, first you have to know the rules." When project managers invest time into learning the rules, they also are investing time in learning how and where rules can be broken.

PMBOK Structure


Project management as a practice is rapidly growing and spreading worldwide, and is now seen globally as a recognized and strategic competency, a career path and a subject for training and education. The PMBOK framework consists of five process groups, ten knowledge areas and 47 project management (PM) processes. The knowledge areas group the PM processes by project management content.

The 5 PMBOK Process Groups


Initiating

The initiating process group involves the processes, activities, and skills needed to effectively define the beginning of a project. Setting all permits, authorizations, and initial work orders in place to secure an effective and logical progression of initial project activities sets the stage for subsequent success throughout all project phases. Setting clear phases for work to be completed, initializing teams, and having the budget in place before work begins are vital for a strong start to any project across industry.

Typically activities to be performed in the initiating group:

◈ According to PMI, the process of Initiating helps to set the vision of what is to be accomplished.
◈ This is where the project is formally authorized by the sponsor, initial scope defined, and stakeholders identified.
◈ Stakeholder identification is crucial here because correct identification (and subsequent management and control) of stakeholders can literally make or break the project.

We also need to mindful of the following points:

◈ This process group is performed so that projects and programs are not only sanctioned by a sponsoring entity, but also so that projects are aligned with the strategic objectives of the organization.
◈ Where this is not performed, projects may be started and carried out haphazardly, with no real stated goal or objective.
◈ It should also be noted that management chooses and authorizes the project manager in early this phase.
◈ It's crucial to authorize and establish the PM early as project managers often have accountability but little authority.

Planning

The Planning Process Group sets forth the processes needed to define the scope of the project, set strategic plans in place to maximize workflow, and begin to assemble priority lists and plan team needs. This process group also addresses a more narrow clarification of all project goals and expectations and puts in place the project infrastructure necessary to achieve those goals according to the timeline and budgetary constraints.

Typically activities to be performed in the planning group:

◈ A crucial element of planning is establishing the total scope of the project. While it may appear as though that was accomplished in initiating group, scope (along with risks, milestones, summary and budget) was defined there at a high level.

Project Management, Project Management Study Material, Project Management Guides

◈ In planning group, an iterative and more detailed planning process, called progressive elaboration, project documents are developed at a much more detailed level.

◈ In the PMBOK Guide, PMI defines twenty-four discrete processes that are involved in planning.

Executing

The executing process group involves managing teams effectively while orchestrating timeline expectations and reaching benchmark goals. Project managers utilizing this set of skills will demonstrate a high degree of organization and communication skills while addressing team concerns or other complex situations associated with getting the work done on time and within budget.

Here is the typically activities to be performed in this group:

◈ Project manager need to acquire and manage the development team and also cultivate it by performing team-building exercises.
◈ Project Management is not only managing communications but also managing the stakeholder engagement, ensuring project and product quality
◈ If procurement is involved - supporting the effort to contract with a vendor.

Note that:

In the Executing phase, most of the budget will be spent and the deliverables of the project will be produced. And it is likely here where we will begin to see stakeholder change requests. While the project team can implement approved changes, only the change control board can approve or reject these changes.

Monitoring and Controlling

Processing change orders, addressing on-going budget considerations, and mitigating unforeseen circumstances that may affect a team's ability to meet initial project expectations are all part of the core skills and competencies involved in the Monitoring Process Group. Seasoned managers keep the momentum moving forward and guard the project against stalling by actively monitoring progress and using foresight and quick response to address project challenges. While the other process groups occur sequentially, Monitoring and Controlling hover over the whole project and so, happen throughout the project and are not linear. What does it encompass? According to PMBOK GUIDE, these are "processes required to track, review and regulate the progress and performance of the project.

Typically activities to be performed in the monitoring and controlling group:

◈ Identify any areas in which changes to the plan are required
◈ Initiate the corresponding changes (The truth is, you can't assume you'll always stay on plan. In fact, it's likely as not that you won't).
◈ In this group, you often need to get back on track, where you compare plan to actual, measure variance and take corrective action.

Closing

The biggest challenge of this process group is to bring the project to a successful close which means completing it on time and within the budget allotted. The bottom line is that while these process groups are not necessarily easy to implement, not doing so means the team may never realize the full benefits of their highly strategic projects.

Typically activities to be performed in the monitoring and closing group:

◈ Not only do you formally close the project but you also get sign-off and acceptance from the customer.
◈ The project manager should formally close the project by archiving records, holding a lessons learned session, making final payments, closing contracts and celebrating and releasing the team.
◈ Lessons learned along with other historical information should be centrally archived to be used as input to future projects to prevent reinventing the wheel.

The 10 Knowledge Areas of Project Management


Integration - This is covered first in the PMBOK Guide, but it's about bringing together everything you know so that you are managing your project holistically and not in individual process chunks.

Scope - It is the way to define what your project will deliver. Scope management is all about making sure that everyone is clear about what the project is for and what it includes. It covers collecting requirements and preparing the work breakdown structure.

Time - It relates to how you manage the time people are spending on their project tasks, and how long the project takes overall. This knowledge area helps you understand the activities in the project, the sequence of those activities, and how long they are going to take.

Cost - It is all about handling the project's finances. The big activity in this knowledge area is preparing your budget which includes working out how much each task is going to cost and then determining your project's overall budget forecast.

Quality - This area is where you'll learn about and set up the quality control and quality management activities on your project so that you can be confident the result will meet your customers' expectations.

Procurement - It supports all your procurement and supplier work from planning what you need to buy, to going through the tendering and purchasing process to managing the work of the supplier and closing the contract when the project is finished.

Human resources - First, you have to understand what resources you need to be able to complete your project, then you put your team together. After that, it's all about managing the people on the team including giving them extra skills to do their jobs, if they need it

Communications - Given that a project manager's job is often said to be about 80% communication, in there, the PM writes communications plan for the project and monitor all the incoming and outgoing communications.

Risk management - It involves identifying risks and understanding how to assess risks on your project, that includes how you perform quantitative and qualitative risk assessments. Risk management isn't a one-off activity, it covers controlling your project risks going forward through the project life cycle.

Stakeholder management - It is one of the most important group which takes you through the journey of identifying stakeholders, understanding their role and needs in the project and ensuring that you can deliver those. I think we'll see this area develop further in the next edition of the standard.

If you can grasp all these knowledge areas, you'll have everything you need to know as a project manager covered!

The 47 PMBOK Processes


Standardization of processes remains at the heart of all effective business models and plans. In project management, the PMBOK provides a way or transforming isolated processes into a complete, standardized, and collaborative effort. 47 process are classified under 5 different process groups, that associated with the corresponding knowledge areas in the following table:

Initiation Planning  Execution   Monitoring and Controlling  Closing
Project Charter Project Management Plan  Cost Management Plan  Project Status Report  Change Request  Lessons Learned 
Stakeholder Register Requirements Management Plan  Activity Cost Estimate  Deliverables Status  Change Log 
Scope Management Plan Cost Baseline  Change Request Earned Value Status Report
Requirements Documentation  Project Funding Requirements  Project Team Directory 
Requirements Traceability Matrix  Quality Management Plan  Team Performance Assessment 
Project Scope Statement  Process Quality Checklists Enterprise Environment Factors 
Scope Baseline  Product Quality Checklists  Procurement Agreement 
Schedule Management Plan  Quality Metrics  Issue Log 
Activity Attributes Process Management Plan 
Activity List  Human Resource Management Plan 
Milestone List  Communications Management Plan
Project Schedule Network Risk Management Plan
Activity Resource Requirements  Risk Register
Resource Breakdown Resource  Change Request
Activity Duration Estimates  Make-or-Buy Decisions 
Project Calendar  Procurement Management Plan 
Project Schedule  Procurement Statement of Work 
Schedule Baseline  Stakeholder Management Plan

Tuesday, 9 October 2018

The 7 principles, themes and processes of PRINCE2

Prince2 Principles, Prince2 Themes, Prince2 Processes, Process Study Material

Are you Agile or Prince?


Many today are supporters of agile project management methods such as Scrum or Kanban. PRINCE2 is more a representative of classic project planning - but there are also voices that follow the hybrid system: PRINCE2 for the clear structure and framework, Scrum for sprints within the project stages. So it makes sense to look at PRINCE2 (Projects in Controlled Environments) and its principles - here the overview of the 7 principles, the 7 topics and the 7 processes.

The 7 Principles - from Good Practice to Best Practice


The seven basic principles of PRINCE2 are the backbone of a project. They are used again and again. You can also ignore parts of it - but if you remove too many vertebrae from the backbone, the project can collapse.

- Ongoing justification. A project has to pay off. Invest, expenditure of time and resources must be constantly justified.

- Valuable experience. Project teams should learn from previous projects. Therefore, project journals should be available.

- Defined roles. Everyone needs to know what the other one is doing. It has to be clear who the decision maker is.

- Defined phases. Difficult tasks are better divided into manageable sections or project phases.

- Defined exceptions. In a well-running project hardly intervene. The project management is only informed if there is a problem or if it becomes apparent.

- Focused product. The result is a product and it should be well defined. The product properties determine the work, not the other way around.

- Customized project environment. PRINCE2 can be scaled and customized. Projects that adapt PRINCE2 to their needs are more successful than dogmatic PRINCE2 projects.

The 7 topics - from clue to certainty


The seven topics are something like the working dimensions of a project. For example, in each project, the organization wants to be defined, the quality or risk to be weighed. While perhaps the principles from above are still informal or self-evident in a project, at the latest the themes of a project should be transcribed. The topics can also be dealt with W-questions.

- Business Case. Compare with the ongoing justification. It's about turning an idea into a worthwhile business case.

- Organization. Compare with the defined roles. Here, the project manager defines all the roles and responsibilities of the participants.

- quality. Compare with the focused product. It is also about quality. To make sure that this is not too abstract, it is important to define and stick to it at the beginning of a project.

- Plans. With a plan you get to the destination. Plans focus on products, timeframes, costs, quality and benefits.

- Risks. This topic serves to anticipate, identify, evaluate and control events during a project. These are recorded in a risk log. Negative risks are referred to as threats and positive as opportunities.

- Changes. This topic is about editing change requests and issues that occur during the project. The idea is not to prevent changes, but to subject them to a standardized procedure.

- progress. The project progress must be constantly checked. The project manager checks where the team is relative to the plan. Escalations to the end of the project are part of the project progress.

The 7 processes - from planning to action


PRINCE2 is a process-oriented method. Anyone who has been scanning these lines with restless eyes and wondering: when will the action finally come - are now in their element! This is about the division of a project into process sections, and here the action is brought into a structured sequence. The project manager closely monitors the project phases and leads the team to a goal. In addition, the English terminology is mentioned here because the processes are occasionally provided with the specified project abbreviations.

- Prepare / Start Up (SU). Create a project mandate that answers logistical questions about the project. It explains the purpose of the project, who does it and how it is done. The project briefing results from the mandate, existing project diaries and discussions with the persons involved in the project. This phase should also discuss feasibility and gather all information for the next process.

- Initiate / Initiate a Project (IP). This phase is about recognizing what needs to be done to complete the project successfully. The project manager describes the project dimensions that need to be controlled, such as time, cost, quality, scope, benefit, or risk.

- Steering / Directing a Project (DP). This project dimension applies to the entire project. The five core activities are initiation, phase demarcation, ad hoc alignment / consulting, project completion.

- Controlling a Phase / Controlling a Stage (CS). Here the tasks of project manager and team manager are described. The project manager authorizes work packages that break down the project into manageable activities. He assigns these to the teams and their leaders and monitors progress and progress if necessary. At the same time, team leaders have these tasks: Coordinating the daily work and communication between the team members and the project manager.

- Managing the product / Managing Product Delivery (MP). Here the communication between team leader and project manager is controlled. The product delivery is divided into three sections: Accepting a work package, executing a work package and handing over a work package.

- Managing the phase transition / Managing Stage Boundaries (SB). The project manager and a steering committee review each phase. The panel decides whether the project should continue. The project manager meets with the team to record the learnings for the next phase. The main activities are: planning the next phase, updating the project plan and the business case, reporting the end of the phase or creating a change or exception.

- Closing / Closing a Project (CP). When is a project over? This banal question is not so easy to answer at the end of complex projects. This makes it all the more important to adhere to these guidelines: declare the project over, identify follow-up actions, complete the project diary and hand over the product.

This overview describes the framework conditions under which projects should take place. As always, a project is only as successful as the motivation and discipline of those involved. At the same time PRINCE2 offers enough flexibility - up to the use of agile methods - to lead projects to success. PRINCE2 brings the discipline to the project. It depends on the project manager to apply rules creatively.

Saturday, 6 October 2018

CSM vs PMI-ACP: Which Agile Certification is Right for You?

Those who go through the work to earn a professional certification enjoy a multitude of benefits. Earning a certification builds confidence, makes you more competitive in the job market, solidifies understanding of a discipline, and establishes credibility with your stakeholders. Considering the effort, money, and commitment required to get certified, those rewards are well-deserved.


That sizable investment also means that most people must be discriminating as to which certification to pursue. Few have enough time, money, and energy to get more than one certification in a field, so a question we often get is, “Which one do you recommend?”

This article explores two popular agile certifications: Certified ScrumMaster® (CSM), awarded by the Scrum Alliance, and the PMI Agile Certified Practitioner (PMI-ACP)®, awarded by Project Management Institute. Each certification and awarding organization offers different considerations that might go into choosing one over the other.

Highlighting the most salient “plusses” of each certification seems the best way to illustrate the value proposition for each certification. Of course, to highlight a benefit of one certification is not to say that it is unique to that certification. But to appreciate the benefits of each, it seems helpful to ask, “What does each certification say about you when your signature includes CSM or PMI-ACP?”

◈ PMI-ACP: You Understand Scrum and Other Agile Methods


Scrum is, by far, the most widely used agile approach, but it is not the only approach. The PMI-ACP addresses agile from a more holistic perspective and not specifically Scrum. When preparing for the ACP, it was helpful to understand about those other perspectives to see how agile principles are applied with different methods.

◈ CSM: You Have Learned and Worked with a Certified Scrum Trainer.


The biggest benefit of getting a CSM is that there is a very small, highly qualified number of individuals from whom you can receive your CSM training. Only Certified Scrum Trainers® (CSTs) can deliver a CSM course, and the qualifications for becoming a CST are extremely rigorous including vetting by Scrum Alliance peers in face-to-face interviews.CSTs all have considerable field and classroom with years of hands-on work in organizations with agile teams. Getting a CSM means you have learned from a Scrum professional who has deep knowledge about Scrum and has a lot of experience working with agile teams. That typically translates into hearty classroom examples of what agile looks like and how it works in the field when discussing concepts in class.

◈ PMI-ACP: You Have Agile Education and Project Experience


The experience requirements for the ACP are relatively strong. To apply for the PMI-ACP exam, you must have several thousand hours of experience working on projects. This experience includes general project experience, as well as project experience working on agile project teams or with agile methods and practices. Having a PMI-ACP means you have some context for understanding the various approaches to managing projects and you can speak to the benefits of agile and when it’s the right approach.The ACP also requires 21 hours of agile education and may be done either online or in-person. Those education hours may address agile philosophy, techniques, or principles, and there are no specific requirements for instructor qualifications, (unless it is an ACP prep course, in which the trainer must be ACP certified). So, in general the quality requirements for the agile education component of getting certified are more rigorous for the CSM.

◈ CSM: You Are a Member of Scrum Alliance.


Another benefit of a CSM is affiliation with Scrum Alliance. As a CSM, you are a member of an organization entirely dedicated to Scrum. There is, and always has been, no question that Scrum Alliance folks understand agile and that they are a leading resource pertaining to all things Scrum.This might not be as important if it weren’t contrasted with PMI, which has long been the keeper of the more traditional, plan-driven, “waterfall” approach to projects. In fact, one of the downsides of the PMI-ACP when it first came out was that many people disregarded it precisely because it was from PMI. That’s changing, however, and their evolving image reflects years of rebranding to put agile front and center in their publications and events. Nevertheless, some still see PMI as the one-stop shop for all things anti-agile. CSMs have never had that credibility gap as members of Scrum Alliance.

◈ PMI-ACP: You Passed A PMI Exam


The PMI-ACP exam process is more intensive than the CSM. For example, the CSM exam consists of a combination of multiple-choice and true/false questions and you must answer 24 out of 35 correctly to pass. There is no separate fee to take the test; it’s included in the cost of the class. It is taken online and you have two attempts to pass the test within 90 days of class. If you do not pass within two attempts and/or 90 days, you may take the test again for $25 for each successive attempt. So, the barrier to entry for the CSM as it relates to the test is relatively low.On the other hand, the PMI-ACP certification, like all PMI certifications, is earned after going through the notoriously rigorous PMI application and testing process. The PMI-ACP exam is not nearly as difficult as the PMP, but passing it is more difficult than the CSM exam. Even the application process, while considerably easier than it used to be, still requires pulling together details about project experience, contact info, etc.The PMI-ACP exam is a three-hour, 120-multiple-choice question exam taken at a testing site. If you do not pass, you must pay another, relatively substantial fee. So, considering the difficulty of the exam and the testing process, it’s more of an accomplishment from a testing standpoint than the CSM.

Of course, a test proves nothing other than you answered the minimum number of questions correctly to receive a passing score. A test doesn’t make anyone a better practitioner. But for most people, a PMI certification indicates that you have taken the certification seriously enough to make the investment to get through the process of passing one of their tests. PMI’s certification program is very well developed and has a long tradition, and there’s something to be said for that.

◈ CSM: You Have Attended a Course Using Agile Tools and Artifacts.


The courses for getting your CSM are rich with hands-on exercises and must be taught live, in person; there is no means of getting CSM certified through an online course. This speaks to Scrum Alliance’s quality program for its courses, and it benefits those with CSMs in that you will have had that classroom experience of working on an agile-like, co-located team and participated in Scrum activities and utilized Scrum tools to create Scrum artifacts.

◈ PMI-ACP: You Are Committed to Continued Professional Growth in Agile


Maintaining a PMI-ACP requires 30 hours of continuing education in agile within three years of passing the exam. There is a fee involved, as well, but it’s mostly about keeping your skills and knowledge sharp through training, reading, or some other learning activity.On the other hand, keeping your CSM only requires paying a Scrum Alliance membership fee two year after completing your CSM. Therefore, a CSM who got certified seven years ago can continue to use that designation as long as they continue to pay their fees – even if they haven’t participated in any agile professional growth since then. For that reason, the PMI-ACP sustains its certification value over time better than the CSM.

Something to keep in mind as you compare these two certifications is that both are scheduled to undergo changes in the coming months. Scrum Alliance is currently revising their entire certification program. At this point, many of the details are still unknown, but changes to the CSM may include things like being able to take a class online. It will continue to be an entry-level certification much like it is now. Other than that, we’ll have to wait and see.

What’s happening at PMI regarding the PMI-ACP is more certain. First, PMI has partnered with Agile Alliance to develop an Agile Practice Guide, coming out in September of this year (2018). This partnership clearly speaks to PMI’s intent to enhance its credibility in the agile world.

Also, the PMI-ACP exam will be updated in first quarter of 2018 to reflect the content in the new Guide. Given the history of PMI, their investment in putting agile at the forefront of their image, and the significant growth of that certification since it was first awarded in 2011, the PMI-ACP is likely to retain its value and continue to be a sought-after certification, both from professionals and the organizations that hire them.

So, the question as to which is better, CSM or PMI-ACP? There really isn’t a right answer. CSM after your name means you have learned about Scrum from a CST, who is a true, experienced, expert. You have participated in a class that utilized hands-on exercises so you have at least classroom experience with basic Scrum activities and artifacts. And you’re a member of the Scrum Alliance, an organization dedicated to helping professionals apply agile and Scrum practices, principles, and values to create healthy, happy work environments.

PMI-ACP after your name means you have 1000s of hours of project experience, some of which includes working with agile techniques and practices. You have passed a rigorous exam that took significant commitment of time, money, and effort to complete, and you understand the repertoire of agile methods, including Scrum. It also says that you either have or will be continuing to invest time, money, and effort to keep abreast of what’s happening in the field and to your knowledge and skills sharp.

Thursday, 4 October 2018

ITIL - Information Security Management

Information Security Management (ISM) ensures confidentiality, authenticity, non-repudiation, integrity, and availability of organization data and IT services. It also ensures reasonable use of organization’s information resources and appropriate management of information security risks.

Information Security Manager is the process owner of this process.

◈ Information security is considered to be met when

◈ Information is observed or disclosed on only authorized persons

◈ Information is complete, accurate and protected against unauthorized access (integrity)

◈ Information is available and usable when required, and the systems providing the information resist attack and recover from or prevent failures (availability)

◈ Business transaction as well information exchanges between enterprises, or with partners, can be trusted (authenticity and non-repudiation)

ISM Security Policy


It is required for ISM security policies cover all areas of security, be appropriate, meet the needs of business and should include the policies shown in the following diagram:

ITIL Tutorial and Material, ITIL Guides, ITIL Certifications, ITIL Learning

ISM Framework


ISM Process

The following diagram shows the entire process of Information Security Management (ISM):

ITIL Tutorial and Material, ITIL Guides, ITIL Certifications, ITIL Learning

Key elements in ISM Framework


ISM framework involves the following key elements

Control

The objective of Control element is to:

◈ Establish an organization structure to prepare, approve and implement the information security policy

◈ Allocate responsibilities

◈ Establish and control documentation

Plan

The purpose of this element is to devise and recommend the appropriate security measures, based on an understanding of the requirements of the organization.

Implement

This key element ensures that appropriate procedures, tools and controls are in place to underpin the security policy.

Evaluation

The objective of Evaluation element is to:

◈ Carry out regular audits of the technical security of IT systems

◈ Supervise and check compliance with security policy and security requirements in SLAs and OLAs

Maintain

The objective of Maintain element is to:

◈ Improve on security agreements as specified in, for example, SLAs and OLAs

◈ Improve the implementation of security measures and controls

Preventive

This key element ensures prevention from security incidents to occur. Measures such as control of access rights, authorization, identification, and authentication and access control are required for this preventive security measures to be effective.

Reductive

It deals with minimizing any possible damage that may occur.

Detective

It is important to detect any security incident as soon as possible.

Repressive

This measure is used to counteract any repetition of security incident.

Corrective

This measure ensures damage is repaired as far as possible.

Tuesday, 2 October 2018

Business Process Vs Project Management Process

There is a lot of ambiguity differentiating process management and project management process. The two procedures seem to be identical but actually business process and project management process are two absolutely different set of skills. Business Management circles are debating that we should be creating organizations that are led by process management and, in turn, form Quality Management Environments for support. Whereas there are also some circles that tend to fall for Project Management because of the operational efficiency and reduced manpower.

Business Process, Project Management Process, Project Management Study Material

This is of course a lengthy conversation and demands detailed explanation. However; I think that the choice depends upon the type of organization and kind of business. But first I am going to elaborate the definitions of the processes and later move to pros and cons.

What is a Process and Business Process Management?


Process Management defines around the governance of ongoing operations of a process. A process is generally ongoing and normally doesn’t have an end. It is a recurring series of repetitive tasks. Process Management is a continuous analysis for improvement or reengineering with no clarity defined beginning and end states.

Business management process or BPM is a methodical approach of assembling an organization’s workflow to make it sustainable and capable for an adaption to the changing environment.

What is a Project and Project Management Process?


Project Management aims to accomplish an objective by initiating, planning, executing and controlling the work. A project has a beginning and ending either well defined or not. Unlike process a project is not repetitive and project management is mainly focused on managing a project using different processes to achieve the desired results.

Project Management or PMP is the integration of all processes, methods, knowledge and skill to meet some pre-determined objectives. Project Management Methodologies differ from project to project and system to system.

So, as we see, there are some critical differences between BMP and PMP. The principal difference is the time dependability factor. The choice is up to the CEO’s and managers to select any of them, keeping in mind the intricate details.

Benefits of BPM:


BPM is a series of repetitive steps so stakeholders are confident to achieve a concrete goal. A process is generally automated in a standardized optimized way or can be manually operated without assisting technology. It is visualized by a flowchart of logical steps, so it is easy to maintain and monitor. Following are the methodologies and tools of Business Processes Management.

◈ Life Cycle Improvement of a project by modeling, implementation and monitoring.

◈ Process Discovery of a system to identify the areas of operation which could benefit and increase efficiency

◈ Simulation of a process before execution or during development.

◈ Enables Business Analysts, Managers, and Architects to create and design business process diagrams.

Challenges of BPM:


BPM sometimes becomes a challenge because of the following issues

◈ Slowing or halting of a process at a specific stage due to a human error or difficulty.

◈ The Duplication of work and redundancy due to inefficient processes often having some areas that are repeated or unnecessary.

◈ Lack of recognition because the management does not have a way of viewing where processes stand, what the status is, and how they are performing generally, and specifically.

◈ Communication gaps between the systems which cause malfunctioning.


Benefits of PMP:


PMP is time driven and requires extreme programming and predetermination instincts. A project has different phases or is subdivided into further projects. Sometimes a project is a part of a bigger project of a bigger project. Project Management is a bigger picture of process management. Following are some benefits of PMP.

◈ Project management provides a “roadmap” that is easily followed and leads to project completion for better Efficiency in Delivering Services.

◈ Improves growth and development within your team and inspires you and your team to look for ways to perform more efficiently.

◈ It provides opportunities to expand your services by great performance that leads to more opportunities to succeed.

◈ Increase in Quality and quantity and all risks are analyzed

Challenges of PMP:


PMP has following challenges

◈ Late completion of projects gets over-budgeted and causes dissatisfaction of clients.

◈ Project management is sometimes reactive and is not seen as providing value

◈ Project management is considered ‘overhead’ because of the heavy time and overtime required to complete the job.

Saturday, 29 September 2018

Identifying The Difference Between PgMP® vs PMP®

With so many certifications existing in the spectrum of Project Management Institute (PMI), it’s no wonder that candidates are overwhelmed by the selection of credentials they need for their career. It’s not all about which certification has more value, but rather which certification caters to the preference of an individual. Granted, these certifications have received the exposure that they deserved, but this article will focus solely on the most common and probably most coveted certification in different types of industry: Project Management Professional ( PMP )® and Program Management Professional ( PgMP )® certifications. The difference between PgMP® vs PMP® is wholly different, yet similar. Different in terms of features and target aspirants and similar in terms of which type of avenue they are applied, as well as some of the processes that come with it.

PgMP Certification vs PMP Certification, All PMI Certification, Project Management Study Materials

Before asking yourself which certification works for you and gives you value, you have to understand their overall features first. This means understanding what project and program are and the certifications that they are connected with.

The Difference Between PgMP® vs PMP® are the roles and responsibilities of the individual taking it


Let us understand the two components that make up both the PgMP® and PMP® certifications—project management and program management.

Project Management


In the world of ideas, tasks, and business, a project is a temporary activity which its sole purpose is to make a product or service and delivering these results to the clients or stakeholders. A project begins and ends in a particular period and specific tasks or operations are designed to achieve a goal or an objective. Buildings, bridges, and dams—these are the few structures born out from projects. They all undergo different project processes in order to be built successfully for public or private usage.

Now the process for this is called project management. It is the implementation of skills, knowledge, and strategies of projects in order to meet the expected requirements. There are five stages of project management and these are: initiating, planning, executing, monitoring and controlling, and closing.

The project manager is the person in charge of such operations and he or she ensures that the projects implemented are successful and in good quality. Projects composed of teams working hard in order to meet the needs of the clients or stakeholders. The project manager distributes tasks for each team members and manages not only the team, but the constraints of budget, schedule, tools, and resources.

Program Management


A program, on the other hand, is a set of multiple projects operating together to achieve a clear business case. Unlike a project, a program is a group of interconnected projects and one project cease to function or operate if another project is missing. In other words, a project under a program cannot be separated since it won’t operate if it’s a single entity.

Program management is the process of managing multiple projects such as enhancing the organization’s performance. It is typically related to change management, business transitions, industrial engineering, and other related processes. A program manager oversees these program operations and he or she is main decision makers of all project structures. He or she governs the interdependencies involved in the projects. These projects have their own leaders, but the ultimate upper hand falls to the program manager who ensures resources are accessible for the teams in order to operate the projects.

Now that we are able to distinguish these two approaches, let us now determine the difference between PgMP® vs PMP® and their respective values for the certified candidates.

The Difference Between PgMP® vs PMP® falls on more than one spectrum


So what is the difference between PgMP® vs PMP® certification? Is it the exam? The process? The significance of one’s career? Yes, these are some of the elements that make PgMP® and PMP® distinct to each other. From requirements to processes, PgMP® and PMP® have both something to offer when it comes to their differences.

Requirements and Candidates


Both PgMP® and PMP® certifications require an exam, as well as the following qualifications in order for the candidate to proceed with the test. PMP® caters to experienced project managers while PgMP® inclines on professional program managers. Both certifications also help an aspirant to boost his or her career, as well as knowledge in each field.

PgMP® certification requires a highschool diploma or an associate’s degree, with 4 years of experience in project management and 7 years of experience in program management; a bachelor’s degree is also qualified for PgMP®, provided it is accompanied by 4 years each of experience in program and project management.

The PMP® certification is similar with PgMP® in terms of educational requirement, except for this certification an applicant needs 7,500 hours leading and directing projects, as well as 35 hours of project management education. For applicants with a bachelor’s degree, they need to have at least 4,500 hours leading and directing projects and also 35 hours of project management education.

Features


PgMP® certification has a longer process compared to PMP®. Even before PgMP® applicants take the test, they need to undergo a panel review and sometimes an audit where they document their project and program endeavors and have their supervisors or managers vouch for their claim. PgMP®’s requirements are more inclined to PMP®. On the other hand, PMP® is all about fulfilling the requirements for legibility. PMP® certification is four times less costly compared to PgMP®—due to the process, random audits, and maintenance, the latter requires more than just an exam fee. And even are both considered the most sought-after certifications in the industry, PgMP® is a more complex process to achieve, thanks to their several processes involved.

Choosing the Right One


Actually, there is no right one or the adage, “there can only be one”. You can actually have both! If you want to settle to PMP®, that’s fine. And if you want to go up and pursue PgMP® after, there is nothing wrong with that, too. At the end of the day, it’s all about your preference and your determination to steer your ship around to a new adventure of your career endeavor. These certifications provide you a set of advanced skill, knowledge, and capability — so why not grab all of them by the horns?

Thursday, 27 September 2018

Which Certification Is Right PMP® Or PMI-ACP® ?

PMP® Or PMI-ACP®? Needless to know whether you have come up with this dilemma or not! It’s a way too common these days. Almost 50% of people looking for professional certification are wondering which one to opt for in between PMP® and PMI-ACP®.

PMP Certification, PMI-ACP Certification, Process Guides, Process Study Materials

First and foremost it would be better if you list out your specific requirements prior deciding on the professional certification course.

As a PMP® manager your roles would entitle you to:

◈ Leader: Capability to Lead and direct projects.

◈ Control: Control and regulate all the aspects of the project for its sustenance.

◈ Manage Teams: Manage teams and cross functional teams for the completion of the project within the constraints of budget and time schedule allotted.

◈ Apply Knowledge: Have sufficient knowledge and experience of the specific methodology required for the project in hand.

As an agile practitioner your roles would entitle you to:

◈ Understanding Agile: Understanding of agile methodology and concepts

◈ Agile Practices : Work with project teams that are specifically devised for agile practices

◈ Management: Strive to achieve lean management

◈ Have Proficiency: Proficiency in utilizing agile tools and techniques

Now, if you have all ‘yes’ for one certification then you have your answer. However, it often happens professionals get confused even after underling the roles of both the certifications. They have ‘yes’ for both the certifications. This is where the juggling takes place.

What to do when there is a tie between both PMP® and PMI-ACP®. I have devised a little questionnaire for you. Score ‘1’ if you are affirmative in either PMP® or PMI-ACP®. This table is devised keeping in view the roles you wish to adhere to and aspire to play.

PMP PMI-ACP 
You monitor projects but you do not interact with complete team, you only interact with few set of people and manage project in organized environment. You are leading team and interact with each team member on regular basis. 
You only look at results which team produces, someone else is responsible to ensure that team produce the result. You are responsible for your teams productivity, you are the one who sees the gaps and find solutions if team fails to produce desired results. 
You do not get into details of how the software develops, you never bother about the build integration and coding issues. You are responsible to ensure that your team usage right development practices so the productivity gets enhanced. 
You are working on system integration projects where you have multiple team associated with you and your main role is to identify and solve dependencies. You are working as Project Manager of development team of 10-15 size and your main role is to ensure delivery, and you do use agile values in making day to day decisions. 
You need to prepare complex project planning and monitoring reports which goes to management at frequency for review- the documentations. You do prepare status reports but they are not that complex, they goes to management but management also connected with you and they do discuss status with you when they need details. 
You need to interact with many stakeholders; these stakeholders have been managing project traditionally for a while. Your management is moving towards agile, they want to be lean as soon as possible. 

Whichever side scores more would be your option. If you score same on both the sides then my recommendation would be to opt for PMI-ACP® first since its new and highly advanced methodology. Once done with PMI-ACP® certification you can do PMP® which would be an add-on to your expertise and bring in more credits.

Tuesday, 25 September 2018

Common Success Factors, Uncommon Success in Europe

Whether implementing Six Sigma in Munich or Manhattan, Paris or Prague, certain common factors are critical for success. Nonetheless, how one successfully applies these factors is culturally dependent.

Universal Critical Success Factors


Accepting the General Electric definition of Six Sigma as “completely satisfying customers’ needs profitably” means that Six Sigma requires a company-wide initiative to dramatically improve process performance. It means that every employee in a company learns a structured approach to managing improvement projects and solving problems using facts and taking the customer’s perspective. It means on-target performance with minimum variation. With those givens in mind, here are some of the factors of Six Sigma which are considered universal:

◈ Clear Project Chartering and Sponsorship: Defining the business case for the project, scope, baseline measures, resources required, potential risks and naming a senior executive as mentor/sponsor for the life of the project.

◈ Identification of Customers and Their Needs: Identifying who receives the outcome of the process and what is critical to quality from their perspective.

◈ Application of Measures: Describing the outcomes (Ys), process and input (x’s) measures upon which the project will focus.

◈ Analysis of Causal Variables: Using quantitative methods to define causal relationships and the vital few variables that impact the desired outcome.

◈ Improvement of Mean Performance and Sigma Levels: Reducing variability, not just average performance.

◈ Standardization and Application of Control Charts: Putting in place the tools to track performance on an ongoing basis.

Case studies of two European companies show how they successfully maintained these foundation elements yet adapted Six Sigma to their national and company cultures.

Siemens – Business Improvement with Six Sigma as Toolkit


Siemens is an example of a German multinational company that carefully thought through its approach to Six Sigma, with a focus on improving collective business performance. Important to Siemens was how Six Sigma fits with other improvement initiatives such as ISO 9000 or the European Foundation for Quality Management (EFQM) Business Excellence Model. Not one to take on the “flavor of the month,” Siemens carefully assessed what contribution Six Sigma could make and integrated it into a comprehensive, logical approach to improvement called Top+ Quality.

Figure 1: Six-Step Top+Quality Approach


Using the framework illustrated in Figure 1, Siemens clearly spells out the responsibilities of senior managers as well as project leaders in business improvement. In Steps 1 through 3, senior managers identify in measurable terms the business benefits they want to achieve through quality improvement – reductions in non-conformance costs, improved benefits to customers or both. They use the results of benchmarking or EFQM assessments to help identify problem areas and set improvement targets. In identifying the drivers or levers of improvement, senior managers can select from them the ones best solved through Six Sigma (i.e., those related to processes or input variables)

Other improvement levers, for example, a customer database, are identified and addressed using different improvement methods. Where appropriate, Six Sigma projects are then clearly scoped, team leaders are assigned and training is linked to concrete actions – Steps 4 and 5. Senior management stays involved in two ways. As illustrated in Step 6, their job is to be sure the critical parameters related to Six Sigma and other improvement projects are defined, monitored and responded to accordingly. Here, Siemens makes the link to balanced scorecards which are used in many divisions. The supporting elements of the Top+Quality improvement circle also are the responsibility of senior management – devoting time and attention, making processes and improvement activities visible/transparent, selecting the right project leaders, and giving these leaders appropriate training and time to see their actions through to results.

The benefit of the Siemens approach is the top-down link to business improvement objectives, the distinction between process/input levers and other levers which are important but not suited for Six Sigma, and finally the highlighting of senior management’s role throughout the process. By positioning Six Sigma as a toolkit in a larger improvement methodology, Siemens concentrates on overall business improvement and effectiveness.

Ericsson – A Vehicle for Individual and Organizational Change


Ericsson is a Swedish multinational that is an example of a company Ericsson whose approach to Six Sigma balances the needs of the company with the needs of the individuals on whose support success depends. Because implementing Six Sigma often entails radical changes, receptivity to change – for an individual as well as an organization – is an important predictor of success. Clairy Wiholm, a Six Sigma deployment manager for Ericsson, researched the variables that influence an individual’s readiness for change. Figure 2, provided by the Ericsson Quality Management Institute, outlines these elements of change capability.

Figure 2: Elements of Change Capability


Having defined and validated the elements of change capability, the Ericsson team leading the Six Sigma implementation could measure and help prepare those for whom Six Sigma is an appropriate improvement approach. Wiholm and her colleagues stress that it is not important that the entire population in a given business unit be “fit for change.” As depicted in Figure 3, there will be a normal distribution in people’s reaction to change.

Figure 3: Change Reactions


By making the topic of change explicit, a number of critical questions were discussed and addressed: What is a given business unit’s average change capability? What profile do the business leaders have? How can the 20 percent who are early Six Sigma adopters help show the majority who “go with the flow” that there is something in it for them? These are issues critical to when and how each business unit embraces Six Sigma. Once a business unit has decided to proceed, modules of the Six Sigma training specifically help participants understand why they react to change as they do, and help them become more fit for change, thereby increasing the chances of their success in Six Sigma.

In addition, because Ericsson recognizes the need to engage on the individual level, it designed its Six Sigma training with an opportunity for “contracting” between project leaders and their managers. The manager of each participant in a Six Sigma Black Belt course attends one day during the first week of training. This gives time off-line for the manager to clarify a number of critical elements – why the person was selected, why the project was chosen, how the success or failure of the project will affect the individual’s career. Likewise, the project leader can negotiate for the time needed to work on the project assignment and the support he/she will need from the supervisor. Particularly in companies where Black Belts are balancing project work with operational responsibilities, contracting for time to work on assignments is vital to the success of Six Sigma.

Ericsson demystified change in measurable and practical terms. By weaving change management modules and contracting sessions into Six Sigma training Ericsson significantly increased the probability of success.